[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-504595-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-504595-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","sbac-member-facility-questions-answers-by-facility-director-dave-bagdasarian","SBAC Member Facility Questions & Answers by Facility Director Dave Bagdasarian","","SBAC members ask Facility Director Dave Bagdasarian for quantitative and updated facility information addressing flooring maintenance costs, roof condition changes since 2019, and storage needs for elementary and middle schools. Responses correct earlier cost claims, provide maintenance labor and chemical expenditure context, summarize annual roof survey approach and replacement budget figures, and outline design and operational recommendations for dedicated storage space and program-specific storage placement. Additional assessments and administrative area needs are also referenced.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/sbac-member-facility-questions-answers-by-facility-director-dave-bagdasarian/504595/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/sbac-member-facility-questions-answers-by-facility-director-dave-bagdasarian/504595.png","ImageObject",300,407,{"name":42,"@type":43},"\tCallum ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-04","2026-10-03",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"How does the director respond to claims about VCT flooring maintenance costs?","Question",{"text":63,"@type":64},"He states the $600,000 annual savings estimate is inaccurate and challenges the repeated claim of million-dollar annual summer floor maintenance by citing historical chemical spending and custodial payroll context.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What roof update process is used, and how are repair proposals prepared?",{"text":68,"@type":64},"The roofs are surveyed yearly, using Tecta America, which produces repair proposals based on its assessment and uses the roof’s average age versus typical lifespan as supporting context.",{"name":70,"@type":61,"acceptedAnswer":71},"What recommendations are given to address school storage needs in renovation design?",{"text":72,"@type":64},"He recommends grade-level dedicated storage equivalent to one classroom’s square footage, teacher time to review and clean each year, program-specific storage placement, and additional stand-alone or near-stage storage for athletics, drama/music, and allied arts.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},504595,1791306787,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":111,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":117,"preview_page_count":33,"preview_urls":144},137451211410,"https://ap-avatar.wpscdn.com/avatar/2000bb0a9246f588df?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786362646172706240","SBAC Member Facility Questions & Answers by Facility Director Dave Bagdasarian  \n(questions received by 6/23/23)  \n1. Austin Smith (Scott Simons Architects) estimated replacement of the VCT flooring with a more durable flooring could save approximately $600,000 in annual  \nmaintenance expenses. Please provide a rough estimate of the annual number of person-hours devoted to VCT flooring maintenance and rough dollar value of those services. ( LB)  \nI had not heard that particular statement before, but I can tell you it is inaccurate. Another inaccurate piece of information often repeated is that our summer floor maintenance costs over a million dollars annually. While I can 't speak to Austin 's statement, the million-dollar-a-year number was from the former Facilities Director, Perry Schwarz. He misspoke and was likely talking about over ten years.  \nTo give you some perspective. This past year we spent about $84, 000 on chemicals for the entire town and school. The weekly payroll for the custodial crew is approximately $34, 000/week:  \n8 * 34k = $272, 000 + $84, 00 = $356,000  \nSo even offering the most significant numbers I can, it's not even close. It consumes 50% of about 15 (20 custodians on staff) people 's time over eight weeks.  \n15 people * 20 hours * 8 weeks = 2,400 hours, roughly $25,500.  \nMoney aside, what we would gain the most is 2,400 hours of work to put toward the building in other ways. We could spend more time cleaning the classrooms and taking on different annual projects, such as having them scrub the walls, paint them, clean exterior glass, etc.  \n2. Please update the “Pond Cove and Middle School Roof Diagram” on Page 98 of  \nthe Cape Elizabeth Schools Needs Assessment Report with any new information or material change in the condition of the roofs since 2019. ( LB)  \nPlease see the roof attachment. Yearly the roofs are surveyed. We use Tecta America, and they put together repair proposals for the issues as they see them. Based on their assessment, the roof's average age is 20 years, the generally accepted lifespan of that sort of roof, given the maintenance (or lack thereof).  \nYou will see rough budget numbers for replacement costs in that roof attachment. In Pond Cove, replacing 3rd grade, section D, the price is estimated at $460, 000-The numbers add up quickly, and without a clear plan for the future, it wouldn 't be fiscally responsible for putting that much into it at this juncture.  \n3. Colby stated in the 2019 needs assessment: “Though there appears to be a  \nreasonable amount of dedicated storage throughout the building, faculty reported that storage was an issue, and that shelving and storage within the classroom spaces tended to be inadequate, or were not matched to their specific needs.”  \nParadoxically, the total space per student for the elementary and middle schools is respectively 45% and 28% greater than current state standards ( Maine DED, Space Allocation Guidelines 2 – Elementary School 140 square feet per student, Middle School 160 square feet per student) .  \nColby offered explanations, but they don’t seem to adequately explain the inefficient utilization of existing space and/or unusually high volume of stored equipment and materials. What factors do you regard as most important for the CESBAC, the Owner’s Representative and Architect to consider in addressing the storage needs in the design of possible building renovation plans or combination of new construction and renovation? ( LB)  \nThis is a great question! From my perspective and the teachers I ’ve spoken with, the built-in storage in many classrooms could be adequate if they had time to review and dispose of things each year and a larger central storage area. Almost every room has  \nadditional storage units, whether racks or cabinet chests, and some significant discrepancies exist between each classroom.  \nThere are also some significant storage discrepancies among programs that likely predate the staff running them now. Mos","cbCair5HIZM1TqVu","https://ap.wps.com/l/cbCair5HIZM1TqVu","pdf",122841,"English","# Facility Director Q&A\n## VCT flooring maintenance cost and labor estimates\n## Pond Cove and Middle School roof update since 2019\n## Storage needs and design considerations for renovation\n## Additional facilities assessments (HVAC, roof, LED, windows)\n## Admin area support and additional needs","[{\"question\":\"How does the director respond to claims about VCT flooring maintenance costs?\",\"answer\":\"He states the $600,000 annual savings estimate is inaccurate and challenges the repeated claim of million-dollar annual summer floor maintenance by citing historical chemical spending and custodial payroll context.\"},{\"question\":\"What roof update process is used, and how are repair proposals prepared?\",\"answer\":\"The roofs are surveyed yearly, using Tecta America, which produces repair proposals based on its assessment and uses the roof’s average age versus typical lifespan as supporting context.\"},{\"question\":\"What recommendations are given to address school storage needs in renovation design?\",\"answer\":\"He recommends grade-level dedicated storage equivalent to one classroom’s square footage, teacher time to review and clean each year, program-specific storage placement, and additional stand-alone or near-stage storage for athletics, drama/music, and allied arts.\"}]","SBAC Member Facility Questions & Answers by Facility Director Dave Bagdasarian | PDF",1791070911,[145,149,153,157],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c033c8bea6610393b624dd3568f0b870.webp",983,1272,{"page_no":26,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d5c7157d29eb56dfc323e04b850a227e.webp",982,1270,{"page_no":30,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/eefe76edcf767a29a62d51d42affdbe2.webp",981,1269,{"page_no":33,"url":158,"width":159,"height":160},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a2dfd568475930813c3d3dfdecd9142f.webp",980,1268]