[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111253-en":3,"doc-seo-111253-105":28,"detail-sidebar-cat-0-en-105":88},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},111253,1649267921044,"Ava Thompson","https://us-avatar.wpscdn.com/avatar/1800007509477c92dfb?_k=1782875107921204101",8,"Research & Report","Sao Tome and Principe - Second Transport Sector Development and Resilience Project - Approval on an Absence-of-Objection Basis - April 7, 2026","Approval on an absence-of-objection basis was granted on Tuesday, April 7, 2026 for the Second Transport Sector Development and Resilience Project for São Tomé and Príncipe. The Executive Directors approved a grant of SDR 29.4 million (US$40.5 million equivalent) and an additional US$12.84 million grant from the Least Developed Countries Fund (LDCF) of the Global Environment Facility (GEF). Terms and conditions are set out in the President’s Memorandum (IDA/R2026-0072 [GEF/R2026-0002], dated March 19, 2026).","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Tuesday, April 7, 2026  \nSao Tome and Principe-Second Transport Sector Development and Resilience Project  \nThe Executive Directors approved on April 7, 2026 a grant in the amount of SDR 29.4 million (US$40.5 million equivalent) to São Tomé and Príncipe for a Second Transport Sector Development and Resilience Project, together with a grant in the amount of US$12.84 million from the Least Developed Countries Fund (LDCF) of the Global Environment Facility (GEF) on the terms and conditions set out in the President’s Memorandum (IDA/R2026-0072[GEF/R2026- 0002], dated March 19, 2026) .","cbCaiioldMlGNX4a","https://ap.wps.com/l/cbCaiioldMlGNX4a","pdf",107260,1,"English","en",105,"# Project approval on absence-of-objection basis\n## Approval date and approving authority\n## Approved grants and amounts\n## Funding source and terms reference","[{\"question\":\"What approval was issued on April 7, 2026?\",\"answer\":\"Executive Directors approved the Second Transport Sector Development and Resilience Project for São Tomé and Príncipe on an absence-of-objection basis.\"},{\"question\":\"How much funding was approved for the project?\",\"answer\":\"A grant of SDR 29.4 million (US$40.5 million equivalent) was approved, along with an additional US$12.84 million from the LDCF of the GEF.\"},{\"question\":\"Where are the terms and conditions documented?\",\"answer\":\"The terms and conditions are set out in the President’s Memorandum (IDA/R2026-0072 [GEF/R2026-0002], dated March 19, 2026).\"}]",1784489324,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":83,"head_meta":85,"extra_data":87,"updated_unix":26},"sao-tome-and-principe-second-transport-sector-development-and-resilience-project-approval-on-an-absence-of-objection-basis-april-7-2026","",{"@graph":34,"@context":82},[35,51,65],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/sao-tome-and-principe-second-transport-sector-development-and-resilience-project-approval-on-an-absence-of-objection-basis-april-7-2026/111253/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":59,"encodingFormat":58,"isAccessibleForFree":60,"interactionStatistic":61},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":62,"interactionType":63,"userInteractionCount":4},"InteractionCounter",{"@type":64},"ViewAction",{"@type":66,"mainEntity":67},"FAQPage",[68,74,78],{"name":69,"@type":70,"acceptedAnswer":71},"What approval was issued on April 7, 2026?","Question",{"text":72,"@type":73},"Executive Directors approved the Second Transport Sector Development and Resilience Project for São Tomé and Príncipe on an absence-of-objection basis.","Answer",{"name":75,"@type":70,"acceptedAnswer":76},"How much funding was approved for the project?",{"text":77,"@type":73},"A grant of SDR 29.4 million (US$40.5 million equivalent) was approved, along with an additional US$12.84 million from the LDCF of the GEF.",{"name":79,"@type":70,"acceptedAnswer":80},"Where are the terms and conditions documented?",{"text":81,"@type":73},"The terms and conditions are set out in the President’s Memorandum (IDA/R2026-0072 [GEF/R2026-0002], dated March 19, 2026).","https://schema.org",{"og:url":49,"og:type":84,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":86,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":89},[90,94,98,102,107,112,117,120,125,128,132],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":91,"show_sort_weight":92,"slug":93},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":95,"show_sort_weight":96,"slug":97},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":99,"show_sort_weight":100,"slug":101},"Exam",70,"exam",{"id":103,"doc_module":4,"doc_module_name":44,"category_name":104,"show_sort_weight":105,"slug":106},5,"Comic",60,"comic",{"id":108,"doc_module":4,"doc_module_name":44,"category_name":109,"show_sort_weight":110,"slug":111},6,"Technology",50,"technology",{"id":113,"doc_module":4,"doc_module_name":44,"category_name":114,"show_sort_weight":115,"slug":116},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":118,"slug":119},30,"research-report",{"id":121,"doc_module":4,"doc_module_name":44,"category_name":122,"show_sort_weight":123,"slug":124},9,"Religion & Spirituality",20,"religion-spirituality",{"id":123,"doc_module":4,"doc_module_name":44,"category_name":126,"show_sort_weight":123,"slug":127},"World Cup","world-cup",{"id":129,"doc_module":4,"doc_module_name":44,"category_name":130,"show_sort_weight":129,"slug":131},10,"Lifestyle","lifestyle",{"id":133,"doc_module":4,"doc_module_name":44,"category_name":134,"show_sort_weight":103,"slug":135},19,"General","general"]