[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-203202-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-203202-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","san-simeon-csd-november-2025-monthly-operations-report-wastewater-treatment-plant","San Simeon CSD November 2025 Monthly Operations Report - Wastewater Treatment Plant","","Monthly operations reporting for the San Simeon Community Services District wastewater treatment plant, water system, and collection system for November 2025. Operations were routine with no notable projects or unexpected maintenance. A Balboa Street service line repair was completed due to a pinhole leak, and forecast-driven filter start-up and bacteriological sampling were performed, with non-detect results for coliform and HPC. Staff finalized compliance submissions through CIWQS, including self-monitoring and discharge monitoring reports. Monitoring tables document influent/effluent flows, BOD/TSS, dissolved oxygen, turbidity, pH, temperature, chlorine use and residual, sludge removal, and effluent limits.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/san-simeon-csd-november-2025-monthly-operations-report-wastewater-treatment-plant/203202/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/san-simeon-csd-november-2025-monthly-operations-report-wastewater-treatment-plant/203202.png","ImageObject",300,407,{"name":42,"@type":43},"นรินทร์","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-03","2026-09-04",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",19,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What key operational activities occurred during November 2025?","Question",{"text":63,"@type":64},"Wastewater system operations were routine with no notable projects or unexpected maintenance items. The service line on Balboa Street was repaired due to a pinhole leak, and filters were put into use with required bacteriological sampling before continuing operation.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What were the results of the filter start-up bacteriological samples?",{"text":68,"@type":64},"Filter start-up samples showed non-detect results for all coliforms and non-detect for heterotrophic plate count (HPC), supporting proper filter function.",{"name":70,"@type":61,"acceptedAnswer":71},"How were compliance reports prepared and submitted?",{"text":72,"@type":64},"Staff compiled the data to complete the monthly Self-Monitoring Report and Discharge Monitoring Report in CIWQS. After approval, the reports were uploaded to CIWQS and certified by SSCSD staff.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},203202,1788556821,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":124,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":143,"preview_page_count":4},2336475104957,"https://ap-avatar.wpscdn.com/avatar/22000c4c6bd8a5076e1?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787554080175789136","November 24, 2025  \nSan Simeon Community Services District  \n111 Pico Avenue  \nSan Simeon, CA 93452  \nSUBJECT: NOVEMBER 2025 MONTHLY FACILITY REPORT FOR THE SAN SIMEON COMMUNITY SERVICES DISTRICT WASTEWATER TREATMENT PLANT, WATER SYSTEM, AND COLLECTION SYSTEM  \nWASTEWATER TREATMENT PLANT  \nWastewater system operations were routine; there were no projects of note or unexpected maintenance items.  \nWATER SYSTEM  \nA service line was repaired at Balboa Street on November 12th due to a pinhole leak.  \nDue to forecasted rainstorms , the filters for the treatment facility building were put into use on November 13th, and the required bacteriological samples were collected to ensure proper function. Results for the filter start-up samples were Non-Detect for all coliforms, and Non-Detect for Heterotrophic Plate Count (HPC) . Surface water was observed in Pico Creek beginning on November 17th, and the filters remain in use at this time.  \nCOMPLIANCE  \nStaff compiled the data to complete the monthly Self-Monitoring Report and Discharge Monitoring Report in California Integrated Water Quality System (CIWQS) . Once approved, the reports are uploaded into CIWQS and certified by SSCSD Staff.  \nSincerely,  \nFLUID RESOURCE MANAGEMENT  \nCalifornia Regional Water Quality Control Board, Central Coast Region  \nMonthly report due first day of second month following monitoring period Annual report due January 30  \nSan Simeon CSD Wastewater Treatment Facility  \nDISCHARGER SELF-MONITORING ORDER R3-2022-0003 NPDES CA0047961 WDID 3 400110001  \nMonth: NOVEMBER 2025  \n\n| Date | Influent\u003Cbr>Flow\u003Cbr>Total\u003Cbr>(GPD) | Effluent\u003Cbr>Flow\u003Cbr>Total\u003Cbr>(GPD) | Effluent Monitoring |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | Biweekly\u003Cbr>Total\u003Cbr>Coliform | Biweekly\u003Cbr>Fecal\u003Cbr>Coliform | Biweekly\u003Cbr>Entero\u003Cbr>coccus | Daily\u003Cbr>Settleable\u003Cbr>Solids\u003Cbr>(mL/L) | Daily\u003Cbr>Chlorine\u003Cbr>Used\u003Cbr>(lbs) | Daily\u003Cbr>Chlorine\u003Cbr>Residual\u003Cbr>(mg/L) |\n| 1 | 41,275 | 29,980 |  |  |  | \u003C0.1 | 91.5 | 0.02 |\n| 2 | 58,043 | 40,340 |  |  |  | \u003C0.1 | 91.5 | 0.00 |\n| 3 | 42,791 | 29,450 |  |  |  | \u003C0.1 | 53.4 | 0.05 |\n| 4 | 50,434 | 62,150 | \u003C1.8 | \u003C1.8 | \u003C1.0 | \u003C0.1 | 143.2 | 0.00 |\n| 5 | 45,384 | 46,930 | 2.0 | 2.0 | \u003C1.0 | \u003C0.1 | 143.2 | 0.03 |\n| 6 | 47,328 | 46,200 |  |  |  | \u003C0.1 | 95.5 | 0.03 |\n| 7 | 35,507 | 37,460 |  |  |  | \u003C0.1 | 13.5 | 0.05 |\n| 8 | 44,424 | 44,380 |  |  |  | \u003C0.1 | 45.2 | 0.03 |\n| 9 | 70,221 | 67,410 |  |  |  | \u003C0.1 | 91.5 | 0.02 |\n| 10 | 59,036 | 54,740 | \u003C1.8 | \u003C1.8 | \u003C1.0 | \u003C0.1 | 119.3 | 0.04 |\n| 11 | 62,837 | 49,010 | \u003C1.8 | \u003C1.8 | \u003C1.0 | \u003C0.1 | 119.3 | 0.01 |\n| 12 | 43,065 | 45,860 |  |  |  | \u003C0.1 | 95.5 | 0.00 |\n| 13 | 54,796 | 43,590 |  |  |  |  | 83.5 | 0.04 |\n| 14 | 45,257 | 31,660 |  |  |  | \u003C0.1 | 59.7 | 0.00 |\n| 15 | 51,874 | 36,860 |  |  |  | \u003C0.1 | 230.7 | 0.00 |\n| 16 | 124,574 | 94,100 |  |  |  |  | 67.6 | 0.06 |\n| 17 | 88,912 | 66,010 |  |  |  |  | 75.6 | 0.01 |\n| 18 | 132,780 | 102,640 |  |  |  | \u003C0.1 | 222.8 | 0.03 |\n| 19 | 54,912 | 79,520 |  |  |  |  | 107.4 | 0.01 |\n| 20 | 53,922 | 91,120 |  |  |  |  | 210.8 | 0.02 |\n| 21 | 56,553 | 74,520 |  |  |  |  | 59.7 | 0.00 |\n| 22 | 56,624 | 81,900 |  |  |  |  | 70.8 | 0.03 |\n| 23 | 64,465 | 92,200 |  |  |  |  | 115.4 | 0.08 |\n| 24 |  |  |  |  |  |  |  |  |\n| 25 |  |  |  |  |  |  |  |  |\n| 26 |  |  |  |  |  |  |  |  |\n| 27 |  |  |  |  |  |  |  |  |\n| 28 |  |  |  |  |  |  |  |  |\n| 29 |  |  |  |  |  |  |  |  |\n| 30 |  |  |  |  |  |  |  |  |\n| 31 |  |  |  |  |  |  |  |  |\n| Min | 35,507 | 29,450 | \u003C1.8 | \u003C1.8 | \u003C1.0 | \u003C0.1 | 13.5 | 0.00 |\n| Mean | 60,218.0 | 58,610.0 | \u003C1.8 | \u003C1.8 | \u003C1.0 | \u003C0.1 | 104.6 | 0.02 |\n| Max | 132,780 | 102,640 | 2.0 | 2.0 | \u003C1.0 | \u003C0.1 | 230.7 | 0.08 |\n| Total | 1,385,014 | 1,348,030 | Effluent average dry weather flow NTE a monthly average of 0.2 MGD. |  |  |  |  |  |\n\nI certify under penalty of perjury that the foregoing is true and accurate and that the sampling procedure and analysis used are as specified in the Waste Discharge Orde","cbCaih8h6KfDiVFB","https://ap.wps.com/l/cbCaih8h6KfDiVFB","pdf",948606,"English","# WASTEWATER TREATMENT PLANT\n## WATER SYSTEM\n## COMPLIANCE\n# Effluent and Influent Monitoring\n## Monthly Effluent/Influent BOD and TSS\n## Weekly Effluent Monitoring\n## Influent Brine Received\n## Sludge Removal\n## Semi-Annual Effluent Oil & Grease\n## Effluent Limits","[{\"question\":\"What key operational activities occurred during November 2025?\",\"answer\":\"Wastewater system operations were routine with no notable projects or unexpected maintenance items. The service line on Balboa Street was repaired due to a pinhole leak, and filters were put into use with required bacteriological sampling before continuing operation.\"},{\"question\":\"What were the results of the filter start-up bacteriological samples?\",\"answer\":\"Filter start-up samples showed non-detect results for all coliforms and non-detect for heterotrophic plate count (HPC), supporting proper filter function.\"},{\"question\":\"How were compliance reports prepared and submitted?\",\"answer\":\"Staff compiled the data to complete the monthly Self-Monitoring Report and Discharge Monitoring Report in CIWQS. After approval, the reports were uploaded to CIWQS and certified by SSCSD staff.\"}]","San Simeon CSD November 2025 Monthly Operations Report - Wastewater Treatment Plant | PDF",25]