[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-479710-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-479710-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","san-felipe-del-rio-consolidated-school-district-2026-2027-academic-calendar","SAN FELIPE DEL RIO CONSOLIDATED SCHOOL DISTRICT - 2026-2027 ACADEMIC CALENDAR","","SAN Felipe Del Rio Consolidated School District 2026-2027 academic calendar lists school days, teacher work days, and key academic milestones across July 2026 through July 2027. It specifies major holidays and observances, six-week instructional period start and end dates, parent/teacher conference days, RTI data planning days with no classes, and STAAR testing windows in December and May. It also includes instructional day counts by six-week period plus school-day instructional time by grade bands (Pre-K–5, 6–8, 9–12).",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/san-felipe-del-rio-consolidated-school-district-2026-2027-academic-calendar/479710/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/san-felipe-del-rio-consolidated-school-district-2026-2027-academic-calendar/479710.png","ImageObject",300,407,{"name":42,"@type":43},"MrHarris58","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-24","2026-09-30",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",18,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What are the major school start and six-week period dates for the 2026-2027 calendar?","Question",{"text":63,"@type":64},"The calendar lists the first day of school as July 10, 2026 with each six-week period beginning and ending on specified dates throughout the year, including starts for the 2nd through 6th six weeks.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which events create no-class days or additional planning time?",{"text":68,"@type":64},"RTI data planning days are marked as “No Classes,” including dates in September, December/January, and February. Parent/Teacher Conference Day entries are also designated “No Classes.”",{"name":70,"@type":61,"acceptedAnswer":71},"When does STAAR testing occur and how is daily instructional time defined by grade band?",{"text":72,"@type":64},"STAAR testing is scheduled for late November/December (1–11) and again in May (5–30). The calendar provides instructional-day time ranges and daily instructional minutes for Pre-K–5th grade, 6th–8th grade, and 9th–12th grade.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},479710,1793114743,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":30,"preview_page_count":22,"preview_urls":145},687212988360,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","SAN FELIPE DEL RIO CONSOLIDATED SCHOOL DISTRICT  \n2026-2027 ACADEMIC CALENDAR  \nJuly  \n3 Observance of Independence Day (27-31) New Teacher Orientation  \nAugust  \n1 New Teacher Orientation (3-6) Staff Development  \n7 Teacher Work Day  \n10 First Day of School/ Begin 1st Six Weeks  \nSeptember  \n7 Labor Day / Holiday  \n18 End 1st Six Weeks  \n21 RTI Data Planning / No Classes  \n22 Begin 2nd Six Weeks  \nOctober   \n12 Indigenous People's Day / Holiday  \n30 End 2nd Six Weeks  \nNovember  \n2 Parent/Teacher Conference Day / No Classes  \n3 Begin 3rd Six Weeks  \n11 Veteran's Day-Holiday (23-27) Thanksgiving Break  \n30 STAAR Testing  \nDecember  \n(1-11) STAAR Testing  \n18 End 3rd Six Weeks (21-31) Winter Break  \nJanuary  \n1 Winter Break  \n4 Teacher Work Day  \n5 RTI Data Planning/No Classess  \n6 Begin 4th Six Weeks  \n18 MLK Day / Holiday  \nFebruary  \n12 RTI Data Planning / No Classes  \n15 President's Day (Make-Up Day / If Applicable)  \n19 End of 4th Six Weeks  \n22 Parent/Teacher Conference Day / No Classes  \n23 Start of 5th Six Weeks  \nMarch  \n(8-12) Spring Break (26-29) Easter / Holiday  \n29 Make-Up Day / If Applicable  \nApril  \n9 End of 5th Six Weeks  \n12 Start of 6th Six Weeks  \n\n| July 2026 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |\n|  |  |  | 1 | 2 | 3 | 4 |\n| 5 | 6 | 7 | 8 | 9 | 10 | 11 |\n| 12 | 13 | 14 | 15 | 16 | 17 | 18 |\n| 19 | 20 | 21 | 22 | 23 | 24 | 25 |\n| 26 | \u003Cbr>27 | 28 | 29 | 30 | 31 |  |\n|  |  |  |  |  |  |  |\n\n\n| August 2026 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |\n|  |  |  |  |  |  | 1 |\n| 2 | 3 | 4 | 5 | 6 | 7\u003Cbr>| 8 |\n| 9\u003C\u003C | 10 | 11 | 12 | 13 | 14 | 15 |\n| 16 | 17 | 18 | 19 | 20 | 21 | 22 |\n| 23 | 24 | 25 | 26 | 27 | 28 | 29 |\n| 30 | 31 |  |  |  |  |  |\n\n\n| September 2026 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |\n|  |  | 1 | 2 | 3 | 4 | 5 |\n| 6 | 7 | 8 | 9 | 10 | 11 | 12 |\n| 13 | 14 | 15 | 16 | 17 | 18 > | > 19 |\n| 20 | 21 \u003C\u003Cbr>| \u003C 22 | 23 | 24 | 25 | 26 |\n| 27 | 28 | 29 | 30 |  |  |  |\n|  |  |  |  |  |  |  |\n\n\n| October 2026 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |\n|  |  |  |  | 1 | 2 | 3 |\n| 4 | 5 | 6 | 7 | 8 | 9 | 10 |\n| 11 | 12 | 13 | 14 | 15 | 16 | 17 |\n| 18 | 19 | 20 | 21 | 22 | 23 | 24 |\n| 25 | 26 | 27 | 28 | 29 | 30>> | 31 |\n|  |  |  |  |  |  |  |\n\n\n| November 2026 |  |  |  |  |  |  |  | December 2026 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |  | S | M | T | W | TH | F | S |\n| 1 | 2 \u003C | \u003C 3 | 4 | 5 | 6 | 7 | |  |  | 1 | 2 | 3 | 4 | 5 |\n| 8 | 9 | 10 | 11 | 12 | 13 | 14 | | 6 | 7 | 8 | 9 | 10 | 11 | 12 |\n| 15 | 16 | 17 | 18 | 19 | 20 | 21 |  | 13 | 14 | 15 | 16 | 17 | 18 > | > 19 |\n| 22 | 23 | 24 | 25 | 26 | 27 | 28 |  | 20 | 21 | 22 | 23 | 24 | 25 | 26 |\n| 29 | 30 |  |  |  |  |  |  | 27 | 28 | 29 | 30 | 31 |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n\n| January 2027 |  |  |  |  |  |  |  | February 2027 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |  | S | M | T | W | TH | F | S |\n|  |  |  |  |  | 1 | 2 | |  | 1 | 2 | 3 | 4 | 5 | 6 |\n| 3 | \u003Cbr>\u003Cbr>| 5\u003Cbr>| \u003C\u003C 6 | 7 | 8 | 9 | | 7 | 8 | 9 | 10 | 11 | 12\u003Cbr>| 13 |\n| 10 | 11 | 12 | 13 | 14 | 15 | 16 | | 14 | +15+ | 16 | 17 | 18 | 19 > | > 20 |\n| 17 | 18 | 19 | 20 | 21 | 22 | 23 | | 21 | 22 \u003C | \u003C 23 | 24 | 25 | 26 | 27 |\n| 24 | 25 | 26 | 27 | 28 | 29 | 30 | | 28 |  |  |  |  |  |  |\n| 31 |  |  |  |  |  |  | |  |  |  |  |  |  |  |\n\n\n| March 2027 |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| S | M | T | W | TH | F | S |\n|  | 1 | 2 | 3 | 4 | 5 | 6 |\n| 7 | 8 | 9 | 10 | 11 | 12 | 13 |\n| 14 | 15 | 16 | 17 | 18 | 19 | 20 |\n| 21 | 22 | 23 | 24 | 25 | 26 | 27 |\n| 28 | +29+ | 30 | 31 |  |  |  |\n|  |  |  |  |  |  |  |\n\n\n| April 2027 |  |  |  |  |  ","cbCaiiQf2BdA8COq","https://ap.wps.com/l/cbCaiiQf2BdA8COq","pdf",229053,"English","# Key Monthly Dates\n## July 2026 and August 2026\n## September 2026 and October 2026\n## November 2026 and December 2026\n## January 2027 and February 2027\n## March 2027 and April 2027\n## May 2027 to July 2027\n# Instructional Structure and Testing\n## Six-week period instructional day totals\n## STAAR testing and instructional minutes by grade bands","[{\"question\":\"What are the major school start and six-week period dates for the 2026-2027 calendar?\",\"answer\":\"The calendar lists the first day of school as July 10, 2026 with each six-week period beginning and ending on specified dates throughout the year, including starts for the 2nd through 6th six weeks.\"},{\"question\":\"Which events create no-class days or additional planning time?\",\"answer\":\"RTI data planning days are marked as “No Classes,” including dates in September, December/January, and February. Parent/Teacher Conference Day entries are also designated “No Classes.”\"},{\"question\":\"When does STAAR testing occur and how is daily instructional time defined by grade band?\",\"answer\":\"STAAR testing is scheduled for late November/December (1–11) and again in May (5–30). The calendar provides instructional-day time ranges and daily instructional minutes for Pre-K–5th grade, 6th–8th grade, and 9th–12th grade.\"}]","SAN FELIPE DEL RIO CONSOLIDATED SCHOOL DISTRICT - 2026-2027 ACADEMIC CALENDAR | PDF",1790793744,[146],{"page_no":22,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3ee68161320b17e88509e4eadab3b0b0.webp",983,1272]