[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649036-105":59,"doc-detail-649036-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","sample-drawings-building-permit-application-guide-exterior-openings","Sample Drawings Building Permit Application Guide - Exterior Openings","","Sample drawings for a building permit application focused on exterior openings. Provides drawing name and required elements for a site plan, proposed basement floor plan, proposed main floor plan, wall sections, and right side elevation. Specifies what to show for structures, hard landscaped surfaces, entrances, setbacks, and general notes including legends of line types, symbols, and hatchings. Includes detailed room layouts, opening locations and sizes, glass areas, dimensions, and construction/assembly notes such as lintels, flashing, weep holes, and drainage requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/sample-drawings-building-permit-application-guide-exterior-openings/649036/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/sample-drawings-building-permit-application-guide-exterior-openings/649036.png","ImageObject",300,407,{"name":92,"@type":93},"Riley West","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What information must the exterior openings site plan include?","Question",{"text":112,"@type":113},"It should include structures such as the house, porch and exterior stairs; hard landscaped surfaces like driveways and new walkways/patios; existing and new entrances; relevant setbacks for sides with new exterior openings, stairs, and walkways/patios; and general notes including legends of line types, symbols, and hatchings plus elevations and designer/project details.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What elements are required on the proposed floor plans for new openings?",{"text":117,"@type":113},"Each proposed floor plan must show the layout of existing floor level and the locations, sizes, and glass areas of new exterior/interior openings (windows/doors). It also requires dimensions for any new steps and stair landings, along with general notes and legends of symbols used.",{"name":119,"@type":110,"acceptedAnswer":120},"What construction details are specified in the wall section drawings?",{"text":121,"@type":113},"Wall section drawings specify structural elements and dimensions needed to support openings, including lintel sizing (wood and loose steel options), flashing and weep hole spacing, and exterior drainage and frost protection requirements. They also include notes about sealing door frames to exterior cladding and related build-up details.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649036,1792876257,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":29,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},1099523885074,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| \u003Cbr>PROJECT TRUE |  |  |  |  |  |  | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GUIDE: EXTERIOR OPENINGS DRAWING NAME:\u003Cbr>SITE PLAN NUMBER OF COPIES REQUIRED:\u003Cbr>DRAWING MUST INCLUDE/SHOW (IF APPLICABLE): STRUCTURES:\u003Cbr>-HOUSE (INCLUDING PORCH & EXTERIOR STAIRS)\u003Cbr>HARD LANDSCAPED SURFACES:\u003Cbr>-DRIVEWAY\u003Cbr>-ANY NEW WALKWAYS/PATIOS\u003Cbr>ENTRANCES:\u003Cbr>-EXISTING HOUSE MAIN ENTRANCE AND SECONDARY/OTHER ENTRANCES\u003Cbr>-ANY NEW ENTRANCES\u003Cbr>SETBACKS:\u003Cbr>-TO ANY SIDE OF HOUSE THAT HAS NEW EXTERIOR OPENINGS\u003Cbr>-TO ANY NEW EXTERIOR STAIRS\u003Cbr>-TO ANY NEW WALKWAYS/PATIOS\u003Cbr>GENERAL/OTHER NOTES:\u003Cbr>-LEGEND OF LINE TYPES, SYMBLOLS, AND HATCHING USED\u003Cbr>-IDENTIFY ELEVATION(S) WITH NEW EXTERIOR OPENINGS DESIGNER: J~~OE SMITH ~~\u003Cbr>PROJECT\u003Cbr>ADDRESS: MILTON,\u003Cbr>SHEET SIZE: 11\" X 17\" SHEET NO.\u003Cbr>O-1 DATE: JUNE 2018  SCALE: AS INDICATED |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| |  | \u003Cbr>ELEVATION WITH NEW\u003Cbr>\u003Cbr>DN 4R\u003Cbr>\u003Cbr>DN 1R \u003Cbr>\u003Cbr>SUNKEN LANDING\u003Cbr>MAIN FLOOR\u003Cbr>DN 1R\u003Cbr>\u003Cbr>\u003Cbr>DRIVEWAY\u003Cbr>\u003Cbr>\u003Cbr>2' -2\"(0.66 m)\u003Cbr>EXTERIOR OPENINGS |  |  |  |  |  |\n| |  |  |  |  |  |  |  |\n|  1 SITE PLAN O-1 1/8\" = 1'-0\"\u003Cbr>\u003Cbr>| |  | LEGEND\u003Cbr>\u003Cbr> | PROPERTY LINE\u003Cbr>ASPHALT DRIVEWAY\u003Cbr>24\" x 24\" CONCRETE\u003Cbr>PATIO STONE WALKWAY | | HOUSE MAIN ENTRANCE DOOR\u003Cbr>NEW EXTERIOR SIDE DOOR\u003Cbr>SECONDARY/OTHER DOOR |  |\n\n\n| SUMP | \u003Cbr>\u003Cbr>NEW 30\"x18\" SLIDER GLASS AREA 2.1 SF |  |  | O-5\u003Cbr>|  |  |  |  |  | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GUIDE: EXTERIOR OPENINGS DRAWING NAME:\u003Cbr>PROPOSED BASEMENT FLOOR PLAN 2\u003Cbr>\u003Cbr>DRAWING MUST INCLUDE/SHOW (IF APPLICABLE): ROOM/SPACES:\u003Cbr>-LAYOUT OF EXISTING FLOOR LEVEL\u003Cbr>NEW OPENING (WINDOW/DOOR):\u003Cbr>-LOCATION\u003Cbr>-SIZE\u003Cbr>-GLASS AREA\u003Cbr>DIMENSIONS:\u003Cbr>-ANY NEW EXTERIOR/INTERIOR STEPS\u003Cbr>-AND NEW INTERIOR/EXTERIOR STAIR LANDING\u003Cbr>GENERAL/OTHER NOTES:\u003Cbr>-LEGEND OF SYMBOLS USED DESIGNER: J~~OE SMITH ~~\u003Cbr>PROJECT ADDRESS:\u003Cbr>\u003Cbr>MILTON, SHEET SIZE: 11\" X 17\" SHEET NO.\u003Cbr>O-2 \u003Cbr>DATE: JUNE 2018 SCALE: AS INDICATED |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| DROPPED STL. BEAM\u003Cbr>30\"x 12\" 30\"x12\" |  | 3\" Ø . STL. COLUMN | | 3\" Ø . STL. COLUMN | | UP 12R\u003Cbr> SA | UTIL SINK\u003Cbr>\u003Cbr>FD |  |  |  |\n|  |  |  |  |  |  |  | HRV |  | FURNACE\u003Cbr>HWHEATER |  |\n| 30\"x12\"\u003Cbr>ELEC. PANEL |  |  |  |  |  |  |  |  |  |  |\n|  1 PROPOSED BASEMENT FLOOR PLANO-2 1/4\" = 1'-0\"\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  | LEGEND\u003Cbr>EXISTING CONSTRUCTION (GRAY) NEW CONSTRUCTION (BLACK) |  |  |\n\n| O-5\u003Cbr>\u003Cbr>DN 4R | \u003Cbr>NEW 34\"x80\" DOOR GLASS AREA = 5.17 SF\u003Cbr>5' -8 1/2\"\u003Cbr>1' -0\"\u003Cbr> DN 12R |  | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GUIDE: EXTERIOR OPENINGS DRAWING NAME:\u003Cbr>PROPOSED MAIN FLOOR PLAN NUMBER OF COPIES REQUIRED:\u003Cbr>2\u003Cbr>DRAWING MUST INCLUDE/SHOW (IF APPLICABLE): ROOM/SPACES:\u003Cbr>-LAYOUT OF EXISTING FLOOR LEVEL\u003Cbr>NEW OPENING (WINDOW/DOOR):\u003Cbr>-LOCATION\u003Cbr>-SIZE\u003Cbr>-GLASS AREA\u003Cbr>DIMENSIONS:\u003Cbr>-ANY NEW EXTERIOR/INTERIOR STEPS\u003Cbr>-AND NEW INTERIOR/EXTERIOR STAIR LANDING\u003Cbr>GENERAL/OTHER NOTES:\u003Cbr>-LEGEND OF SYMBOLS USED DESIGNER: J~~OE SMITH ~~\u003Cbr>PROJECT 123  ADDRESS: MILTON, \u003Cbr>SHEET SIZE: 11\" X 17\" SHEET NO.\u003Cbr>O-3 DATE: JUNE 2018 SCALE: AS INDICATED |\n| --- | --- | --- | --- |\n| UP 13R\u003Cbr>SA\u003Cbr>DN 1R\u003Cbr>PORCH\u003Cbr>DN 3R |  |  |  |\n| |  | LEGEND\u003Cbr>EXISTING CONSTRUCTION (GRAY) NEW CONSTRUCTION (BLACK) |  |\n\n| \u003Cbr>EXISTING 1⅛\" ENG. RIM JOIST\u003Cbr>TJI JOIST HANGER\u003Cbr> T/O  1ST FLR  0\"\u003Cbr>1¾\" x 9½\" LVL 2.0E LINTEL EXTENDING MIN 3\" BEYOND EACH SIDE OF OPENING\u003Cbr> 30\" x 18\" SLIDER WINDOW\u003Cbr> 42\" x 22\" WINDOW WELL\u003Cbr>\u003Cbr>\u003Cbr>6\" LAYER OF ¾\"CRUSHED STONE\u003Cbr>4\" DRAINAGE PIPE EXTENDING DOWN TO WEEPING TILE\u003Cbr>\u003Cbr>T/O BMST SLAB \u003Cbr>-8' -6\"\u003Cbr>TIE INTO EXISTING WEEPING TILE\u003Cbr>MINIMUM 3'-1 1\" ( 1.2 M ) FROST PROTECTION FOR FOOTINGS\u003Cbr>4\" | FLASHING AND WEEP HOLES @ 32\" o/c MAX OVER DOOR\u003Cbr>3½\" x 3½\" x ¼\" LOOSE STEEL LINTEL W/MIN 6\" END BEARING\u003Cbr>DOOR FRAME/TRIM SEALED TO EXTERIOR CLADDING |  | | 3-2\"x10\" LINTEL W/MIN 1½\" END BEARING AND 1\" RIGID FOAM SPACER |  | SAMPLE DRAWINGS BUILDING PERMIT APPLICATION GU","cbCaiffNzr0W6I3f","https://ap.wps.com/l/cbCaiffNzr0W6I3f","pdf",1390256,"English","# Site Plan\n# Proposed Basement Floor Plan\n# Proposed Main Floor Plan\n# Wall Sections\n# Right Side Elevation","[{\"question\":\"What information must the exterior openings site plan include?\",\"answer\":\"It should include structures such as the house, porch and exterior stairs; hard landscaped surfaces like driveways and new walkways/patios; existing and new entrances; relevant setbacks for sides with new exterior openings, stairs, and walkways/patios; and general notes including legends of line types, symbols, and hatchings plus elevations and designer/project details.\"},{\"question\":\"What elements are required on the proposed floor plans for new openings?\",\"answer\":\"Each proposed floor plan must show the layout of existing floor level and the locations, sizes, and glass areas of new exterior/interior openings (windows/doors). It also requires dimensions for any new steps and stair landings, along with general notes and legends of symbols used.\"},{\"question\":\"What construction details are specified in the wall section drawings?\",\"answer\":\"Wall section drawings specify structural elements and dimensions needed to support openings, including lintel sizing (wood and loose steel options), flashing and weep hole spacing, and exterior drainage and frost protection requirements. They also include notes about sealing door frames to exterior cladding and related build-up details.\"}]","Sample Drawings Building Permit Application Guide - Exterior Openings | PDF",1792796737,15]