[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649353-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-649353-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","sample-deck-drawing","Sample-deck-Drawing","","General construction drawing notes governing design and execution across multiple structural elements: verify discrepancies with the engineer, do not scale drawings, and ensure the structure remains stable and not overstressed during works. Verify all setting-out and off-site dimensions before commencement, using millimetres unless stated. Specify compliance with relevant Australian standards and statutory requirements, including wind load parameters (AS/NZS) and design live loads. Include site preparation and foundation checks, structural timber quality, concrete grade and curing, and structural steel detailing, welding, and bolt requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/sample-deck-drawing/649353/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/sample-deck-drawing/649353.png","ImageObject",300,407,{"name":42,"@type":43},"Supernature","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-03","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What general instructions apply to these drawings before construction starts?","Question",{"text":63,"@type":64},"The drawings must be read with all other consultant drawings and specifications, discrepancies must be referred to the engineer, and the engineer’s drawings must not be scaled. Relevant setting-out and off-site dimensions must be verified by the contractor before construction begins.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How are wind loads and design live loads defined?",{"text":68,"@type":64},"Design wind loads follow AS1170.2-2001 with the listed return period, region, terrain category, shielding, topographic factor, wind velocity, and pressure coefficients. Design live loadings follow AS/NZS1170.1:2002, including the deck loading of 3.0 kPa.",{"name":70,"@type":61,"acceptedAnswer":71},"What key requirements govern foundations and structural timber?",{"text":72,"@type":64},"For foundations, check footing excavations for organic material and rubbish, remove any found material, and compact disturbed bottoms to the specified relative dry density. For timber, follow AS1720 and related codes, reject abnormally green or split timber, ensure timber at joints has no defects, and protect timber from weather while meeting durability and fastening requirements.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},649353,1792799538,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":123},962093270004,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| GENERAL\u003Cbr>1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANT'S DRAWINGS AND SPECIFICATIONS. ALL DISCREPANCIES SHALL BE REFERRED TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK.\u003Cbr>2. ALL DIMENSIONS RELEVANT TO SETTING OUT AND\u003Cbr>OFF-SITE WORK SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION IS COMMENCED. THE ENGINEER'S DRAWINGS SHALL NOT BE SCALED.\u003Cbr>3. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE STRUCTURE INA STABLE CONDITION AND ENSURING NO PART SHALL BE OVERSTRESSED UNDER CONSTRUCTION ACTIVITIES.\u003Cbr>4. WORKMANSHIP AND MATERIALS ARE TO BE IN\u003Cbr>ACCORDANCE WITH THE RELEVANT AND CURRENT AUSTRALIAN STANDARDS INCLUDING ALL AMENDMENTSAND STATUTORY REQUIREMENTS, EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS.\u003Cbr>5. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.\u003Cbr>6. DESIGN WIND LOADS ARE IN ACCORDANCE WITH AS1170 .2-2001 AS FOLLOWS:\u003Cbr>RETURN PERIOD 500 YEARS\u003Cbr>REGION: A\u003Cbr>TERRAIN CATEGORY 2\u003Cbr>WIND SPEED SHIELDING 1.0\u003Cbr>TOPOGRAPHIC FACTOR 1.0\u003Cbr>LIMIT STATE WIND VELOCITY (Vu) 41.8m/s AS4055 WIND CATEGORY N3\u003Cbr>INT'L PRESSURE COEFFICIENT +0 .7/-0 .5\u003Cbr>7. DESIGN LIVE LOADINGS ARE IN ACCORDANCE WITH AS/NZS1170 . 1:2002 AS FOLLOWS:\u003Cbr>DECK 3.0 kPa\u003Cbr>8. ALL ITEMS CALLED UP BY A TRADE NAME MAY BE SUBSTITUTED BY AN EQUIVALENT ITEM WITH SIMILAR PROPERTIES, SUBJECT TO THE ENGINEER'S WRITTEN APPROVAL. |  |  |  |  | SITE PREPARATION AND FOUNDATIONS\u003Cbr>1. THE CONTRACTOR SHALL CHECK ALL FOOTING EXCAVATIONS FOR ORGANIC MATERIAL AND RUBBISH. IF ANY OF THIS MATERIAL IS FOUND, IT SHALL BE REMOVED AND THE EXCAVATION BACKFILLED WITH CLEAN GRANULAR FILL.\u003Cbr>2. IF DISTURBED, THE BOTTOM OF THE EXCAVATIONS SHALL BE COMPACTED TO A RELATIVE DRY DENSITY OF 100% AS DETERMINED IN ACCORDANCE WITH AS1289-E4 .1 AND E1 .1.\u003Cbr>3. THE FOOTINGS HAVE BEEN DESIGNED TO BE FOUNDED INA STABLE MATERIAL WITH A SAFE ALLOWABLE BEARING CAPACITY OF 100kPa. SHOULD CONDITIONS OTHER THAN THOSE DESCRIBED ABOVE BE ENCOUNTERED, THEN THE MATTER IS TO BE REFERRED TO THE ENGINEER FOR POSSIBLE RE-DESIGN.\u003Cbr>STRUCTURAL TIMBER\u003Cbr>1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS1720 AND ALL OTHER RELEVANT CODES OF PRACTICE.\u003Cbr>2. ABNORMALLY GREEN OR SPLIT TIMBER SHALL BE REJECTED.\u003Cbr>3. TIMBER AT JOINTS SHALL BE FREE OF DEFECTS.\u003Cbr>4. UNLESS NOTED OTHERWISE, STRUCTURAL TIMBER SHALL BE MGP12 OF JOINT GROUP JD4 TIMBER OR BETTER.\u003Cbr>5. IT SHALL BE THE RESPONSIBILITY OF THE BUILDER TO ENSURE THAT TIMBER IS PROTECTED FROM THE WEATHER AND STRENGTH IS NOT IMPAIRED IN ANY WAY.\u003Cbr>6. THE TOLERANCE ON TIMBER ELEMENT DIMENSIONS SHALL BE-0;+3mm.\u003Cbr>7. ALL EXPOSED TIMBER SHALL BE OF DURABILITY CLASS 2 OR BETTER.\u003Cbr>8. ALL BOLTS, SCREWS AND NAILS TO BE GALVANISEDAND INSTALLED IN ACCORDANCE WITH AS1720 .\u003Cbr>9. ALL NAIL AND SCREW PENETRATIONS NOMINATED ARE TO BE INTO RECEIVING MEMBER.\u003Cbr>10. AL PLYWOOD IS TO BE STAMPED “PAA TESTED STRUCTURAL”.\u003Cbr>11. ALL BOLTS IN TIMBER TO TIMBER BOLTED STRUCTURAL JOINTS SHALL BE PROVIDED WITH A WASHERAT EACH END IN ACCORDANCE WITH AS1720 .\u003Cbr>12. ALL BOLTS IN CONTACT WITH CCA PRESERVATIVE TREATED TIMBER SHALL BE COATED IN GREASE OR OTHERWISE INSULATED FROM THE PRESERVATIVE TREATED TIMBER PRIOR TO ERECTION.\u003Cbr>13. WHERE NO OTHER DETAILS ARE GIVEN, WORK SHALL CONFORM TO AS1684 .3 FOR THE SPECIFIED WIND SPEED. |  |  | CONCRETE\u003Cbr>1. ALL WORKMANSHIP AND MATERIAL SHALL BE IN ACCORDANCE WITH AS 3600-2001.\u003Cbr>2. MINIMUM COVER TO REINFORCEMENT TO BEAS FOLLOWS\u003Cbr>U. N. O ON THE DRAWINGS.\u003Cbr>BORED PIER FOOTINGS 50mm\u003Cbr>3. CONCRETE GRADE SHALL BEAS FOLLOWS:\u003Cbr>BORED PIER FOOTINGS N20\u003Cbr>4. REINFORCEMENT SYMBOLS:-\u003Cbr>SL HARD DRAWN STEEL WIRE REINFORCING FABRIC TO AS1304 .\u003Cbr>N HOT ROLLED DEFORMED BARS TO AS1302 .\u003Cbr>R STRUCTURAL GRADE PLAIN ROUND BAR TOAS 1302. W REINFORCED WIRE TO AS 1303.\u003Cbr>5. IF CONCRETE IS PLACED IN HOT AND/OR WINDY WEATHER (>28°C), AN ALIPHATIC FOG SPRAY IS RECOMMENDED TO REDUCE EVAPORATION.\u003Cbr>6. WELDING OR SITE BENDING OF REINFORCEMENT IS NOT PERMITTED WITHOUT ","cbCaic5k3YYNEP6y","https://ap.wps.com/l/cbCaic5k3YYNEP6y","pdf",165274,"English","# General\n## Site Preparation and Foundations\n## Structural Timber\n## Concrete\n## Structural Steel","[{\"question\":\"What general instructions apply to these drawings before construction starts?\",\"answer\":\"The drawings must be read with all other consultant drawings and specifications, discrepancies must be referred to the engineer, and the engineer’s drawings must not be scaled. Relevant setting-out and off-site dimensions must be verified by the contractor before construction begins.\"},{\"question\":\"How are wind loads and design live loads defined?\",\"answer\":\"Design wind loads follow AS1170.2-2001 with the listed return period, region, terrain category, shielding, topographic factor, wind velocity, and pressure coefficients. Design live loadings follow AS/NZS1170.1:2002, including the deck loading of 3.0 kPa.\"},{\"question\":\"What key requirements govern foundations and structural timber?\",\"answer\":\"For foundations, check footing excavations for organic material and rubbish, remove any found material, and compact disturbed bottoms to the specified relative dry density. For timber, follow AS1720 and related codes, reject abnormally green or split timber, ensure timber at joints has no defects, and protect timber from weather while meeting durability and fastening requirements.\"}]","Sample-deck-Drawing | PDF"]