[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-646607-105":59,"doc-detail-646607-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","roytronic-series-p-instructions-manual","Roytronic Série P - Instructions Manual","","Instructions manual for Roytronic Série P electronic metering pumps, covering precautions, installation, operation, maintenance, and troubleshooting. It includes specifications, an unpacking check list, pump location and mounting guidance (including flooded suction and various suction lift mountings), tubing and Four-Function Valve (4-FV) installation steps, Fast Prime priming procedures, control panel operation, start-up and adjustment, output calibration (internal and external modes), externally triggering/pacing methods, and procedures for replacing spare parts such as Liquifram, valves, O-rings, and wiring diagrams.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/roytronic-series-p-instructions-manual/646607/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/roytronic-series-p-instructions-manual/646607.png","ImageObject",300,407,{"name":92,"@type":93},"Olivia Brown","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What information should be recorded for the pump file reference?","Question",{"text":112,"@type":113},"The manual asks to record the Model Number, Serial Number, installation date, and installation location. It also notes that replacement orders should include the complete Model and Serial numbers.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What installation steps are covered for Roytronic Série P pumps?",{"text":117,"@type":113},"Installation guidance covers pump location and mounting, tubing connections, Four-Function Valve (4-FV) installation, Fast Prime procedures, and installation of the foot valve/suction tubing as well as injection check valve and discharge tubing.",{"name":119,"@type":110,"acceptedAnswer":120},"How are start-up and output adjustments handled during operation?",{"text":121,"@type":113},"Operation includes using the control panel, performing start-up/priming for Fast Prime heads and for pumps with 4-FV (or without 4-FV), and then adjusting output through total output and calibration in internal or external modes.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},646607,1793029750,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},16904993612988,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","Instructions Manual Roytronic Série P + Electronic Metering pumps  \n| | 10. Grande Rue\u003Cbr>27360 Pont Saint Pierre (FRANCE) TEL: +(33) 232-683-000\u003Cbr>FAX: +(33) 232-683-093\u003Cbr>[www.miltonroy-europe.com](www.miltonroy-europe.com) |\n| --- | --- |\n\nLit\\# 1990.7 8/2007  \nFor file reference, please record the following data: Model No. :   \nSerial Nr:    \nInstallation Date::    \nInstallation Location:   When ordering replacement parts for your LMI Metering Pump or Accessory, please include complete Model Number and Serial Number of your unit.  \nCarefully read and understand all precautions before installing or servicing any metering pump  \nContents  \n1.0 Precautions .................................................................................................................................................. 4  \n2.0 Introduction ................................................................................................................................................... 5  \n2.1 Specifications .......................................................................................................................... 5  \n2.2 Unpacking check list ................................................................................................................ 5  \n3.0 Installation .................................................................................................................................................... 6  \n3.1 Pump location and installation ................................................................................................. 6  \n3.2 Pump mounting ........................................................................................................................ 6  \n3.2.1 Flooded suction ........................................................................................................................ 6  \n3.2.2 Suction lift -Wall bracket mount ................................................................................................ 6  \n3.2.3 Suction lift -Tank mount............................................................................................................ 6  \n3.2.4 Suction lift -Shelf mount ............................................................................................................ 7  \n3.3 Tubing connections ................................................................................................................... 7  \n3.4 Four-Function Valves (4-FV)..................................................................................................... 7  \n3.5 Four-Function Valve Installation ............................................................................................... 8  \n3.6 Fast Prime ™ ................................................................................................................................ 8  \n3.7 Foot valve/Suction tubing installation .......................................................................................8  \n3.8 Injection check valve and discharge tubing installation ............................................................9  \n4.0 Operation ................................................................................................................................................... 10  \n4.1 Control panel ........................................................................................................................... 10  \n4.2 Start-up and adjustment .......................................................................................................... 11  \n4.2.1 Start-up/Priming for Fast Prime ™ heads .................................................................................. 11  \n4.2.2 Start-up/Priming for pump supplied with 4-FV ........................................................................ 11  \n4.2.3 Start-up/Priming without 4-FV ................................................................................................. 12  \n4.3 Output adjustm","cbCaikmo4Ck0R1XL","https://ap.wps.com/l/cbCaikmo4Ck0R1XL","pdf",3227559,34,"English","# 1.0 Precautions\n# 2.0 Introduction\n## 2.1 Specifications\n## 2.2 Unpacking check list\n# 3.0 Installation\n## 3.1 Pump location and installation\n## 3.2 Pump mounting\n## 3.3 Tubing connections\n## 3.4 Four-Function Valves (4-FV)\n## 3.5 Four-Function Valve Installation\n## 3.6 Fast Prime ™\n## 3.7 Foot valve/Suction tubing installation\n## 3.8 Injection check valve and discharge tubing installation\n# 4.0 Operation\n## 4.1 Control panel\n## 4.2 Start-up and adjustment\n## 4.3 Output adjustment\n## 4.4 Methods of externally triggering or pacing P+3, P+7, and P+8\n# 5.0 Spare Parts Replacement and routine maintenance\n## 5.1 Depressurizing the discharge line (4-FV only)\n## 5.2 Depressurizing the discharge line (single ball FastPrime ™ heads only)\n## 5.3 Liquifram (Diaphragm) replacement\n## 5.4 Cartridge valve and O-Ring replacement\n## 5.5 Injection check valve parts replacement\n## 5.6 Fast Prime ™ valve O-Ring replacement\n## 5.7 Stroke length setting replacement\n## 5.8 EPU wiring diagram\n## 5.9 Liquid end parts list\n# 6.0 Troubleshooting","[{\"question\":\"What information should be recorded for the pump file reference?\",\"answer\":\"The manual asks to record the Model Number, Serial Number, installation date, and installation location. It also notes that replacement orders should include the complete Model and Serial numbers.\"},{\"question\":\"What installation steps are covered for Roytronic Série P pumps?\",\"answer\":\"Installation guidance covers pump location and mounting, tubing connections, Four-Function Valve (4-FV) installation, Fast Prime procedures, and installation of the foot valve/suction tubing as well as injection check valve and discharge tubing.\"},{\"question\":\"How are start-up and output adjustments handled during operation?\",\"answer\":\"Operation includes using the control panel, performing start-up/priming for Fast Prime heads and for pumps with 4-FV (or without 4-FV), and then adjusting output through total output and calibration in internal or external modes.\"}]","Roytronic Série P - Instructions Manual | PDF",1792764643,86]