[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663316-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663316-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","room-addition-permit-success-checklist-residential-drawing-standards","Room Addition - Permit Success Checklist - Residential Drawing Standards","","Room Addition permit document provides a success checklist and residential drawing standards for Montgomery County Building Regulations. It covers submission requirements for zoning permit and construction documents, drawing scale and sheet metadata, revision marking procedures, and defines a Room Addition drawing checklist. The checklist details site plan, foundation plan, level floor plans with egress and safety elements, framing plans, exterior elevations, wall sections, and energy conservation compliance calculations using REScheck or an approved alternate method.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/room-addition-permit-success-checklist-residential-drawing-standards/663316/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/room-addition-permit-success-checklist-residential-drawing-standards/663316.png","ImageObject",300,407,{"name":42,"@type":43},"Logic","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What are the required submissions for a Room Addition permit?","Question",{"text":62,"@type":63},"Submit a zoning permit copy and two sets of construction documents. All drawings must follow an identifiable scale and include required sheet information.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What information must each drawing sheet contain?",{"text":67,"@type":63},"Each sheet must include the owner’s name and project address, must be dated, and must include the drafter’s name and contact information.",{"name":69,"@type":60,"acceptedAnswer":70},"How should drawing revisions be documented?",{"text":71,"@type":63},"All revisions must be circled or clouded so changes are clearly visible, and each revision must be dated. Unchanged information due to revision need not be resubmitted.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663316,1793226461,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","Room Addition  \nPermit Success Checklist  \nMontgomery County Building Regulations  \n451 West Third St, 10th Floor  \nDayton, OH 45422 937-225-4622-Phone; 937-225-6327-Fax  \n[www.mcohio.org/build](www.mcohio.org/build)  \nMontgomery County Building Regulations Residential Drawing Standards:  \nSubmit copy of zoning permit  \nSubmit two sets of construction documents  \nAll drawings must be drawn to a recognizable scale, such as 1/4”= 1’-0” for the floor plans  \nAll sheets must include the owner’s name and project address, all sheets must be dated  \nAll sheets must include the name and contact information of the person who prepared the drawings  \nDrawing Revisions:  \nAll revisions must be circled or clouded, in order to see the changes clearly  \nAll revisions must be dated  \nInformation which did not change as a result of the revision need not be resubmitted  \nRoom Addition Drawing Checklist: These lists indicate common elements that must be submitted for this project type. Individual projects vary & may require additional information. If unsure of the project requirements, contact Building Regulations.  \n1.Site Plan:  \n􀂅 All site features (drive, well, septic field, etc. )  \n􀂅 All structures (existing and proposed addition)  \n􀂅 Dimensions between structures & property lines  \n􀂅 All easements and setbacks  \n􀂅 Flood area per FEMA FIRM, if applicable  \n􀂅 Topographic information if slope exceeds 1:3 within 40’ of house footprint  \n2. Foundation Plan:  \n􀂅 Footing materials  \n􀂅 Continuous footing under garage overhead doors  \n􀂅 Piers and pier pads (location & dimensions)  \n􀂅 Deck and porch piers (location & dimensions)  \n􀂅 Patio & other concrete slabs on grade  \n􀂅 Thickened slab areas (location & dimensions)  \n􀂅 Foundation materials  \n􀂅 Footing & foundation reinforcing  \n􀂅 Floor slab materials, reinforcing and vapor barrier  \n􀂅 Garage slab slope  \n􀂅 Crawlspace vents & access  \n􀂅 Portion of existing foundation to clarify connection details and existing conditions  \n3. Floor Plan of each level:  \n􀂅 All room uses (Bedroom, Kitchen, Closet, Unfinished Basement, etc. )  \nNote: Room uses in existing residence must be shown.“Bonus Room” & “Loft” are not an acceptable designations.  \n􀂅 All door sizes & landing dimensions, where required  \n􀂅 Bedroom egress window locations, clear opening sizes & sill height above floor  \n􀂅 Complete dimensions, including porches, decks, etc.  \n􀂅 Furnace location & elevation, if required  \n􀂅 Laundry equipment location  \n􀂅 Clothes dryer exhaust vent material & termination detail  \n􀂅 Bathroom fixture location, ventilation & termination of duct  \n􀂅 Safety glazing locations  \n􀂅 Smoke detector locations, power source &  \ninterconnectivity  \n􀂅 Attic access size & location  \n􀂅 Garage/House separation with ½” or 5/8” gypsum board  \n􀂅 Protection of 2nd floor structural elements in garage  \n􀂅 Identify interior load bearing walls  \n4. Framing Plans, depending on complexity:  \n􀂅 Floor framing at each level with joist size & spacing  \n􀂅 If using “I” joists, provide a layout from system manufacturer will applicable details  \n􀂅 Header & beam sizes & bearing requirements  \n􀂅 Deck & porch framing plans (floor & roof)  \n􀂅 Stair details (riser & tread dimensions, balusters, clearances, handrails, etc. )  \n􀂅 Roof framing or certified truss engineering submitted for approval prior to framing inspection  \nNote: See Code Enforcement Policy for details regarding residential roof truss submittals  \n5. Exterior Elevations:  \n􀂅 All exterior views, including some of existing home  \n􀂅 All finish materials  \n􀂅 All doors & windows  \n􀂅 Include decks, porches, steps, railings, etc.  \n􀂅 Proposed finished grade elevations  \n􀂅 Portion of existing residence to clarify connection details and existing conditions  \n6. Wall Sections for all wall types in project (basement, crawlspace, 2 story high rooms, garage, porch, etc.):  \n􀂅 All foundation materials, sizes & dimensions  \n􀂅 Reinforcing steel size & placement dimensions, if required  \n􀂅 Foundation water","cbCairvCueMn1Y7E","https://ap.wps.com/l/cbCairvCueMn1Y7E","pdf",162743,"English","# Permit Success Checklist\n## Montgomery County Building Regulations\n## Drawing Submission Standards\n## Drawing Revisions\n## Room Addition Drawing Checklist\n## Energy Conservation Compliance","[{\"question\":\"What are the required submissions for a Room Addition permit?\",\"answer\":\"Submit a zoning permit copy and two sets of construction documents. All drawings must follow an identifiable scale and include required sheet information.\"},{\"question\":\"What information must each drawing sheet contain?\",\"answer\":\"Each sheet must include the owner’s name and project address, must be dated, and must include the drafter’s name and contact information.\"},{\"question\":\"How should drawing revisions be documented?\",\"answer\":\"All revisions must be circled or clouded so changes are clearly visible, and each revision must be dated. Unchanged information due to revision need not be resubmitted.\"}]","Room Addition - Permit Success Checklist - Residential Drawing Standards | PDF"]