[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-160203-en":3,"doc-seo-160203-105":30,"detail-sidebar-cat-0-en-105":94},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":14,"update_tm":28,"read_time":29},160203,4398048950312,"Violet","https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908",4,"Exam","REQUIREMENTS FOR THE PROCESS CAPABILITY APPROVAL - FOR MANUFACTURING LINES OF HERMETIC HYBRID MICROCIRCUITS - ESCC Basic Specification 2566000 - Issue 3","Defines the requirements for Process Capability Approval (PCA) of manufacturing lines producing hermetic hybrid microcircuits intended for space application. Specifies how a manufacturer must be evaluated and capability approved for a defined set of materials and processes, including description and publication in REP007 (ESCC List of PCA certificates). Applies to substrate and interconnect technologies and must be read with ESCC Basic Specification 25600. Excludes non-hermetic device manufacturing line PCA needs.","REQUIREMENTS FOR THE  \nPROCESS CAPABILITY APPROVAL  \nFOR  \nMANUFACTURING LINES  \nOF  \nHERMETIC HYBRID MICROCIRCUITS  \nESCC Basic Specification No. 2566000  \nPage 1  \nof 46  \n\n| Issue 3 | February 2018 |\n| --- | --- |\n\nDocument Custodian: European Space Agency – see [https://escies.org](https://escies.org)  \nLEGAL DISCLAIMER AND COPYRIGHT  \nEuropean Space Agency, Copyright © 2018. All rights reserved.  \nThe European Space Agency disclaims any liability or responsibility, to any person or entity, with respect to any loss or damage caused, or alleged to be caused, directly or indirectly by the use and application of this ESCC publication.  \nThis publication, without the prior permission of the European Space Agency and provided that it isnot used for a commercial purpose, may be:  \n− copied in whole, in any medium, without alteration or modification.  \n− copied in part, in any medium, provided that the ESCC document identification, comprising the ESCC symbol, document number and document issue, is removed.  \nDOCUMENTATION CHANGE NOTICE  \n(Refer to [https://escies.org](https://escies.org) for ESCC DCR content)  \n\n| DCR No. | CHANGE DESCRIPTION |\n| --- | --- |\n| 1119 | Specification upissued to incorporate changes per DCR. |\n\nTABLE OF CONTENTS  \n1 PURPOSE AND SCOPE 6  \n2 APPLICABLE DOCUMENTS 6  \n2.1 ESCC SPECIFICATIONS 6  \n2.2 OTHER APPLICABLE DOCUMENTS 7  \n3 TERMS, DEFINITIONS, ABBREVIATIONS, SYMBOLS AND UNITS 7  \n3.1 TERMS FROM OTHER STANDARDS 7  \n3.2 TERMS SPECIFIC TO THE PRESENT STANDARD 7  \n3.3 ABBREVIATED TERMS 9  \n4 DEFINITION OF PROCESS CAPABILITY APPROVAL FOR HYBRID LINES 10  \n5 DEFINITION OF THE PROCESS CAPABILITY DOMAIN AND ITS BOUNDARIES 12  \n5.1 GENERAL 12  \n5.1.1 Materials and processes 12  \n5.1.2 Physical Design 12  \n5.1.3 Inspection and test 13  \n5.1.4 Traceability 13  \n5.2 THE PID OF A HYBRID MANUFACTURER 13  \n5.2.1 General 13  \n5.2.2 Review and approval of the PID 13  \n6 MANUFACTURER EVALUATION 13  \n7 EVALUATION OF THE PROCESS CAPABILITY DOMAIN 14  \n7.1 GENERAL 14  \n7.2 EVALUATION TEST PROGRAMME 14  \n7.2.1 General 14  \n7.2.2 Description of Test Vehicles (TVE) 14  \n7.2.2.1 General 14  \n7.2.2.2 Definition of TVE1 test vehicle 15  \n7.2.2.3 Definition of TVE2 test vehicle 16  \n7.2.3 Examples of the two Evaluation Test Vehicles 17  \n7.3 MANUFACTURER’S AUDIT 21  \n7.4 EVALUATION TESTING 21  \n7.4.1 General 21  \n7.4.2 Initial DPA and Reference devices 22  \n7.4.3 Test plans 22  \n7.4.4 Test methods and conditions 25  \n7.4.5 Evaluation Test Report 27  \n8 PROCESS CAPABILITY APPROVAL (PCA) PHASE 28  \n8.1 GENERAL 28  \n8.2 PROCESS CAPABILITY APPROVAL TESTING 28  \n8.2.1 Definition and requirements for test vehicles for PCA testing 28  \n8.2.2 Hermetic Hybrids PCA test plans 29  \n8.2.2.1 General 29  \n8.2.2.2 Sample size 30  \n8.2.2.3 PCA test plan 31  \n8.2.3 Hermetic Hybrids PCA test methods and conditions 31  \n8.2.4 PCA test report 34  \n8.3 PROCEDURES SPECIFIC TO THE PCA OF HYBRID MANUFACTURING LINES 34  \n8.3.1 Manufacturing Line under TRB management 34  \n8.3.2 Extension or change of the Process Capability Approval Domain 35  \n8.3.3 Maintenance, suspension and withdrawal of the Process Capability Approval 37  \n8.3.3.1 Maintenance of process capability approval. 37  \n8.3.3.2 Suspension of process capability approval. 37  \n8.3.3.3 Withdrawal of process capability approval 38  \n8.3.3.4 Renewal after lapse of process capability approval 38  \n9 ANNEX 1 REQUIREMENTS GUIDELINES FOR THE MATERIALS AND PROCESSES DESCRIPTION  \n39  \n9.1 DEFINITION OF PROPOSED SUB-TECHNIQUES IN THE PCA DOMAIN 39  \n9.1.1 Definition of sub-techniques depending on the substrate technology 39  \n9.1.1.1 Screen Printed Thick film 39  \n9.1.1.2 Thin film deposition 40  \n9.1.1.3 HTCC (High Temperature Cofired Ceramic) 41  \n9.1.1.4 LTCC (Low Temperature Co-fired Ceramic) 41  \n9.1.1.5 Organic substrate(s) 42  \n9.1.1.6 DBC (Direct Bonded Copper) 42  \n9.1.2 Assembly of added-on components, substrates and carriers 43  \n9.1.2.1 Passive components assembly 43  \n9.1.2.2 Active c","cbCaioB44SuFPBid","https://ap.wps.com/l/cbCaioB44SuFPBid","pdf",997187,1,46,"English","en",105,"# 1 PURPOSE AND SCOPE\n# 2 APPLICABLE DOCUMENTS\n## 2.1 ESCC SPECIFICATIONS\n## 2.2 OTHER APPLICABLE DOCUMENTS\n# 3 TERMS, DEFINITIONS, ABBREVIATIONS, SYMBOLS AND UNITS\n## 3.1 TERMS FROM OTHER STANDARDS\n## 3.2 TERMS SPECIFIC TO THE PRESENT STANDARD\n## 3.3 ABBREVIATED TERMS\n# 4 DEFINITION OF PROCESS CAPABILITY APPROVAL FOR HYBRID LINES\n# 5 DEFINITION OF THE PROCESS CAPABILITY DOMAIN AND ITS BOUNDARIES\n## 5.1 GENERAL\n## 5.2 THE PID OF A HYBRID MANUFACTURER\n# 6 MANUFACTURER EVALUATION\n# 7 EVALUATION OF THE PROCESS CAPABILITY DOMAIN\n## 7.1 GENERAL\n## 7.2 EVALUATION TEST PROGRAMME\n## 7.3 MANUFACTURER’S AUDIT\n## 7.4 EVALUATION TESTING\n# 8 PROCESS CAPABILITY APPROVAL (PCA) PHASE\n## 8.1 GENERAL\n## 8.2 PROCESS CAPABILITY APPROVAL TESTING\n## 8.3 PROCEDURES SPECIFIC TO THE PCA OF HYBRID MANUFACTURING LINES\n# 9 ANNEX 1 REQUIREMENTS GUIDELINES FOR THE MATERIALS AND PROCESSES DESCRIPTION\n## 9.1 DEFINITION OF PROPOSED SUB-TECHNIQUES IN THE PCA DOMAIN\n# 10 ANNEX 2-OVERVIEW OF THE PCA EXTENSION APPLICATION","[{\"question\":\"What is the purpose of this specification for PCA?\",\"answer\":\"It defines the requirements for Process Capability Approval of a manufacturing line of hermetic hybrid microcircuits intended for space application.\"},{\"question\":\"Which topics does the evaluation cover before PCA is approved?\",\"answer\":\"It covers manufacturer evaluation, evaluation of the process capability domain, evaluation test programme and testing, and the manufacturer’s audit.\"},{\"question\":\"What is the PCA phase and how are processes approved?\",\"answer\":\"The PCA phase specifies PCA testing requirements, including test vehicles, PCA test plans, methods and conditions, and the PCA test report, plus specific procedures for hybrid manufacturing lines.\"},{\"question\":\"Does this specification apply to non-hermetic devices?\",\"answer\":\"No. It does not provide requirements for PCA of a manufacturing line of devices not designed to be hermetic.\"}]","REQUIREMENTS FOR THE PROCESS CAPABILITY APPROVAL - FOR MANUFACTURING LINES OF HERMETIC HYBRID MICROCIRCUITS - ESCC Basic Specification 2566000 - Issue 3 | PDF",1788051805,116,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":89,"head_meta":91,"extra_data":93,"updated_unix":28},"requirements-for-the-process-capability-approval-for-manufacturing-lines-of-hermetic-hybrid-microcircuits-escc-basic-specification-2566000-issue-3","",{"@graph":36,"@context":88},[37,53,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":50},"https://docshare.wps.com/document/exam/",3,{"item":52,"name":13,"@type":43,"position":11},"https://docshare.wps.com/document/requirements-for-the-process-capability-approval-for-manufacturing-lines-of-hermetic-hybrid-microcircuits-escc-basic-specification-2566000-issue-3/160203/",{"url":52,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-08-30",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80,84],{"name":71,"@type":72,"acceptedAnswer":73},"What is the purpose of this specification for PCA?","Question",{"text":74,"@type":75},"It defines the requirements for Process Capability Approval of a manufacturing line of hermetic hybrid microcircuits intended for space application.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"Which topics does the evaluation cover before PCA is approved?",{"text":79,"@type":75},"It covers manufacturer evaluation, evaluation of the process capability domain, evaluation test programme and testing, and the manufacturer’s audit.",{"name":81,"@type":72,"acceptedAnswer":82},"What is the PCA phase and how are processes approved?",{"text":83,"@type":75},"The PCA phase specifies PCA testing requirements, including test vehicles, PCA test plans, methods and conditions, and the PCA test report, plus specific procedures for hybrid manufacturing lines.",{"name":85,"@type":72,"acceptedAnswer":86},"Does this specification apply to non-hermetic devices?",{"text":87,"@type":75},"No. It does not provide requirements for PCA of a manufacturing line of devices not designed to be hermetic.","https://schema.org",{"og:url":52,"og:type":90,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":92,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":95},[96,100,104,107,112,117,122,127,132,135,139],{"id":20,"doc_module":4,"doc_module_name":46,"category_name":97,"show_sort_weight":98,"slug":99},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":101,"show_sort_weight":102,"slug":103},"Literature",80,"literature",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":105,"slug":106},70,"exam",{"id":108,"doc_module":4,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},5,"Comic",60,"comic",{"id":113,"doc_module":4,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},6,"Technology",50,"technology",{"id":118,"doc_module":4,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},7,"Healthcare",40,"healthcare",{"id":123,"doc_module":4,"doc_module_name":46,"category_name":124,"show_sort_weight":125,"slug":126},8,"Research & Report",30,"research-report",{"id":128,"doc_module":4,"doc_module_name":46,"category_name":129,"show_sort_weight":130,"slug":131},9,"Religion & Spirituality",20,"religion-spirituality",{"id":130,"doc_module":4,"doc_module_name":46,"category_name":133,"show_sort_weight":130,"slug":134},"World Cup","world-cup",{"id":136,"doc_module":4,"doc_module_name":46,"category_name":137,"show_sort_weight":136,"slug":138},10,"Lifestyle","lifestyle",{"id":140,"doc_module":4,"doc_module_name":46,"category_name":141,"show_sort_weight":108,"slug":142},19,"General","general"]