[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663305-105":59,"doc-detail-663305-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","required-rtd-lrt-construction-notes-mandatory-construction-coordination-and-utility-requirements","REQUIRED RTD (LRT) CONSTRUCTION NOTES - Mandatory construction coordination and utility requirements","","Required RTD (LRT) Construction Notes outline mandatory procedures for contractors working on or across RTD row/track areas. They specify advance notifications, utility pre-construction and weekly mandatory rail construction meetings, required training, and restrictions on beginning work without executed utility agreements, MOW access permits, and a completed PCRR. The notes also require traffic control plan submission when operations may be impacted, non-destructive utility locating, strict surveying and as-built documentation within defined time limits, utility marking and tracer wire, cathodic protection for new metallic piping, and carrying required documents on-site.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/required-rtd-lrt-construction-notes-mandatory-construction-coordination-and-utility-requirements/663305/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/required-rtd-lrt-construction-notes-mandatory-construction-coordination-and-utility-requirements/663305.png","ImageObject",300,407,{"name":92,"@type":93},"The UK Girl","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How far in advance must the contractor notify RTD’s utility engineering/construction team before work begins?","Question",{"text":112,"@type":113},"Notify RTD’s utility engineering/construction team two full weeks prior to construction and coordinate a utility pre-construction meeting with RTD.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What documents or approvals are required before any work on or across RTD row/tracks can start?",{"text":117,"@type":113},"Work cannot begin until RTD issues and executes the utility agreement, and until a pre-construction resolution record (PCRR) has been completed, signed, and issued during the utility pre-construction meeting.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the key requirements for locating and documenting new utilities near or under RTD track infrastructure?",{"text":121,"@type":113},"New utilities must be located using non-destructive exploratory means agreed with RTD and described in the PCRR, and contractors must submit completed horizontal plans and vertical profiles with before/after surveys and as-built survey details within specified timeframes.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663305,1793226379,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},2199028711991,"https://us-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","REQUIRED RTD (LRT) CONSTRUCTION NOTES  \nAdd these to your ‘for construction’drawing  \n1. CONTRACTOR SHALL NOTIFY RTD’S UTILITY ENGINEERING/CONSTRUCTION TEAM (303‐299‐2811) A FULL TWO (2) WEEKS PRIOR TO CONSTRUCTION AND SHALL COORDINATE A UTILITY PRE‐CONSTRUCTION MEETING WITH RTD. CONTRACTOR AND SUB‐CONTRACTORS WORKING ON OR ACROSS RTD  \nROW/TRACKS MUST ATTEND THE UTILITY PRE‐CONSTRUCTION MEETING. AN RTD REPRESENTATIVE MUST BE ON‐SITE DURING CONSTRUCTION. THE UTILITY PRE‐CONSTRUCTION MEETING SHALL OCCUR WITHIN A WEEK OF THE START OF CONSTRUCTION.  \n2. CONTRACTORS AND SUB‐CONTRACTORS MUST ATTEND ALL NECESSARY LIGHT RAIL ON TRACK SAFETY TRAINING PRIOR TO THE START OF ANY WORK ON, ADJACENT TO, OR ACROSS RTD ROW WITH LIGHT RAIL TRACKS.  \n3. CONTRACTOR SHALL CONTACT RTD’S MAINTENANCE OF WAY (MOW) AND RTD RAIL OPERATIONS (303‐ 299‐3415) A FULL WEEK PRIOR TO CONSTRUCTION AND ATTEND THE WEEKLY RTD MANDATORY RAIL CONSTRUCTION MEETING (IN ADDITION TO THE UTILITY PRE‐CONSTRUCTION MEETING) PRIOR TO THE START OF ANY PROJECT CONSTRUCTION. CONTRACTOR MAY NOT BEGIN ANY WORK WITHOUT AN RTD MOW ACCESS PERMIT. RTD’S MOW WILL NOT ISSUE A PERMIT WITHOUT AN EXECUTED UTILITY AGREEMENT IN PLACE FOR YOUR WORK.  \n4. CONTRACTOR SHALL NOT BEGIN ANY WORK ON OR ACROSS RTD ROW/TRACKS UNTIL RTD HAS ISSUED AND EXECUTED UTILITY AGREEMENT.  \n5. CONTRACTOR MAY NOT BEGIN WORK UNTIL RTD HAS ISSUED A PRE‐CONSTRUCTION RESOLUTION RECORD (PCRR) . A PCRR WILL BE COMPLETED, SIGNED, AND ISSUED BY RTD’S UTILITY ENGINEERING/CONSTRUCTION TEAM DURING THE UTILITY PRE‐CONSTRUCTION MEETING AND MUST BE KEPT ON‐SITE AT ALL TIMES DURING CONSTRUCTION.  \n6. TRAFFIC CONTROL PLANS ARE REQUIRED IF WORK HAS THE POTENTIAL OF IMPACTING RTD RAIL AND/OR BUS OPERATIONS, OR AUTOMOBILE TRAFFIC NEAR TRAIN OR BUS FACILITIES AND/OR RAILROAD CROSSINGS. TRAFFIC CONTROL PLANS MUST BE SUBMITTED TO RTD FOR APPROVAL PRIOR TO CONSTRUCTION.  \n7. RTD ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS SHOWN ON THESE CONSTRUCTION  \nDRAWINGS. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.  \n8. CONTRACTOR SHALL IDENTIFY THE HORIZONTAL LOCATION AND VERTICAL DEPTH OF RTD UNDERGROUND ELECTRIC AND COMMUNICATION DUCTS AND INSTALL THE NEW UTILITY WITHOUT COMPROMISING THE INTEGRITY OF THE RTD TRACKS OR DYNAMIC ENVELOPE. THIS MUST BE ACCOMPLISHED BY NON‐DESTRUCTIVE EXPLORATORY MEANS AND METHODS OF LOCATING THE RTD DUCTS THAT DOES NOT INCLUDE POTHOLING OR DIGGING WITHIN THE RTD TRACK ENVELOPE. THE LOCATING METHOD MUST BE AGREED UPON BY BOTH CONTRACTOR AND RTD AND SHALL BE DESCRIBED AT PRE‐CONSTRUCTION MEETING AND SHALL BE PART OF THE PRE‐CONSTRUCTION RESOLUTION RECORD (PCRR) . THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE RTD WHOLE FROM ANY DAMAGE TO RTD FACILITIES, INCLUDING DAMAGE DONE AFTER ASSISTANCE BY RTD STAFF TO HELP LOCATE RTD DUCTS.  \n9. CONTRACTOR SHALL SURVEY AND SUBMIT THE COMPLETED HORIZONTAL PLAN AND VERTICAL PROFILE TO RTD WITHIN 30 CALENDAR DAYS OF THE COMPLETION OF CONSTRUCTION. THE PLAN AND PROFILE AS‐BUILTS MUST CONTAIN THE FOLLOWING INFORMATION:  \na)  BEFORE AND AFTER SURVEYS OF TOP OF RTD TRACKS – CONTRACTOR SHALL SURVEY TOP OF TRACKS TO SHOW NO MOVEMENT OF TRACKS DUE TO CONSTRUCTION: AT A MINIMUM, THE CONTRACTORSHALL SURVEY A TOTAL OF 5 SURVEY POINTS PER RAIL (WITH 10 FOOT SEPARATION BETWEEN POINTS), WITH THE CENTER POINT ON EACH RAIL LOCATED AS CLOSE AS POSSIBLE OVER THE  \nCENTERLINE OF THE NEW UTILITY SO THAT THE 5 SHOTS STRADDLE THE NEW CROSSING LOCATION. THE BEFORE (PRE‐CONSTRUCTION) SURVEY MUST BE DONE NO MORE THAN 30 DAYS PRIOR TO CONSTRUCTION AND THE AFTER (POST‐CONSTRUCTION) SURVEY MUST BE DONE NO MORE THAN 30 DAYS AFTER CONSTRUCTION IS COMPLETED. IF CONSTRUCTION DURATION EXTENDS BEYOND 2 MONTHS A TOP OF RAIL STATUS SURVEY MUST BE DONE AND SUBMITTED EVERY 30 DAYS DURING CONSTRUCTION ACROSS THE TRACKS. THE UTILITY AGREEMENT NUMBER AND SURVEY DATE MUST APPEAR ON ALL TOP OF RAIL SURVEY SUBMITTALS.  \nb) AS‐BUILT SUR","cbCaiijHePpAIRDE","https://ap.wps.com/l/cbCaiijHePpAIRDE","pdf",98145,"English","# Required RTD (LRT) Construction Notes\n## Advance coordination and meetings\n## Permits, utility agreements, and PCRR requirements\n## Training, safety, and site documentation\n## Traffic control and utility locating\n## Surveying, as-built deliverables, and marking\n## Cathodic protection and underground utilities","[{\"question\":\"How far in advance must the contractor notify RTD’s utility engineering/construction team before work begins?\",\"answer\":\"Notify RTD’s utility engineering/construction team two full weeks prior to construction and coordinate a utility pre-construction meeting with RTD.\"},{\"question\":\"What documents or approvals are required before any work on or across RTD row/tracks can start?\",\"answer\":\"Work cannot begin until RTD issues and executes the utility agreement, and until a pre-construction resolution record (PCRR) has been completed, signed, and issued during the utility pre-construction meeting.\"},{\"question\":\"What are the key requirements for locating and documenting new utilities near or under RTD track infrastructure?\",\"answer\":\"New utilities must be located using non-destructive exploratory means agreed with RTD and described in the PCRR, and contractors must submit completed horizontal plans and vertical profiles with before/after surveys and as-built survey details within specified timeframes.\"}]","REQUIRED RTD (LRT) CONSTRUCTION NOTES - Mandatory construction coordination and utility requirements | PDF"]