[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-390522-105":59,"doc-detail-390522-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","request-for-full-proposal-w9126g262rfp9554-conservation-and-forestry-program-support","REQUEST FOR FULL PROPOSAL - W9126G262RFP9554 - Conservation and Forestry Program Support","","Request for Full Proposal W9126G262RFP9554 for a cooperative agreement supporting the Conservation and Forestry Program Support (2026-2031) under the Environmental Natural Resources Management Division. Eligibility is limited to CESU program regions Great Plains, Gulf Coast, and Great Rivers. Proposals must meet 2 CFR 200 and CESU Master Agreement terms, include a detailed budget, and comply with NIST SP 800-171 requirements. Submissions are due 14 September 2026 by 12:00 P.M. Central Daylight Time via email to designated specialists.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/request-for-full-proposal-w9126g262rfp9554-conservation-and-forestry-program-support/390522/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/request-for-full-proposal-w9126g262rfp9554-conservation-and-forestry-program-support/390522.png","ImageObject",300,407,{"name":92,"@type":93},"McGucket","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-25",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who is eligible to submit a proposal under this RFP?","Question",{"text":112,"@type":113},"Only members of the Cooperative Ecosystem Studies Units (CESU) Program within the identified regions (Great Plains, Gulf Coast, and Great Rivers) are eligible.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What compliance requirements must recipients meet to be eligible for award?",{"text":117,"@type":113},"The recipient and any proposed subrecipients and contract vendors must have an active NIST SP 800-171 DoD Assessment performed within the last 3 years.",{"name":119,"@type":110,"acceptedAnswer":120},"When and how must full proposals be submitted?",{"text":121,"@type":113},"Full proposals are due by 12:00 P.M. Central Daylight Time on 14 September 2026 via email to the Agreement Specialist and Agreement Project Manager, with the RFP number referenced in the email subject line.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},390522,1791476234,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":146,"preview_urls":147},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","26 August 2026  \nREQUEST FOR FULL PROPOSAL  \nW9126G262RFP9554  \nApplicants must be a member in one of the following Cooperative Ecosystem Studies Units Regions:  \nGreat Plains, Gulf Coast, and Great Rivers Regions  \nProject Title: Conservation and Forestry Program Support (2026-2031) for Environmental Natural Resources Management Division, Directorate of Public Works, Joint Readiness Training Center and Fort Polk, Louisiana  \nA cooperative agreement is being offered ONLY to members of the Cooperative Ecosystem Studies Units (CESU) Program Region(s) identified above. Award will be made upon mutual agreement and acceptance of the terms and conditions contained in the request for proposal and the recipient’s CESU Joint and Cooperative Agreement (also known as the CESU Master Agreement) . Enclosed are the Proposal Instructions, Statement of Objectives, and General Terms and Conditions.  \nNOTE: For any Cooperative Agreement entered into in response to this Request for Full Proposal (RFP), a maximum 17.5% indirect cost rate will be paid on work covered by such agreement or any modifications thereto. Unless the agreement specifies otherwise, the basis of direct costs against which the agreement’s indirect cost rate is applied must be either the same base identified in the recipient's federally negotiated indirect cost rate agreement or, if the recipient does not have a federally negotiated indirect cost rate agreement, the Modified Total Direct Cost (MTDC) base.  \nNOTE: This project will be awarded under the authority of 16 USC 670c-1, Sikes Act. For projects for the implementation and enforcement of integrated natural resources management plans, priority shall be given to award to Federal and State agencies having responsibility for the conservation or management of fish or wildlife.  \nPeriod of Performance: The base period of the agreement will extend approximately 10  \nmonths from the date of award. Meaningful work must commence by September 30, 2026. Description of Anticipated Work: See attached Statement of Objectives.  \nSubmission of Your Full Proposal: The proposal must comply with 2 CFR 200, the terms and conditions of the most recent CESU Cooperative and Joint Venture Agreement, and this request for proposal. Your full proposal should address how you plan to meet the objectives listed; include a detailed budget taking into consideration the magnitude of available funding. The maximum funds available for this requirement’s period of performance is $1,250,000.00 .  \nProposals are due by 12:00 P.M. Central Daylight Time, 14 September 2026 via email to: Agreement Specialist, [Maria.E.Lopez@usace.army.mil](Maria.E.Lopez@usace.army.mil) and Agreement Project Manager, [Kathy.S.Mitchell@usace.army.mil](Kathy.S.Mitchell@usace.army.mil).  \nUSACE has determined that exigent circumstances justify this availability period.  \nReference the RFP number in the email Subject line.  \nOnly the Agreement Specialist or Grants Officer has the authority to extend the proposal due date by written notification to all potential respondents.  \nTechnical questions and/or clarifications shall be submitted in writing via email to the Agreement Specialist and Agreement Project Manager no later than 31 August 2026 prior to 12:00 P.M. Central Daylight Time.  \nTO BE ELIGIBLE FOR AWARD, THE RECIPIENT AND ANY PROPOSED SUBRECIPIENTSAND CONTRACT VENDORS MUST HAVE AN ACTIVE NIST SP 800-171 DOD ASSESSEMENT (PERFORMED WITHIN THE LAST 3 YEARS) . Additional details are provided as a separate attachment to this document.  \nALEXANDER G. RUST Grants Officer  \nEnclosures: As stated above  \nRUST.ALEXANDER.GREGORY.151736 9566  \nDigitally signed by  \nRUST.ALEXANDER.GREGORY. 1517369566  \nDate: 2026.08.26 15:38:10-05'00'  \nProposal Instructions  \n1. Format and Content of Full Proposals  \n1.1. Proposal submissions will be protected from unauthorized disclosure in accordance with applicable law, and DoD regulations. Respondents are expected to appropriately mark each page of the","cbCaikT6FJxiAL4T","https://ap.wps.com/l/cbCaikT6FJxiAL4T","pdf",1497361,172,"English","# Proposal Instructions\n## Format and Content of Full Proposals\n## Proposal Organization and Required Sections","[{\"question\":\"Who is eligible to submit a proposal under this RFP?\",\"answer\":\"Only members of the Cooperative Ecosystem Studies Units (CESU) Program within the identified regions (Great Plains, Gulf Coast, and Great Rivers) are eligible.\"},{\"question\":\"What compliance requirements must recipients meet to be eligible for award?\",\"answer\":\"The recipient and any proposed subrecipients and contract vendors must have an active NIST SP 800-171 DoD Assessment performed within the last 3 years.\"},{\"question\":\"When and how must full proposals be submitted?\",\"answer\":\"Full proposals are due by 12:00 P.M. Central Daylight Time on 14 September 2026 via email to the Agreement Specialist and Agreement Project Manager, with the RFP number referenced in the email subject line.\"}]","REQUEST FOR FULL PROPOSAL - W9126G262RFP9554 - Conservation and Forestry Program Support | PDF",1790335532,433,18,[148,152,156,160,164,168,172,176,180,184,188,193,198,203,208,213,218,223],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/2af21baf86b90772dce611c2867013c4.webp",983,1272,{"page_no":14,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/21c2068119cb2440e45c641ef9a21705.webp",982,1270,{"page_no":81,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/9ac21b1f1021327c919685dfaaae4f25.webp",981,1269,{"page_no":19,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/3cc4fba80eded3d52889157ba0259dba.webp",980,1268,{"page_no":24,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/bd031374b373ac7f09a383286a01f7ff.webp",979,1267,{"page_no":29,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/cab251d676ec0c6078b5bdb3e799161a.webp",978,1265,{"page_no":34,"url":173,"width":174,"height":175},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/4d0be651c023b74ba676bcb5d9376200.webp",977,1264,{"page_no":39,"url":177,"width":178,"height":179},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/edc378e312345d73980dcc18a13ec098.webp",976,1263,{"page_no":44,"url":181,"width":182,"height":183},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/c5230a8f0054d791025cfc0c7c65cfac.webp",975,1261,{"page_no":52,"url":185,"width":186,"height":187},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/4abdc96960a0791fdb21940192f6d556.webp",974,1260,{"page_no":189,"url":190,"width":191,"height":192},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/33c13cd5ff2b87766aaf262152cd693a.webp",973,1259,{"page_no":194,"url":195,"width":196,"height":197},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/fee5e5ed09e54763416cfaa3af964fc0.webp",972,1257,{"page_no":199,"url":200,"width":201,"height":202},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/b47e16a0af7b40e7583ddc00bca2da9a.webp",971,1256,{"page_no":204,"url":205,"width":206,"height":207},14,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/cbb6577f87d0cf615f570c43b6e5dba0.webp",970,1255,{"page_no":209,"url":210,"width":211,"height":212},15,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d4ed91e568940dc3460f7e7dcee35b90.webp",969,1254,{"page_no":214,"url":215,"width":216,"height":217},16,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f2a83c7cbea4ac7fed575ceed3ff0d42.webp",968,1252,{"page_no":219,"url":220,"width":221,"height":222},17,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/faf3388f089b4a79c2ac8f9de8fde403.webp",967,1251,{"page_no":146,"url":224,"width":225,"height":226},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/dab9fb24fdbaead4364520c1d8c88ceb.webp",966,1250]