[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-389157-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-389157-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","remsi-sketches-51-100-sketch-57-inverter-based-renewable-generation-for-dg-capacity-up-to-and-including-20-of-the-load-center-bus-bar-rating","REMSI Sketches 51-100 - Sketch #57 - Inverter-based renewable generation for DG capacity up to and including 20% of the load center bus bar rating","","Sketch #57 specifies requirements for inverter-based renewable distributed generation installations where the DG capacity is up to and including 20% of the load center bus bar rating. It defines applicable voltage and wiring configurations, service type, and self-contained outdoor metering constraints, including limits on maximum parallel generation for single-phase systems. It also lists customer and utility responsibilities for equipment supply, labeling, inspection verification of IEEE/UL inverter listings, NEC compliance for installation and metering, and DER management communications interface setup.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/remsi-sketches-51-100-sketch-57-inverter-based-renewable-generation-for-dg-capacity-up-to-and-including-20-of-the-load-center-bus-bar-rating/389157/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/remsi-sketches-51-100-sketch-57-inverter-based-renewable-generation-for-dg-capacity-up-to-and-including-20-of-the-load-center-bus-bar-rating/389157.png","ImageObject",300,407,{"name":42,"@type":43},"Theodore","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What DG capacity limit does Sketch #57 allow for inverter-based renewable generation?","Question",{"text":63,"@type":64},"Sketch #57 allows DG capacity up to and including 20% of the load center bus bar rating.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What inverter listing requirements are referenced for the installation?",{"text":68,"@type":64},"The inverter(s) must be labeled as IEEE 1547 / UL 1741 listed, and an independent electrical inspection is required to verify this listing.",{"name":70,"@type":61,"acceptedAnswer":71},"What communication interface and networking details are required for DER management?",{"text":72,"@type":64},"A local RS-485 or Ethernet communication interface must be open and accessible for the company-owned DER management device, with static IP details required for Modbus TCP or DHCP for IEEEE 2030.5, and networking between multiple inverters via RS-485 multidrop or per manufacturer guidelines.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},389157,1790835486,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":55,"slug":125},"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":30,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":112,"preview_page_count":30,"preview_urls":144},7971461740886,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| REMSI Sketches 51-100 Sketch \\#57 6-52\u003Cbr>| 0000-000-ST-6052 Custom ID: DCS 6-52\u003Cbr>Revision: 14\u003Cbr>Effective Date: 1/31/2025 Page 22 of 80 |\n| --- | --- |\n\nSketch \\#57 Inverter-based renewable generation for DG capacity up to and including 20% of the load center bus bar rating for 480V, self-contained metering installations  \n\n| Voltage/ Phase:\u003Cbr>1 Phase, 3 Wire Network 277/480V*\u003Cbr>1 Phase, 3 Wire 240/480V*\u003Cbr>3 Phase, 4 Wire WYE 277/480V | Amperage: N/A | Inverter Continuous Current N/A |\n| --- | --- | --- |\n| Service Type:\u003Cbr>Overhead/Underground | Meter Type/Location: Self-contained/Outdoor | Bus Bar Rating:\u003Cbr>≤20% |\n\n* The maximum parallel connection (generation) permitted on a single-phase installation is 158 kW.  \nNOT FOR NEW CONSTRUCTION  \n* Reference: SKETCH 55a REMSI_S057P1dwg  \n\n| RULES FOR ELECTRIC METER AND SERVICE INSTALLATIONS\u003Cbr>PPL ELECTRIC UTILITIES CORPORATION | Rules: 12, 28\u003Cbr>Date: 01/31/2025 Engr: JEU |\n| --- | --- |\n\n© 2022 PPL Electric Utilities Corporation. All rights ritrden: 02/05/2025  \nABpupsrionves: 0s4e495 Bash, Christopher R  \n\n| REMSI Sketches 51-100 Sketch \\#57 6-52\u003Cbr>| 0000-000-ST-6052 Custom ID: DCS 6-52\u003Cbr>Revision: 14\u003Cbr>Effective Date: 1/31/2025 Page 23 of 80 |\n| --- | --- |\n\nCUSTOMER FURNISHES, INSTALLS, MAINTAINS:  \n1. Load center  \n2. AC disconnect switch  \n3. Inverter(s) (includes metering and communication features) inverter shall be labeled as IEEE 1547/ UL 1741 listed.  \n4. DC disconnect  \n5. Distributed Generation ( DG) source  \n7. Customer’s metering (optional)  \nPPL ELECTRIC FURNISHES, INSTALLS, MAINTAINS  \n6. Wired communication between PPL DER Management Device and inverter.  \n8. PPL Electric DER Management Device.  \n* Reference: SKETCH 55a REMSI_S057P1dwg  \n\n| RULES FOR ELECTRIC METER AND SERVICE INSTALLATIONS\u003Cbr>PPL ELECTRIC UTILITIES CORPORATION | Rules: 12, 28\u003Cbr>Date: 01/31/2025 Engr: JEU |\n| --- | --- |\n\n© 2022 PPL Electric Utilities Corporation. All rights ritrden: 02/05/2025  \nABpupsrionves: 0s4e495 Bash, Christopher R  \n\n| REMSI Sketches 51-100 Sketch \\#57 6-52\u003Cbr>| 0000-000-ST-6052 Custom ID: DCS 6-52\u003Cbr>Revision: 14\u003Cbr>Effective Date: 1/31/2025 Page 24 of 80 |\n| --- | --- |\n\nNOTES:  \n A. See PPL Electric customer-owned generation website for more information.  \nB. Application for customer-owned, inverter-based renewable generation must be completed. See customerowned generation applications.  \nC. PPL Electric requires an independent electrical inspection. The inspector is required to verify the IEEE/UL listing of the inverter.  \nD. Installation must adhere to requirements of the National Electrical Code (NEC) article 690 and article 705.  \nE. All labeling must be in accordance with NEC article 690.  \nF. In addition to Note D, PPL Electric will install permanent labeling on the meter base (CID 1012171) and pad mount transformer (CID 1012171) or pole top transformer (CID 1013816) upon receipt of inspection.  \nG. Metering – 480v self-contained – see self-contained 480v metering series organization map to determine appropriate sketch for service type and size, for metering requirements, and responsibilities. Foreign energy sources shall not be connected directly to metering equipment. See rule 12.  \nH. Installations requiring 480v self-contained metering following sketch \\#71 or sketch \\#72 requires PPL Electric review and approval.  \nI. If a neutral connection exists at the inverter, the inverter neutral shall be connected to the service neutral.  \nJ. customer shall contact PPL Electric prior to any new installations depicted in this sketch.  \nK. PPL requires a local RS-485 or ethernet communication interface, also referred to as a communication port, to be open and accessible for the company owned DER management device (IEEE 1547-2018, sec.  \n10. 1,4) . Enclosure containing the communications interface shall include provisions for 120V or 277V power source , neutral, and grounding , either by way of providing safely terminated conductors or ensuring adequate sp","cbCaiqDP8XzxZOMx","https://ap.wps.com/l/cbCaiqDP8XzxZOMx","pdf",611156,"English","# Sketch #57 Requirements\n## Electrical configurations and limits\n## Responsibilities: customer and PPL electric\n## Installation notes and labeling\n## Metering and communication interface requirements","[{\"question\":\"What DG capacity limit does Sketch #57 allow for inverter-based renewable generation?\",\"answer\":\"Sketch #57 allows DG capacity up to and including 20% of the load center bus bar rating.\"},{\"question\":\"What inverter listing requirements are referenced for the installation?\",\"answer\":\"The inverter(s) must be labeled as IEEE 1547 / UL 1741 listed, and an independent electrical inspection is required to verify this listing.\"},{\"question\":\"What communication interface and networking details are required for DER management?\",\"answer\":\"A local RS-485 or Ethernet communication interface must be open and accessible for the company-owned DER management device, with static IP details required for Modbus TCP or DHCP for IEEEE 2030.5, and networking between multiple inverters via RS-485 multidrop or per manufacturer guidelines.\"}]","REMSI Sketches 51-100 - Sketch #57 - Inverter-based renewable generation for DG capacity up to and including 20% of the load center bus bar rating | PDF",1790316420,[145,149,153],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/8b72f46328d09abbe670c8e7fa1fa326.webp",983,1272,{"page_no":26,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/b455666df9c29ee1355bb4c1ea242301.webp",982,1270,{"page_no":30,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/11d63b7937040f0082e3f0acabc4083c.webp",981,1269]