[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663386-105":59,"doc-detail-663386-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","redlands-fire-department-fire-alarm-water-flow-alarm-signaling-systems","Redlands Fire Department - Fire Alarm, Water Flow Alarm & Signaling Systems","","Guidance outlines when fire alarm, water flow alarm, and signaling systems are required under the 2025 California Building Code (CBC) and California Fire Code (CFC), and the 2025 NFPA standards. It specifies plan submittal expectations, including scaled shop drawings, scope of work statements, designer and contractor details, device data sheets, equipment legends, and completeness requirements tied to CFC provisions. It also covers annunciator and FACU placement considerations and required voltage drop and standby battery calculations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/redlands-fire-department-fire-alarm-water-flow-alarm-signaling-systems/663386/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/redlands-fire-department-fire-alarm-water-flow-alarm-signaling-systems/663386.png","ImageObject",300,407,{"name":92,"@type":93},"Jasmine","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What codes and standards govern fire alarm, water flow alarm, and signaling systems?","Question",{"text":112,"@type":113},"The document states that the 2025 CBC and CFC specify where the systems are required and that the 2025 NFPA standards apply to design, installation, operation, testing, and maintenance.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be included when submitting plan sets for these systems?",{"text":117,"@type":113},"It requires three sets of scaled plans, with designer-filled RFD notes, a detailed scope of work statement, device data sheets, equipment legends/bills of materials, and scaled floor plans meeting CFC completeness requirements.",{"name":119,"@type":110,"acceptedAnswer":120},"How are voltage drop and standby battery calculations handled?",{"text":121,"@type":113},"Voltage drop must not exceed device listing requirements, with calculations for the most demanding circuits. Standby battery calculations must cover both standby and alarm conditions for 100% load and include a minimum 20% safety margin, maintaining standby for 24 hours and operating devices for 5 minutes afterward.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663386,1793227176,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":39,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":46},2336478487870,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","COMMUNITY RISE REDUCTION  \n909 798 7601  \n[www.cityofredlands.org/fire-department](www.cityofredlands.org/fire-department)  \nFire Alarm, Water Flow Alarm, & Signaling Systems  \nPURPOSE  \nThe 2025 California Building Code (CBC) and California Fire Code (CFC) specify where the systems are required. These codes and the 2025 National Fire Protection Association Standards (NFPA) apply to the design, installation, operation, testing, and maintenance of the systems.  \nSCOPE  \nThe 2025 California Building Code (CBC) and California Fire Code (CFC) specify where the systems are required. These codes and the 2025 National Fire Protection Association Standards (NFPA) apply to the design, installation, operation, testing, and maintenance of the systems.  \nPLAN SUBMITAL REQUIREMENTS  \nSubmit three sets of scaled plans. The plans/shop drawings shall contain the following information, when any of the sections involve this project.  \n1. Within the RFD notes, the occupant history, central station and device count information for new, relocated and replaced devices, shall be filled-in by the designer.  \nA. Copy the completed,“Fire Alarm, Water Flow Alarm & Signaling Systems” notes, on the plans.  \n2. Scope of Work Statement; Include all of the following information in the scope of work, on the plans:  \nA. Indicate type of system proposed: (Notification, initiating, water flow monitoring, etc. ) .  \nB.  Describe in detail:  \n1) The limits of the work for this specific set of plans.  \n2) Describe the reason when modifying an existing alarm or water flow system.  \nC.  State the CBC Occupancy group from the approved building department architectural plans. (Contact the project architect) .  \nD. State if you are you proposing a system or specific devices that are not required by codes (and/or) if you are applying current codes that are designated for new buildings into a tenant improvement project.  \nE. Identify the occupant load on the first floor and that above the first floor.  \n3. Design, Coordination, and Installation Information: (Provide all)  \nA. Designer’s name, license number and phone number.  \nB. Coordinator of design/install name and phone number.  \nC. Installing contractor’s C-10 License number.  \n4. Project Identification: Complete address of the project (include building  \nnames/numbers, suite numbers, and tract and lot numbers for residential projects) .  \n5. Device Data Sheets: Provide one set of device manufacture data sheets for all devices. Highlight the specific model and power consumption requirements.  \n6. Completeness of Shop Drawings: Provide a scaled floor plan (no smaller than 1/16”=1’) showing the location of all devices involving your scope of work. Label all areas that are not part of the job scope. Shop drawings shall meet the requirements of CFC 907.1.2 and shall include the following, but not limited to: Zone requirements, riser and point to point diagrams showing number of devices on each circuit, floor identification, all walls and doors, a description of use for each room, terminal and circuit identification, power supplies, and any other information needed to demonstrate the function of the system. Drawings shall use the symbols identified in NFPA 170.  \n7. Equipment Legend/Bill of Materials. The legend shall indicate newly added, relocated, and replaced devices. (This shall match the device count on the RFD notes) . The legend shall also provide device symbols, manufacturer name, model number, and the California State Fire Marshal listing numbers.  \n8. Annunciator and Main Fire Alarm Control Unit(s) (FACU): A remote annunciator indicating device, is required when the FACU is not located in an area that the fire department would initially respond to or is in an area that may be difficult to gain access to. The annunciator should be placed in or near the front lobby or entrance area. In multi-tenant suites, locate the annunciator in the lowest numbered/lettered suite or the lowest street address. The FACU should b","cbCaidkV255Mbfzl","https://ap.wps.com/l/cbCaidkV255Mbfzl","pdf",278650,"English","# Purpose\n# Scope\n# Plan Submittal Requirements\n## RFD notes and occupant/device information\n## Scope of work statement requirements\n## Design, coordination, and installation information\n## Project identification\n## Device data sheets\n## Completeness of shop drawings\n## Equipment legend/bill of materials\n## Annunciator and FACU requirements\n## Voltage drop and battery calculations","[{\"question\":\"What codes and standards govern fire alarm, water flow alarm, and signaling systems?\",\"answer\":\"The document states that the 2025 CBC and CFC specify where the systems are required and that the 2025 NFPA standards apply to design, installation, operation, testing, and maintenance.\"},{\"question\":\"What must be included when submitting plan sets for these systems?\",\"answer\":\"It requires three sets of scaled plans, with designer-filled RFD notes, a detailed scope of work statement, device data sheets, equipment legends/bills of materials, and scaled floor plans meeting CFC completeness requirements.\"},{\"question\":\"How are voltage drop and standby battery calculations handled?\",\"answer\":\"Voltage drop must not exceed device listing requirements, with calculations for the most demanding circuits. Standby battery calculations must cover both standby and alarm conditions for 100% load and include a minimum 20% safety margin, maintaining standby for 24 hours and operating devices for 5 minutes afterward.\"}]","Redlands Fire Department - Fire Alarm, Water Flow Alarm & Signaling Systems | PDF"]