[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-296864-105":59,"doc-detail-296864-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","redfern-station-upgrade-new-southern-concourse-environmental-impact-statement","Redfern Station Upgrade - New Southern Concourse Environmental Impact Statement","","Redfern Station Upgrade – New Southern Concourse Environmental Impact Statement supports the Transport Access Program and evaluates the proposed upgrade for Redfern Station in New South Wales. The Project includes constructing and operating a new pedestrian concourse south of the existing Lawson Street concourse, providing lift and stair access to Platforms 1–10. It also establishes a new connection across the railway corridor between Little Eveleigh Street and Marian Street, together with associated interchange upgrades. Prepared under the NSW Environmental Planning and Assessment framework, the statement describes roles, responsibilities, certification, and the regulatory basis for assessment.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/redfern-station-upgrade-new-southern-concourse-environmental-impact-statement/296864/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/redfern-station-upgrade-new-southern-concourse-environmental-impact-statement/296864.png","ImageObject",300,407,{"name":92,"@type":93},"Fans","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-19","2026-09-18",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What proposal is assessed in this Environmental Impact Statement?","Question",{"text":112,"@type":113},"The document assesses the Redfern Station Upgrade – New Southern Concourse, which includes construction and operation of a new southern pedestrian concourse and related interchange upgrades.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What key facilities does the new southern concourse provide?",{"text":117,"@type":113},"The new concourse provides lift and stair access to Platforms 1–10 and creates a new connection across the railway corridor between Little Eveleigh Street and Marian Street.",{"name":119,"@type":110,"acceptedAnswer":120},"Under what legal framework is the Environmental Impact Statement prepared?",{"text":121,"@type":113},"It is prepared under Part 5.1 of the (NSW) Environmental Planning and Assessment Act 1979 and in accordance with Part 3 of Schedule 2 of the Environmental Planning and Assessment Regulation 2000.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},296864,1789738040,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144,"preview_page_count":4},5909892330395,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Redfern Station Upgrade – New Southern Concourse Environmental Impact Statement  \nArtist’s impression of the proposed Redfern Station Upgrade - New Southern Concourse. Indicative only, subject to detailed design.  \nTransport for NSW | May 2020  \nCertification  \nSubmission of Environmental Impact Statement  \nThis Environmental Impact Statement has been prepared under Part 5.1 of the (NSW) Environmental Planning and Assessment Act 1979 and in accordance with Part 3 of Schedule 2 of the Environmental Planning and Assessment Regulation 2000.  \nEnvironmental Impact Statement prepared by:  \n\n| Role | Project manager | Lead author | Independent reviewer |\n| --- | --- | --- | --- |\n| Name | Rachel O’Hara | Dylan Drysdale | Catherine Brady |\n| Position | Principal Environmental Scientist | Senior Environmental Scientist | Technical DirectorEnvironment |\n| Qualifications | Bachelor of Environmental Science; CEnvP | Bachelor of Science (Environmental Science); Certificate of Environmental Management Systems | Bachelor of Arts (Hons) Geography and Economics Master of Regional and Urban Planning |\n| Address | AECOM Australia Pty Ltd\u003Cbr>Level 21\u003Cbr>420 George Street\u003Cbr>Sydney\u003Cbr>NSW 2000 |  |  |\n| In respect of | Environmental Impact Statement Redfern Station Upgrade – New Southern Concourse |  |  |\n| Applicant Name | Transport for NSW |  |  |\n| Applicant Address | 18 Lee Street\u003Cbr>Chippendale NSW 2008 |  |  |\n| Proposed development | Redfern Station Upgrade – New Southern Concourse involves the construction and operation of a pedestrian concourse to the south of the existing Lawson Street concourse providing both lift and stair access to Platforms 1-10. The new pedestrian concourse would provide a new connection across the railway corridor, extending between Little Eveleigh Street and Marian Street in the suburbs of Redfern and Eveleigh and include associated interchange upgrades. |  |  |\n| Land to be\u003Cbr>developed | Located on land that forms part of the existing rail corridor and adjacent land owned by the NSW Government or Council owned land. |  |  |\n| Environmental Impact Statement | An Environmental Impact Statement is attached that assesses all matters specified in the Secretary’s Environmental Assessment Requirements dated 20 December 2019, in accordance with Division 5.2 of the (NSW) Environmental Planning and Assessment Act 1979 and other relevant legislation. |  |  |\n| Declaration | I certify that I have prepared the contents of the Environmental Impact Statement in accordance with Schedule 2 of the Environmental Planning and Assessment Regulation 2000 and the Secretary’s Environmental Assessment Requirements dated 20 December 2019, and that, to the best of my knowledge the information contained in the Environmental Impact Statement is not false or misleading. |  |  |\n\n\n| Role | Project manager | Lead author | Independent reviewer |\n| --- | --- | --- | --- |\n| Signatures | | | |\n| Name | Rachel O’Hara | Dylan Drysdale | Catherine Brady |\n| Date | 22/05/2020 | 22/05/2020 | 22/05/2020 |\n\nAECOM Australia Pty Limited (AECOM) has prepared this Environmental Impact Statement (EIS) in accordance with the usual care and thoroughness and based on generally accepted practices and standards at the time it was prepared. No other warranty, expressed or implied, is made as to the professional advice included in this EIS.  \nThis EIS has been produced in accordance with the stipulations in the Environmental Planning and Assessment Act 1979 and the Environmental Planning and Assessment Regulation 2000.  \nWhere this EIS indicates that information has been provided to AECOM by third parties, AECOM has made no independent verification of this information except as expressly stated in the EIS. AECOM assumes no liability for any inaccuracies in or omissions to that information.  \nThis EIS was prepared between July 2019 and May 2020 and is based on the conditions encountered and information reviewed at the time of preparation. AECOM disclaims responsibi","cbCaijkLN3QCugSQ","https://ap.wps.com/l/cbCaijkLN3QCugSQ","pdf",26578380,429,"English","# Certification\n## Submission of Environmental Impact Statement\n# Declaration\n# Executive summary\n# Overview","[{\"question\":\"What proposal is assessed in this Environmental Impact Statement?\",\"answer\":\"The document assesses the Redfern Station Upgrade – New Southern Concourse, which includes construction and operation of a new southern pedestrian concourse and related interchange upgrades.\"},{\"question\":\"What key facilities does the new southern concourse provide?\",\"answer\":\"The new concourse provides lift and stair access to Platforms 1–10 and creates a new connection across the railway corridor between Little Eveleigh Street and Marian Street.\"},{\"question\":\"Under what legal framework is the Environmental Impact Statement prepared?\",\"answer\":\"It is prepared under Part 5.1 of the (NSW) Environmental Planning and Assessment Act 1979 and in accordance with Part 3 of Schedule 2 of the Environmental Planning and Assessment Regulation 2000.\"}]","Redfern Station Upgrade - New Southern Concourse Environmental Impact Statement | PDF",1081]