[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-112430-en":3,"doc-seo-112430-105":28,"detail-sidebar-cat-0-en-105":89},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},112430,5909877438554,"Maeve","https://ap-avatar.wpscdn.com/avatar/5600025385ad2bf12a7?_k=1778553567797529272",8,"Research & Report","Record of Approval on an Absence-of-Objection Basis - June 24, 2026 - Tunisia renewable energy guarantees approval up to US$300 million","Approval on an absence-of-objection basis dated Wednesday, June 24, 2026, covers Tunisia guarantees to support renewable energy investments. Guarantees extend to Voltalia S.A. and/or its group companies for investments into Menzel Habib Parc Solaire SARL, and to other yet-to-be-identified investors for additional Tunisia project enterprises. The board approved issuing guarantees for up to US$300 million, covering equity, quasi-equity, shareholder loans, and related future earnings or profits. Reporting cites the President’s memorandum and a named report. Lailee Jane Moghtader objected; Alexey Nickolaevich Morozov abstained.","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Wednesday, June 24, 2026  \nTunisia  \nGuarantees to (i) Voltalia S.A. (France) and/or any ofits group companies to cover their investments into Menzel Habib Parc Solaire SARL; and (ii) any other investors yet to be identified to cover their investments into Project Enterprises yet to be identified in Tunisia for other renewable energy projects, including solar, wind, and battery energy storage stems  \nThe Board of Directors concurred with and approved on June 24, 2026 the President’s proposal to issue guarantees for a total amount of up to US$300 million to (i) Voltalia S.A. (France and/or any ofits group companies, in respect of their investments into Menzel Habib Parc Solaire SARL (“Menzel”), and (ii) any other investors yet to be identified in respect of their investments into other Projects yet to be identified to be developed under the Program (together, the “Guarantee Holders”), covering their equity, quasi-equity, and/or shareholder loan investments as well as future earnings or profits and shareholder loan interests as set out in the Memorandum from the President and a report entitled “Tunisia-Guarantees to (i) Voltalia S.A. (France) and/or any ofits group companies to cover their investments into Menzel Habib Parc Solaire SARL; and (ii) anyother investors yet to be identified to cover their investments into Project Enterprises yet to be identified in Tunisia for other renewable energy projects, including solar, wind, and battery energy storage stems”(MIGA/R2026-0075, dated June 11, 2026) . Lailee Jane Moghtader wished to be recorded as objecting. Alexey Nickolaevich Morozov wished to be recorded as abstaining  \n.","cbCaih7TwidrTUMt","https://ap.wps.com/l/cbCaih7TwidrTUMt","pdf",112187,1,"English","en",105,"# Approval notice (absence of objection)\n## Scope of guarantees\n## Approval date and decision summary\n## Coverage amount and investment types\n## Objections and abstentions","[{\"question\":\"What is the approval decision dated June 24, 2026 based on?\",\"answer\":\"The decision is recorded as approved on an absence-of-objection basis on Wednesday, June 24, 2026.\"},{\"question\":\"Which parties and projects are covered by the guarantees in Tunisia?\",\"answer\":\"The guarantees cover Voltalia S.A. and/or its group companies for investments into Menzel Habib Parc Solaire SARL, and also cover other yet-to-be-identified investors for additional Tunisia renewable energy project enterprises.\"},{\"question\":\"What is the maximum guarantee amount and what investments does it cover?\",\"answer\":\"The board approved guarantees for a total amount up to US$300 million, covering equity, quasi-equity, shareholder loans, and related future earnings or profits and shareholder loan interests.\"}]",1784495014,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":84,"head_meta":86,"extra_data":88,"updated_unix":26},"record-of-approval-on-an-absence-of-objection-basis-june-24-2026-tunisia-renewable-energy-guarantees-approval-up-to-us300-million","",{"@graph":34,"@context":83},[35,51,66],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/record-of-approval-on-an-absence-of-objection-basis-june-24-2026-tunisia-renewable-energy-guarantees-approval-up-to-us300-million/112430/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":60,"encodingFormat":58,"isAccessibleForFree":61,"interactionStatistic":62},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-22","2026-07-19",true,{"@type":63,"interactionType":64,"userInteractionCount":20},"InteractionCounter",{"@type":65},"ViewAction",{"@type":67,"mainEntity":68},"FAQPage",[69,75,79],{"name":70,"@type":71,"acceptedAnswer":72},"What is the approval decision dated June 24, 2026 based on?","Question",{"text":73,"@type":74},"The decision is recorded as approved on an absence-of-objection basis on Wednesday, June 24, 2026.","Answer",{"name":76,"@type":71,"acceptedAnswer":77},"Which parties and projects are covered by the guarantees in Tunisia?",{"text":78,"@type":74},"The guarantees cover Voltalia S.A. and/or its group companies for investments into Menzel Habib Parc Solaire SARL, and also cover other yet-to-be-identified investors for additional Tunisia renewable energy project enterprises.",{"name":80,"@type":71,"acceptedAnswer":81},"What is the maximum guarantee amount and what investments does it cover?",{"text":82,"@type":74},"The board approved guarantees for a total amount up to US$300 million, covering equity, quasi-equity, shareholder loans, and related future earnings or profits and shareholder loan interests.","https://schema.org",{"og:url":49,"og:type":85,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":87,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":90},[91,95,99,103,108,113,118,121,126,129,133],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":92,"show_sort_weight":93,"slug":94},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":96,"show_sort_weight":97,"slug":98},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":100,"show_sort_weight":101,"slug":102},"Exam",70,"exam",{"id":104,"doc_module":4,"doc_module_name":44,"category_name":105,"show_sort_weight":106,"slug":107},5,"Comic",60,"comic",{"id":109,"doc_module":4,"doc_module_name":44,"category_name":110,"show_sort_weight":111,"slug":112},6,"Technology",50,"technology",{"id":114,"doc_module":4,"doc_module_name":44,"category_name":115,"show_sort_weight":116,"slug":117},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":119,"slug":120},30,"research-report",{"id":122,"doc_module":4,"doc_module_name":44,"category_name":123,"show_sort_weight":124,"slug":125},9,"Religion & Spirituality",20,"religion-spirituality",{"id":124,"doc_module":4,"doc_module_name":44,"category_name":127,"show_sort_weight":124,"slug":128},"World Cup","world-cup",{"id":130,"doc_module":4,"doc_module_name":44,"category_name":131,"show_sort_weight":130,"slug":132},10,"Lifestyle","lifestyle",{"id":134,"doc_module":4,"doc_module_name":44,"category_name":135,"show_sort_weight":104,"slug":136},19,"General","general"]