[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-112376-en":3,"doc-seo-112376-105":28,"detail-sidebar-cat-0-en-105":88},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":20,"language":21,"language_code":22,"site_id":23,"html_lang":22,"table_of_contents":24,"faqs":25,"seo_title":13,"seo_description":14,"update_tm":26,"read_time":27},112376,137441390410,"Hazel","https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984",8,"Research & Report","Record of Approval on an Absence of Objection Basis - June 22, 2026","Approval actions granted on an absence-of-objection basis on Monday, June 22, 2026 for the Western and Central Africa-Regional Program for Distributed Access Through Renewable Energy Solutions (Regional DARES) using a Multi-Phase Programmatic Approach (MPA). The Executive Directors approved a US$440 million financing envelope, plus Phase 1 credits and grants: EUR 34.2 million to Benin, US$45 million to Liberia, SDR 40.1 million to Central African Republic, and SDR 43.8 million to Sierra Leone, subject to terms in the President’s Memorandum.","Public Disclosure Authorized Public Disclosure Authorized  \nThe following item has been approved on an Absence-of-Objection Basis  \non Monday, June 22, 2026  \nWestern and Central Africa-Regional Program for Distributed Access Through Renewable Energy Solutions (Regional DARES) Using the Multi-Phase Programmatic Approach (MPA), Including Phase 1 Credits and Grants  \nThe Executive Directors approved on June 22, 2026 a financing envelope of US$440 million for the Regional Program for Distributed Access Through Renewable Energy Solutions (Regional DARES) Using the Multi-Phase Programmatic Approach (MPA) . In parallel, they approved credits in the amount of EUR 34.2 million (US$40 million equivalent) to Benin and in the amount of US$45 million to Liberia, as well as grants in the amount of SDR 40.1 million (US$55 million equivalent) to Central African Republic and in the amount of SDR 43.8 (US$60 million equivalent) to Sierra Leone for Phase 1 under the Regional DARES Using the MPA. The approvals have been granted on the terms and conditions set out in the President’s Memorandum (IDA/R2026-0154, dated June 2, 2026) . Jiandi Ye wished to be recorded as abstaining.","cbCaiik26DhoKQmo","https://ap.wps.com/l/cbCaiik26DhoKQmo","pdf",98759,1,"English","en",105,"# Approval Summary\n## Financing Envelope\n## Phase 1 Credits and Grants\n## Approval Conditions and Abstention","[{\"question\":\"What program was approved on June 22, 2026?\",\"answer\":\"The Western and Central Africa-Regional Program for Distributed Access Through Renewable Energy Solutions (Regional DARES) using the Multi-Phase Programmatic Approach (MPA) was approved on an absence-of-objection basis.\"},{\"question\":\"What amounts were approved in the financing envelope and Phase 1?\",\"answer\":\"A US$440 million financing envelope was approved, with Phase 1 approvals including EUR 34.2 million (Benin), US$45 million (Liberia), SDR 40.1 million (Central African Republic), and SDR 43.8 million (Sierra Leone).\"},{\"question\":\"What were the approvals based on and who abstained?\",\"answer\":\"The approvals were granted on terms and conditions set out in the President’s Memorandum (IDA/R2026-0154, dated June 2, 2026). Jiandi Ye requested to be recorded as abstaining.\"}]",1784494682,3,{"code":4,"msg":29,"data":30},"ok",{"site_id":23,"language":22,"slug":31,"title":13,"keywords":32,"description":14,"schema_data":33,"social_meta":83,"head_meta":85,"extra_data":87,"updated_unix":26},"record-of-approval-on-an-absence-of-objection-basis-june-22-2026","",{"@graph":34,"@context":82},[35,51,65],{"@type":36,"itemListElement":37},"BreadcrumbList",[38,42,46,48],{"item":39,"name":40,"@type":41,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":43,"name":44,"@type":41,"position":45},"https://docshare.wps.com/document/","Document",2,{"item":47,"name":12,"@type":41,"position":27},"https://docshare.wps.com/document/research-report/",{"item":49,"name":13,"@type":41,"position":50},"https://docshare.wps.com/document/record-of-approval-on-an-absence-of-objection-basis-june-22-2026/112376/",4,{"url":49,"name":13,"@type":52,"author":53,"headline":13,"publisher":55,"fileFormat":58,"inLanguage":22,"description":14,"dateModified":59,"datePublished":59,"encodingFormat":58,"isAccessibleForFree":60,"interactionStatistic":61},"DigitalDocument",{"name":9,"@type":54},"Person",{"url":39,"name":56,"@type":57},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":62,"interactionType":63,"userInteractionCount":4},"InteractionCounter",{"@type":64},"ViewAction",{"@type":66,"mainEntity":67},"FAQPage",[68,74,78],{"name":69,"@type":70,"acceptedAnswer":71},"What program was approved on June 22, 2026?","Question",{"text":72,"@type":73},"The Western and Central Africa-Regional Program for Distributed Access Through Renewable Energy Solutions (Regional DARES) using the Multi-Phase Programmatic Approach (MPA) was approved on an absence-of-objection basis.","Answer",{"name":75,"@type":70,"acceptedAnswer":76},"What amounts were approved in the financing envelope and Phase 1?",{"text":77,"@type":73},"A US$440 million financing envelope was approved, with Phase 1 approvals including EUR 34.2 million (Benin), US$45 million (Liberia), SDR 40.1 million (Central African Republic), and SDR 43.8 million (Sierra Leone).",{"name":79,"@type":70,"acceptedAnswer":80},"What were the approvals based on and who abstained?",{"text":81,"@type":73},"The approvals were granted on terms and conditions set out in the President’s Memorandum (IDA/R2026-0154, dated June 2, 2026). Jiandi Ye requested to be recorded as abstaining.","https://schema.org",{"og:url":49,"og:type":84,"og:title":13,"og:site_name":56,"og:description":14},"article",{"robots":86,"canonical":49},"index,follow",{"doc_id":7,"site_id":23},{"code":4,"msg":5,"data":89},[90,94,98,102,107,112,117,120,125,128,132],{"id":20,"doc_module":4,"doc_module_name":44,"category_name":91,"show_sort_weight":92,"slug":93},"Story & Novel",90,"story-novel",{"id":45,"doc_module":4,"doc_module_name":44,"category_name":95,"show_sort_weight":96,"slug":97},"Literature",80,"literature",{"id":50,"doc_module":4,"doc_module_name":44,"category_name":99,"show_sort_weight":100,"slug":101},"Exam",70,"exam",{"id":103,"doc_module":4,"doc_module_name":44,"category_name":104,"show_sort_weight":105,"slug":106},5,"Comic",60,"comic",{"id":108,"doc_module":4,"doc_module_name":44,"category_name":109,"show_sort_weight":110,"slug":111},6,"Technology",50,"technology",{"id":113,"doc_module":4,"doc_module_name":44,"category_name":114,"show_sort_weight":115,"slug":116},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":44,"category_name":12,"show_sort_weight":118,"slug":119},30,"research-report",{"id":121,"doc_module":4,"doc_module_name":44,"category_name":122,"show_sort_weight":123,"slug":124},9,"Religion & Spirituality",20,"religion-spirituality",{"id":123,"doc_module":4,"doc_module_name":44,"category_name":126,"show_sort_weight":123,"slug":127},"World Cup","world-cup",{"id":129,"doc_module":4,"doc_module_name":44,"category_name":130,"show_sort_weight":129,"slug":131},10,"Lifestyle","lifestyle",{"id":133,"doc_module":4,"doc_module_name":44,"category_name":134,"show_sort_weight":103,"slug":135},19,"General","general"]