[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662973-105":59,"doc-detail-662973-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","record-drawing-requirements-preparation-guidelines","Record Drawing Requirements - Preparation Guidelines","","Record Drawing Requirements outline how contractors must document post-construction stormwater conditions using the most recently approved Post-Construction Stormwater Management Plan. The contractor must retain on-site copies of the approved plan, document all changes during construction, and prepare a marked-up approved PCSMP reflecting deviations and measured values. Record drawings must be prepared by registered professionals, formatted for clarity, and submitted to the Project Dashboard after construction but before final inspection, with drafting and verification standards.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/record-drawing-requirements-preparation-guidelines/662973/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/record-drawing-requirements-preparation-guidelines/662973.png","ImageObject",300,407,{"name":92,"@type":93},"Olivia Brown","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must the contractor keep on-site during construction?","Question",{"text":112,"@type":113},"The contractor must keep a copy of the most recently approved Post-Construction Stormwater Management Plan (Approved PCSMP) on-site at all times and document all changes as they occur.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When should the marked-up Approved PCSMP and record drawings be prepared and submitted?",{"text":117,"@type":113},"After construction is completed but prior to final inspection, the contractor must prepare a marked-up version of the Approved PCSMP showing all changes and measurements, and submit the record drawings with the Construction Certification Package to PWD for review via the Project Dashboard.",{"name":119,"@type":110,"acceptedAnswer":120},"What minimum plan requirements apply to the Record Drawing sheets?",{"text":121,"@type":113},"Sheets must be clear and legible, use the Approved PCSMP as a base, include a north arrow, a measurable plan scale not exceeding 1\" = 50', label the documents “PROJECT RECORD” in large red letters, and show required elevations, utilities, facilities locations, and flow direction.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662973,1793224010,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},16904993612988,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","Record Drawing Requirements  \nPlease note that the information below is an abridged version of PWD’s requirements for the preparation of Record Drawings. For more detailed information regarding Record Drawings, please refer to Section 5.3.2 of PWD’s Stormwater Management Guidance Manual.  \nA. General Requirements  \n1. The contractor must keep a copy of the Post-Construction Stormwater Management Plan most recently approved by PWD (Approved PCSMP) on-site at all times and document all changes from the Approved PCSMP as they occur. Documentation of these changes must be available to PWD’s inspection staffat all times during construction.  \n2. During construction, the contractor should not cover, backfill, or seal any SMP until all required measurements (i.e. measurements required for the project’s Construction Certification Package and/or Record Drawings)have been acquired.  \n3. When construction is completed, a marked-up version of the Approved PCSMP must be prepared that indicates all changes or deviations from the Approved PCSMP, approved field change or otherwise. The measurements required in the project’s Construction Certification Package must be reflected on these drawings. This marked-up copy of the Approved PCSMP, and any supplementary documentation, will be considered the project’s Record Drawing(s) .  \n4. Record Drawings may be prepared by any of the following registered professionals:  \nProfessional Engineers, Registered Architects, Landscape Architects, Professional Land Surveyors, Professional Geologists, and Licensed Contractors. Each plan sheet must be dated and contain the signature and professional seal or Contractor License Number of the preparer. Please note that PA DEP may have different requirements concerning the types of professionals who may prepare Record Drawings. For projects that require a NPDES permit, the applicant is strongly encouraged to refer to PA DEP’s requirements for Record Drawings before selecting a professional to prepare Record Drawing(s) for PWD.  \n5. The Record Drawings represent the project’s as-built conditions, including all revisions made necessary by change orders, design modifications, requests for information and/or field orders. The information on the Record Drawing(s) will be assumed to be correct unless it conflicts with any observations made by PWD staff during inspections/site visits.  \n6. The Record Drawing(s), together with the Construction Certification Package, should be submitted to PWD for review after construction has been completed but prior to the final inspection. The Record drawing must be submitted to the Project Dashboard.  \n7. The contractor must maintain copies of all books, records, and documents pertaining to PCSMP construction for a period of five years following completion of the contract.  \nB. Record Drawing Plan Requirements  \nThe Record Drawing(s) must be clear and legible and must meet, at a minimum, the following requirements:  \n1. Use the Approved PCSMP as a base.  \n2. Provide a north arrow.  \n3. Provide a measurable plan scale (not to exceed 1” = 50’) .  \n4. Label each document “PROJECT RECORD”with large, red letters.  \n5. Provide a Record Drawing drafting date on each sheet.  \n6. Highlight information confirmed to be in accordance with the Approved PCSMP in yellow.  \n7. Identify any deviations from the Approved PCSMP by using red indelible ink to cross out the information on the Approved PCSMP and replace it with the as-built information.  \n8. Ensure that the information reflected on the Record Drawing(s) is consistent with all measurements required to be documented in the project’s Construction Certification Package.  \n9. Horizontal variations greater than one foot must be shown dimensionally or through stations.  \n10. Vertical elevation variations greater than 0.01 feet must be provided for all shown design elevations.  \n11. Clearly show the location of all stormwater management facilities in plan view.  \n12. Label the distance from lot lines a","cbCaiiSZ7rzxOG1F","https://ap.wps.com/l/cbCaiiSZ7rzxOG1F","pdf",131164,"English","# A. General Requirements\n## 1-7 General requirements\n# B. Record Drawing Plan Requirements\n## 1-22 Plan requirements","[{\"question\":\"What must the contractor keep on-site during construction?\",\"answer\":\"The contractor must keep a copy of the most recently approved Post-Construction Stormwater Management Plan (Approved PCSMP) on-site at all times and document all changes as they occur.\"},{\"question\":\"When should the marked-up Approved PCSMP and record drawings be prepared and submitted?\",\"answer\":\"After construction is completed but prior to final inspection, the contractor must prepare a marked-up version of the Approved PCSMP showing all changes and measurements, and submit the record drawings with the Construction Certification Package to PWD for review via the Project Dashboard.\"},{\"question\":\"What minimum plan requirements apply to the Record Drawing sheets?\",\"answer\":\"Sheets must be clear and legible, use the Approved PCSMP as a base, include a north arrow, a measurable plan scale not exceeding 1\\\" = 50', label the documents “PROJECT RECORD” in large red letters, and show required elevations, utilities, facilities locations, and flow direction.\"}]","Record Drawing Requirements - Preparation Guidelines | PDF"]