[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-291303-105":59,"doc-detail-291303-en":135},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":128,"head_meta":130,"extra_data":132,"updated_unix":134},105,"en","rebel-applied-rooftop-systems-om-1318-quick-start-guide","Rebel Applied Rooftop Systems - OM 1318 - Quick Start Guide","","Quick Start and Operations Manual OM 1318 for Rebel Applied packaged rooftop systems, model DPSA, focusing on efficient start-up and safe operation. It outlines pre-operation inspection steps, main power supply checks, password-based access levels for MicroTech 4 controller functions, and temperature control setup using sensor options and setpoint source selection. It also covers cooling commissioning basics, including deadband behavior, setpoint selection, and how control temperature sources enable fan-only versus heating or cooling.",{"@graph":69,"@context":127},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/rebel-applied-rooftop-systems-om-1318-quick-start-guide/291303/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/rebel-applied-rooftop-systems-om-1318-quick-start-guide/291303.png","ImageObject",300,407,{"name":92,"@type":93},"Blitz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-12","2026-09-17",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",14,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119,123],{"name":110,"@type":111,"acceptedAnswer":112},"What should be checked before operating the rooftop unit?","Question",{"text":113,"@type":114},"Perform a visual inspection for damage, confirm unit location clearance requirements, verify condensate drain installation, and for VAV units confirm duct static pressure sensor tubing or building static pressure tubing installation. Also confirm field wiring completeness and discharge air sensor presence in the supply duct.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"How do password access levels affect controller menu availability?",{"text":118,"@type":114},"The MicroTech 4 interface supports four access levels: no password, Level 2, Level 4, and Level 6. Level 2 provides the highest access among password-provided levels; Level 6 and Level 4 enable additional menu groups including alarm lists, quick menu, commission unit, manual control, and service menu as described in the guide.",{"name":120,"@type":111,"acceptedAnswer":121},"How is the control temperature source selected for heating/cooling logic?",{"text":122,"@type":114},"Use the commission unit menu to set Htg/Clg ChgOvr Set Up and choose CtrlTempSrc. If you select Space, the unit responds to the space sensor; the guide notes that Space cannot be selected when the space sensor is not connected as directed. For setpoints controlled by the space sensor, set RemSptSrc to AI.",{"name":124,"@type":111,"acceptedAnswer":125},"What does cooling commissioning require when configuring deadband and setpoints?",{"text":126,"@type":114},"If the space sensor was not selected for setpoint control, navigate to Commission Unit / Cooling Set-Up and set Occ Clg Spt to the desired target. The guide states the default cooling dead band is 2°, and provides an example showing cooling enablement based on set point plus half the deadband (one degree).","https://schema.org",{"og:url":83,"og:type":129,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":131,"canonical":83},"index,follow",{"doc_id":133,"site_id":62},291303,1789644340,{"code":4,"msg":5,"data":136},{"doc_id":133,"user_id":137,"nickname":92,"user_avatar":138,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":139,"file_id":140,"file_url":141,"file_type":142,"file_size":143,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":46,"language":144,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":145,"faqs":146,"seo_title":147,"seo_description":67,"update_tm":134,"read_time":31},24464137899374,"https://us-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Quick Start and Operations Manual OM 1318  \nGroup: Applied Air Handling  \nPart Number: OM 1318  \nDate: March 2021  \nRebel Applied™  \nPackaged Rooftop Systems  \nModel DPSA  \nThe following is a quick start guide for your new super-efficient Rebel Applied rooftop unit. Follow these step-by-step procedures for getting the rooftop unit started in the most efficient way. Read IM 1287 and OM 1288 before operating the unit and adhere to procedures/ hazard identifications within the manuals. IM 1287’s warranty registration form includes initial start-up, fan, mechanical cooling, and heating start-up procedures that must be followed with this quick start guide. NOTE: Refrigerant pressures, subcooling, and superheat can be checked from the MicroTech® 4 unit controller. Refrigerant gauges are not required when doing start-up. Schrader fittings are for evacuation and charging purposes only except it there is a problem that would require conformation of transducer readings.  \nOperational, Installation and Maintenance Resources (read before operation)  \n• Rebel Applied Installation/Startup Manual ..... IM 1287  \n• MicroTech® 4 Unit Controller ............... OM 1288  \n• Rebel Applied Unit Controller Protocol Info . . . . ED 19117  \nUnit Inspection (perform before operation)  \n1. Visually inspect unit for damage outside and inside unit. Note any damage. Claims for freight damage must be filed by the consignee.  \n2. Confirm unit location meets ventilation and service clearance recommendations as stated in IM 1287 “Unit Clearances”.  \n3. Confirm unit condensate drain has been installed per IM 1287 “Unit Piping – Condensate Drain Connection”.  \n4. On VAV units, confirm that the duct static pressure sensor tubing and/or building static pressure tubing has been installed per IM 1287 “Installing Duct Static Pressure Taps”.  \n5. Confirm the discharge air sensor in the supply duct  \n6. Confirm all field wiring is complete.  \nNOTE: Remove power when making field connections.  \nDamage to the controller could result in making connections with the power applied.  \nQuick Start Guide  \nQuick Start Guide  \nMain Power Supply  \nSTEP 1  \nSTEP 2  \nConfirm that the electrical power wiring lugs are tight. Check for proper voltage as per submittaland the wiring diagram included with unit.  \nNOTE: Incoming power is not to exceed a voltage imbalance of 2%  \nUsing A Phase Sequencing Tester Confirm Power Source Or Sources If Multiple, Are All Phased Correctly For Clockwise Rotation.  \nPasswords  \nSTEP 3  \nVarious menu functions are accessible or inaccessible, depending on the access level of the user, and the password they enter, if any.  \nThere are four access levels, including no password, Level 2, Level 4, and Level 6, with Level 2 having the highest level of access. Without entering a password, the user has access only to basic status menu items. Entering the Level 6 password (5321) allows access to the Alarm Lists Menu, Quick Menu, and the View/Set Unit Menus group. Entering the Level 4 password (2526) allows similar access as Level 6 with the addition of the Commission Unit Menu, Manual Control, and Service Menu groups. Entering the Level 2 password (6363) allows similar access as Level 4 with the addition of the Unit Configuration Menu.  \nThe main password page is displayed when the keypad/display is first accessed the Home Key is pressed, the Back Key is pressed multiple times, or if the keypad/display has been idle longer than the Password Timeout (default 10 minutes) .The main password page provides access to enter a password, access the Quick Menu, view the current Unit State, access the alarm lists or view information about the unit. Alarms can be acknowledged without entering a password.  \nTemperature Controls Set Up / DAT Control with Space Temp  \nSTEP 4  \n.  \nSTEP 5  \nFor Rebel Applied units 30 to 52 ton, confirm that the space sensor is installed and connected to the terminal block TBLV2 at terminals: Sen1/s to 210, GDN/C to 236, Set/P to 212 and that ","cbCaiult4UE9YBAi","https://ap.wps.com/l/cbCaiult4UE9YBAi","pdf",1848330,"English","# Quick Start and Operations Manual OM 1318\n## Operational, Installation and Maintenance Resources\n## Unit Inspection (perform before operation)\n## Quick Start Guide\n## Main Power Supply\n## Passwords\n## Temperature Controls Set Up / DAT Control with Space Temp\n## Cooling Commissioning","[{\"question\":\"What should be checked before operating the rooftop unit?\",\"answer\":\"Perform a visual inspection for damage, confirm unit location clearance requirements, verify condensate drain installation, and for VAV units confirm duct static pressure sensor tubing or building static pressure tubing installation. Also confirm field wiring completeness and discharge air sensor presence in the supply duct.\"},{\"question\":\"How do password access levels affect controller menu availability?\",\"answer\":\"The MicroTech 4 interface supports four access levels: no password, Level 2, Level 4, and Level 6. Level 2 provides the highest access among password-provided levels; Level 6 and Level 4 enable additional menu groups including alarm lists, quick menu, commission unit, manual control, and service menu as described in the guide.\"},{\"question\":\"How is the control temperature source selected for heating/cooling logic?\",\"answer\":\"Use the commission unit menu to set Htg/Clg ChgOvr Set Up and choose CtrlTempSrc. If you select Space, the unit responds to the space sensor; the guide notes that Space cannot be selected when the space sensor is not connected as directed. For setpoints controlled by the space sensor, set RemSptSrc to AI.\"},{\"question\":\"What does cooling commissioning require when configuring deadband and setpoints?\",\"answer\":\"If the space sensor was not selected for setpoint control, navigate to Commission Unit / Cooling Set-Up and set Occ Clg Spt to the desired target. The guide states the default cooling dead band is 2°, and provides an example showing cooling enablement based on set point plus half the deadband (one degree).\"}]","Rebel Applied Rooftop Systems - OM 1318 - Quick Start Guide | PDF"]