[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649730-105":59,"doc-detail-649730-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","rcp-detail-and-ceiling-plan-notes-a121","RCP Detail and Ceiling Plan Notes - A121","","Architectural RCP ceiling detail sheets and schedule notes for suspended metal grid systems, APC and GWB (sag-resistant drywall) assemblies, and transitions to wall molding with J-beads and tape-and-sand smooth finishes. Includes multiple detail callouts (e.g., flush and reveal conditions, high/low configurations) and ceiling module guidance. Provides room-based area listings plus bid alternates covering doors, sinks, acoustic ceilings, wall coverings, backsplashes, tile carpet, and HVAC controls, along with coordination and discrepancy reporting requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/rcp-detail-and-ceiling-plan-notes-a121/649730/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/rcp-detail-and-ceiling-plan-notes-a121/649730.png","ImageObject",300,407,{"name":92,"@type":93},"Lucas Martin","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What ceiling systems and materials are referenced in the ceiling details?","Question",{"text":112,"@type":113},"The notes reference suspended metal grid systems with scheduled APC ceilings and sag-resistant GWB drywall, including flush/reveal conditions and transitions to wall molding.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What are the base bid vs. alternate bid themes mentioned?",{"text":117,"@type":113},"Alternates cover items such as acoustic ceiling inclusion/exclusion in specific break/resource areas, sink installation changes, vinyl wall covering and vinyl film changes, and specified material preferences.",{"name":119,"@type":110,"acceptedAnswer":120},"How should conflicts or discrepancies be handled during bidding and construction?",{"text":121,"@type":113},"Any conflicts between stated dimensions or plans and discrepancies must be reported to the architect; issues not brought up at bid time become the GC’s responsibility, and coordination with electrical/mechanical drawings is required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649730,1792804937,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},8796095360427,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","| 4/13/2020 6 :54 : 15 PM C :\\ Users\\ashley .sp inks\\ Documents\\ 1 13100 1000_SGO RENO_v20_A_jadis hersp inks . rvt | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>12 GA. HANGER WIRE\u003Cbr>TO STRUCT. ABOVE\u003Cbr>12' -8\"\u003Cbr>F\u003Cbr>1E DETAIL-APC/ GWB SOFFIT/ APC\u003Cbr>A121 3\" = 1'-0\"\u003Cbr>SUSP. METAL\u003Cbr>GRID SYSTEM\u003Cbr>12' -8\"\u003Cbr>9' -0\"\u003Cbr>DEMOUNTABLE BY OWNER\u003Cbr>VARIES SEE RCP\u003Cbr>3E\u003Cbr>A121\u003Cbr>12 GA. HANGER WIRE TO STRUCT. ABOVE\u003Cbr>SUSP. METAL\u003Cbr>GRID SYSTEM\u003Cbr>SCHEDULED APC CEILING\u003Cbr>WALL MOLDING, WHITE\u003Cbr>RCP DETAIL-APC LOW / BULKHEAD / APC HIGH\u003Cbr>3\" = 1'-0\"\u003Cbr>5/8\" GW B ON 3-5/8\"MTL. STUDS TO STRUCT. ABOVE\u003Cbr>GWB METAL CORNER BEADS\u003Cbr>2-1/2\" MTL. STUDS TO STRUCT. ABOVE\u003Cbr>SUSP. METAL GRID SYSTEM\u003Cbr>SCHEDULED APC CEILING\u003Cbr>SHADOW REVEAL TRANSITION TO GYP MOLDING, WHITE\u003Cbr>5/8\" SAG RESISTANT GW B ON 2-1/2\" MTL. STUDS\u003Cbr>METAL STUDS - DIAGONAL BRACE TO STRUCTURE AS REQ'D .\u003Cbr>HEIGHT\u003Cbr>PER PLAN\u003Cbr>SCHEDULED CEILING\u003Cbr>CONT. EDGE MOLDING, WHITE\u003Cbr>CONTINUOUS J BEAD, TAPE & SAND\u003Cbr>SMOOTH, TYP .\u003Cbr>5/8\" SAG\u003Cbr>RESISTANT GWB\u003Cbr>5E\u003Cbr>A121\u003Cbr>RCP DETAIL-GWB TO APC - FLUSH REVEAL\u003Cbr>3\" = 1'-0\"\u003Cbr>7E\u003Cbr>A121\u003Cbr>RCP DETAIL-TYP. APC HIGH / GYP LOW\u003Cbr>3\" = 1'-0\"\u003Cbr>12 GA. HANGER WIRE\u003Cbr>SUSP. METAL\u003Cbr>GRID SYSTEM\u003Cbr>E\u003Cbr>METAL STUDS - DIAGONAL\u003Cbr>BRACE TO STRUCTURE AS REQ'D .\u003Cbr>SEE RCP\u003Cbr>5/8\" SAG RESISTANT GWB\u003Cbr>TAPE & SAND SMOOTH, TYP .\u003Cbr>SEE RCP\u003Cbr>D\u003Cbr>5/8\" SAG RESISTANT GWB\u003Cbr>VERTICAL DRYWALL TOAPC MOLDING, WHITE\u003Cbr>SEE RCP\u003Cbr>SCHEDULED ACT\u003Cbr>CEILING\u003Cbr>SUSP. METAL GRID SYSTEM\u003Cbr>SEE RCP\u003Cbr>SCHEDULED ACT CEILING\u003Cbr>6\" AXIOM CLASSIC TRIM, WHITE\u003Cbr>(2\", 4\", 8\" SIM . )\u003Cbr>1D\u003Cbr>A121\u003Cbr>RCP DETAIL-TYP. GWB LOW / GWB HIGH\u003Cbr>3\" = 1'-0\"\u003Cbr>3D\u003Cbr>A121\u003Cbr>RCP DETAIL-TYP. APC HIGH/APC LOW & 6\" AXIOM TRIM\u003Cbr>3\" = 1'-0\"\u003Cbr>BREAKROOM / WORK ROOM 216\u003Cbr>B\u003Cbr>EA OFFICE 218\u003Cbr>AVC OFFICE 217\u003Cbr>SI OFFICE 7 221-B\u003Cbr>APC1 +10' - 0\"\u003Cbr>APC1 SI ADMIN\u003Cbr>+9' -0\" 220\u003Cbr>CORRIDOR 220\u003Cbr>APC1 +10' - 0\"\u003Cbr>SI D IR. OFFICE 220A\u003Cbr>APC1 +9' -0\"\u003Cbr>L&CE OFFICE 2 215D\u003Cbr>SI OFFICE 2\u003Cbr>220B\u003Cbr>SI OFFICE 3\u003Cbr>220C\u003Cbr>APC1 +9' -0\"\u003Cbr>APC1 +9' -0\"\u003Cbr>APC1 +9' -0\"\u003Cbr>L&CE OFFICE 3 215C\u003Cbr>APC1 +9' -0\"\u003Cbr>SI OFFICE 6 221-A\u003Cbr>CAB 221\u003Cbr>APC1 +12' - 8\"\u003Cbr>STOR 214A\u003Cbr>L&CE OFFICE 4 215B\u003Cbr>APC1 +9' -0\"\u003Cbr>MEDIUM\u003Cbr>COLLAB\u003Cbr>210A\u003Cbr>APC1 +10' - 0\"\u003Cbr>PATCH AND REPAIR AS NECESSARY.\u003Cbr>SGA\u003Cbr>SUITE\u003Cbr>APC1 +9' -0\"\u003Cbr>SGA OFFICE 2\u003Cbr>214C\u003Cbr>APC1 +9' -0\"\u003Cbr>L&CE GRADS 215A\u003Cbr>214\u003Cbr>APC1 +9' -0\"\u003Cbr>APC1 +9' -0\"\u003Cbr>L&CE SUITE 215\u003Cbr>GW B +8' -8\"\u003Cbr>a. BASE BID: DOORS SHALL NOT HAVE SIDE LITES AND TRANSOMS\u003Cbr>b. ALTERNATE BID: SIDE LITES AND TRANSOMS AT ALL DOORS AS INDICATEDON DOOR SCHEDULE\u003Cbr>a. BASE BID: NO ACOUSTIC CEILING (APC2) IN BREAK/RESOURCE 210A\u003Cbr>b. ALTERNATE BID: ACOUSTIC CEILING (APC2) IN BREAK/RESOURCE 210A ALTERNATE NO . 3-NEW SINK IN BREAK/ WORK ROOM 216\u003Cbr>a. BASE BID: NO NEW SINK IN BREAK/ WORK ROOM 216\u003Cbr>b. ALTERNATE BID: INSTALL SINK AT BREAK/ WORK ROOM 216 (SINGLE BOWL TO MATCH RESOURCE AREA), INCLUDE 48\"W SINK BASE CABINET IN LIEU OF\u003Cbr>(2) 24\" W CABINETS\u003Cbr>ALTERNATE NO . 4: OWNER PREFERRED ALTERNATE: PROVIDE OWNER PREFERRED CAMPUS STANDARD HARDWARE ALTERNATE AS SPECIFIED IN SECTION 08 71 00 “DOOR HARDWARE” AND AS FOLLOWS:\u003Cbr>1. LOCKS AND CYLINDERS: SCHLAGE.\u003Cbr>2. EXIT DEVICES: VON DUPRIN .\u003Cbr>3. DOOR CLOSERS: LCN .\u003Cbr>ALTERNATE NO . 5-VINYL WALL COVERING (VW C1 AND VW C2) AND VINYL FILM (VF1)\u003Cbr>a. BASE BID: NO VINYL WALL COVERING (VW C1 AND VW C2) IN RESOURCE 210 ON BULKHEAD AND NO VINYL FILM (VF1) ON DEMOUNTABLES (DEMOUNTABLES ARE IN FF&E SCOPE)\u003Cbr>b. ALTERNATE BID: VINYL WALL COVERING (VW C1 AND VW C2) IN RESOURCE\u003Cbr>210 ON BULKHEAD AND VINYL FILM (VF1) ON DEMOUNTABLES (DEMOUNTABLES ARE IN FF&E SCOPE)\u003Cbr>ALTERNATE NO . 6-CW T1 BACKSPLASH IN BREAK/WORK ROOM 216\u003Cbr>a. BASE BID: NO CWT1 BACKSPLASH IN BREAK/WORK ROOM 216\u003Cbr>b. ALTERNATE BID: CW T1 BACKSPLASH IN BREAK/WORK ROOM 216 ALTERNATE NO . 7-OWNER PREFERRED ALTERNATE: PROVIDE OWNER PREFERRED TILE CARPETING ALTERNATE AS SPECIFIED IN SECTION 09 68 13 'TILE CARPETING' AND AS FOLLOWS:\u003Cbr>1. TILE CARP","cbCaicomIuID6x0d","https://ap.wps.com/l/cbCaicomIuID6x0d","pdf",1240826,"English","# Ceiling Details and Assemblies\n## Suspended Metal Grid and APC/GWB Interfaces\n## Edge Moldings, Beads, and Finishing Notes\n# Room Areas and Layout References\n## Corridor and Offices\n## Resource/Break Areas\n# Bid Alternates and Compliance Notes\n## Base vs. Alternate Requirements\n## Coordination, Lighting, and MEP References","[{\"question\":\"What ceiling systems and materials are referenced in the ceiling details?\",\"answer\":\"The notes reference suspended metal grid systems with scheduled APC ceilings and sag-resistant GWB drywall, including flush/reveal conditions and transitions to wall molding.\"},{\"question\":\"What are the base bid vs. alternate bid themes mentioned?\",\"answer\":\"Alternates cover items such as acoustic ceiling inclusion/exclusion in specific break/resource areas, sink installation changes, vinyl wall covering and vinyl film changes, and specified material preferences.\"},{\"question\":\"How should conflicts or discrepancies be handled during bidding and construction?\",\"answer\":\"Any conflicts between stated dimensions or plans and discrepancies must be reported to the architect; issues not brought up at bid time become the GC’s responsibility, and coordination with electrical/mechanical drawings is required.\"}]","RCP Detail and Ceiling Plan Notes - A121 | PDF"]