[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649754-105":59,"doc-detail-649754-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","ravenswood-stage-3-d-consent-plans-issue-01-floor-plan-elevations","RAVENSWOOD STAGE 3 D - CONSENT PLANS / ISSUE 01 - Floor Plan - Elevations","","Ravenswood Stage 3 D consent plan set issue 01 covering site planning and building elevations, including floor plan sheet and elevations drawings. The content lists site and building areas, roof and coverage calculations, and consent-plan sheet details such as scale and copyright notices. Technical notes specify building envelope compliance requirements, electric hot water system readiness, hob and extraction fan flow rates, smoke alarm positioning, HWC fixing restraints, and wet-area waterproofing membrane extension above bath edges. Elevation schedules include cladding legends, window and glazing types, roof pitch, and envelope risk matrix calculations for north and west elevations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ravenswood-stage-3-d-consent-plans-issue-01-floor-plan-elevations/649754/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ravenswood-stage-3-d-consent-plans-issue-01-floor-plan-elevations/649754.png","ImageObject",300,407,{"name":92,"@type":93},"Quinn Holloway","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What key measurements and coverage figures are provided in the site planning section?","Question",{"text":112,"@type":113},"The document lists lot and DP identifiers, site area, area over framing and foundation, roof area over 600 mm, combined site coverage, and total site coverage percentage, alongside road level notes.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which NZBC-related compliance and building performance items are stated in the general notes?",{"text":117,"@type":113},"Notes include escape route compliance referencing table 3.2, conditions affecting external fire spread, smoke alarm placement within 3 m of each bedroom, and CA-rated downlights within the insulation envelope.",{"name":119,"@type":110,"acceptedAnswer":120},"What systems and installation requirements are specified for hot water, ventilation, and smoke alarms?",{"text":121,"@type":113},"The HWC note specifies a 300l hot water cylinder with seismic restraints and tempering valve set to 55°C, including strap and screw fixing details and safetray installation. Bathroom/ensuite extraction fan flow is at least 25 l/s, kitchen extraction at least 50 l/s (including ducting). Photoelectric smoke alarms with test and hush buttons are required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649754,1792806159,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},2336474466712,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","LEGAL DESCRIPTION:  \nLot:532  \nDP: 569585  \nSITE AREA:424 m2  \nAREA OVER FRAMING: 157.01 m2  \nAREA OVER FOUNDATION:164.55 m2 ROOF AREA OVER 600 MM:  \nCOMBINED SITE COVERAGE:169.36 m2  \nTOTAL SITE COVERAGE:39.9%  \nROAD  \n11.690 Crown of Road  \n11.630 Top of Kerb  \n11.730  \nPeg  \n11.920  \nPeg  \n[02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz](02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz)  \nRAVENSWOOD STAGE 3 D  \nCONSENT PLANS / ISSUE 01  \nSheet title: Site Plan  \nScale: 1: 100 @ A3  \n© Copyright the drawings remain the property of LMS drafting and design and may not be copied in any form or passed onto a third party without prior written approval  \nA 003   \n[02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz](02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz)  \nRAVENSWOOD STAGE 3 D  \nSheet title:  \nFloor Plan  \nScale: 1: 100 @ A3  \nA 004  \n© Copyright the drawings remain the property of LMS drafting and design and may not be copied in any form or passed onto a third party without prior written approval  \nGeneral Note:  \n-Electric Solar Ready 300l HWC  \n-Electric Hob  \nAntislip floor coverings on all access routes (both external and internal) , to comply with NZBC D 1/AS 1 Table 2 (except surface areas inside entries as dry areas)  \nAll down lights inside insulation envelope to be CA rated  \nBathroom / Ensuite to have an inline auto extraction fan to provide a flow rate of at least 25l/s. The kitchen extraction fan shall provide a rate of at least 50l/s (including associated ducting)  \nHWC Note:  \n300l Hot water cylinder cylinder with seismic restraintsand tempering valve set to 550c. HWC shall be secured to the wall framing using 3/25x 1mm Galv steel straps with 8mm coach screw with 30x2mm washers.Screws to penetrate framing a minimum of 50mm. Refer to supporting documents for more detail. Ensure a safetray is installed below the HWC as per the requirements of G 12 AS 1 NZBC section 5.2.3 page 24.  \nC/AS 1 Compliance:  \n-Escape routes comply with table 3.2 as they are less than 25m.  \n-External fire spread is not relevant to this project due to the separtion between the building and the boundary being over 1m and no eaves are being constructed within 650mm of the boundary.  \n-Smoke alarms are to be positioned within 3m of each bedroom as shown on the floor plan and lighting plan.  \nCEDAR ENTRY SLATS WITH STAIN FINISH  \n02   \nB012  \nInternal Loadbearing wall:  \nRefer to Truss manufacturer for all internal load bearing walls  \nWindow & Door Note:  \nRefer to window and door layout for positions  \nWARDROBE WARDROBE  \nBEDROOM 1  \nW. I. R  \nFraming Note: Raking entry soffit  \nStud height 2.420m  \nDouble top plate height 2.455m  \nAll dimensions to framing only , refer to drainage  \nplan for foundation dimensions  \nFlooring Legend  \nConcrete  \nCarpet  \nVinyl  \nLegend:  \nMB: Meter Box  \nWV: Water Valve  \nSB: Switch Board  \nDB: Data Board  \nHP: Heat Pump Unit  \nSD: Smoke Detector  \nSmoke Alarm Note: Photoelectric smoke alarms shall be installed and have test and hush buttons to comply with F7/AS 1  \nKitchen Note:  \nAll surface finishes to the kitchen joinery, walls , etc. to comply with the requirements of NZBC G3. Kitchen layout to be confirmed prior to construction refer to the kitchen plan provided by others  \nWet Area Waterproofing Notes:  \n-Baths shall have a waterproofing membrane extending at least 150 mm above and beyond the top of the side and ends of the bath  \n[02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz](02108232226 / luke@lmsdraftinganddesign.co.nz / www.lmsdraftinganddesign.co.nz)  \nRAVENSWOOD STAGE 3 D  \nCONSENT PLANS / ISSUE 01  \nSheet title:  \nElevations  \n© Copyright the drawings remain the property of LMS drafting and design and may not be copied in any form or passed onto a third party without prior written approval  \nB 012   \n\n| CLADDING LEGEND:\u003Cbr>01 VERTICAL CE","cbCaimHyKv0bte1Z","https://ap.wps.com/l/cbCaimHyKv0bte1Z","pdf",1023754,"English","# Site Plan\n## Elevations\n## Building Envelope Risk Matrix","[{\"question\":\"What key measurements and coverage figures are provided in the site planning section?\",\"answer\":\"The document lists lot and DP identifiers, site area, area over framing and foundation, roof area over 600 mm, combined site coverage, and total site coverage percentage, alongside road level notes.\"},{\"question\":\"Which NZBC-related compliance and building performance items are stated in the general notes?\",\"answer\":\"Notes include escape route compliance referencing table 3.2, conditions affecting external fire spread, smoke alarm placement within 3 m of each bedroom, and CA-rated downlights within the insulation envelope.\"},{\"question\":\"What systems and installation requirements are specified for hot water, ventilation, and smoke alarms?\",\"answer\":\"The HWC note specifies a 300l hot water cylinder with seismic restraints and tempering valve set to 55°C, including strap and screw fixing details and safetray installation. Bathroom/ensuite extraction fan flow is at least 25 l/s, kitchen extraction at least 50 l/s (including ducting). Photoelectric smoke alarms with test and hush buttons are required.\"}]","RAVENSWOOD STAGE 3 D - CONSENT PLANS / ISSUE 01 - Floor Plan - Elevations | PDF"]