[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662898-105":59,"doc-detail-662898-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","r5-wellbore-schematic-well-construction-and-abandonment-details","R5 Wellbore Schematic - Well Construction and Abandonment Details","","This document provides a technical template for detailing wellbore schematics, specifically focusing on the comparison between original well construction during operational phases and the subsequent plugging and abandonment construction procedures. It outlines critical structural components including surface casing, intermediate casing, and long string casing, while providing fields for specific depth measurements and cement intervals. The document serves as a standardized record for documenting open holes, perforation intervals, and formation data, ensuring comprehensive engineering oversight for well life-cycle management, particularly during decommissioning and final abandonment activities.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/r5-wellbore-schematic-well-construction-and-abandonment-details/662898/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/r5-wellbore-schematic-well-construction-and-abandonment-details/662898.png","ImageObject",300,407,{"name":92,"@type":93},"BigDaveOnline","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the two primary construction phases documented in this schematic?","Question",{"text":112,"@type":113},"The document covers the Original Well Construction during the operation phase and the subsequent Plugging and Abandonment construction phase.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What technical details are required for the plugging and abandonment section?",{"text":117,"@type":113},"It requires data on the top plug, USDW base plug, intermediate and long string cut/rip points, middle plug, bottom plug depths, and mechanical plug depths.",{"name":119,"@type":110,"acceptedAnswer":120},"How should open and perforated intervals be documented?",{"text":121,"@type":113},"They should be recorded in the designated table by specifying the type of interval (open hole, perforation, or varied casing), the start and end depths, and the corresponding formation name.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662898,1793223152,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},962090896214,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| ORIGINAL WELL CONSTRUCTION DURING OPERATION\u003Cbr>Surface |  |  |  |  |  |  |  |  |  |  | PLUGGING AND ABANDONMENT CONSTRUCTION\u003Cbr>Surface |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Top of cement |  |  |  |  |  |  |  |  |  | Surface Casing | Top Plug Interval\u003Cbr>*USDW Base Plug Interval\u003Cbr>*Intermediate Cut/Rip Point Plug Interval\u003Cbr>*Middle Plug Interval\u003Cbr>*Long String Cut/Rip Point Plug Interval\u003Cbr>Bottom Plug Depth\u003Cbr>\u003Cbr>*Mechanical Plug Depth\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Surface Casing\u003Cbr>\u003Cbr>*Intermediate Cut/Rip Depth\u003Cbr>\u003Cbr>*Long String Csg Cut/Rip Depth\u003Cbr>Long String Csg. Depth\u003Cbr>** Add Any Additional Information\u003Cbr>* May not Apply |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Top of cement |  |  |  |  |  |  |  |  | Intermediate Csg. |  |  |  |\n| Top of Cement\u003Cbr>Perforations Hole Size\u003Cbr>** Add Any Additional Information\u003Cbr>* May not Apply |  |  |  |  |  |  |  | Packer Depth\u003Cbr>Long String Csg. |  |  |  |  |\n|  |  |  |  | |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | * Depth |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n| LIST OF ALL OPEN AND/OR PERFORATED INTERVALS AND INTERVALS WHERE CASING WILL BE VARIED |  |  |  |  |  |  |  |  |  |  |  |  |\n| Specify Open Hole/ Perforations/ Varied Casing |  |  |  |  |  |  | From |  |  |  | To | Formation Name |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |","cbCaihdrKwDTwmIp","https://ap.wps.com/l/cbCaihdrKwDTwmIp","pdf",61607,"English","# Original Well Construction During Operation\n# Plugging and Abandonment Construction\n# List of Open and Perforated Intervals","[{\"question\":\"What are the two primary construction phases documented in this schematic?\",\"answer\":\"The document covers the Original Well Construction during the operation phase and the subsequent Plugging and Abandonment construction phase.\"},{\"question\":\"What technical details are required for the plugging and abandonment section?\",\"answer\":\"It requires data on the top plug, USDW base plug, intermediate and long string cut/rip points, middle plug, bottom plug depths, and mechanical plug depths.\"},{\"question\":\"How should open and perforated intervals be documented?\",\"answer\":\"They should be recorded in the designated table by specifying the type of interval (open hole, perforation, or varied casing), the start and end depths, and the corresponding formation name.\"}]","R5 Wellbore Schematic - Well Construction and Abandonment Details | PDF"]