[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-292375-105":59,"doc-detail-292375-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","quick-start-and-operations-manual-om-1164-3-rebel-commercial-packaged-rooftop-systems-model-dps","Quick Start and Operations Manual OM 1164-3 - Rebel Commercial Packaged Rooftop Systems Model DPS","","Quick Start and Operations Manual OM 1164-3 provides step-by-step procedures for starting and operating a Daikin Applied Rebel rooftop unit (Model DPS), emphasizing efficiency and safe commissioning. It directs users to read related manuals, perform unit inspection, confirm clearances and condensate drain installation, and verify field wiring and power conditions. The guide covers controller password access levels, main power setup, and DAT temperature control setup using a space sensor and related thermostat configuration options.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/quick-start-and-operations-manual-om-1164-3-rebel-commercial-packaged-rooftop-systems-model-dps/292375/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/quick-start-and-operations-manual-om-1164-3-rebel-commercial-packaged-rooftop-systems-model-dps/292375.png","ImageObject",300,407,{"name":92,"@type":93},"Lute","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-22","2026-09-17",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",17,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What should be checked before operating the rooftop unit?","Question",{"text":113,"@type":114},"Visually inspect the unit for damage, confirm location clearances, verify the condensate drain installation, and on VAV units confirm duct static pressure sensor tubing installation. Also confirm the discharge air sensor and that all field wiring is complete.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"How do password access levels affect controller menus?",{"text":118,"@type":114},"Without a password, only basic status items are accessible. Level 6 (5321) enables Alarm Lists, Quick Menu, and View/Set Unit menus. Level 4 (2526) adds Commission Unit, Manual Control, and Service menu groups, while Level 2 (6363) further adds the Unit Configuration menu.",{"name":120,"@type":111,"acceptedAnswer":121},"How is DAT temperature control set up with a space sensor?",{"text":122,"@type":114},"Use the Commission Unit menu and enter Htg/Clg ChgOvr Set Up. For space-based control, set Control Temp Source to Space. If using the space sensor to control thermostat settings, change Use Tstat Spt from No to Yes and apply the change, then allow the unit to cycle off to complete programming.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},292375,1789650555,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":130,"read_time":36},137454149569,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Quick Start and Operations Manual OM 1164-3  \nGroup: Applied Air Handling  \nPart Number: OM 1164  \nDate: July 2023  \nRebel® Commercial Packaged  \nRooftop Systems  \nModel DPS  \nThe following is a quick start guide for your new super-efficient Daikin Applied Rebel rooftop unit. Follow these step-by-step procedures for getting the rooftop unit started in the most efficient way. Read IM 1125 and OM 1141 before operating the unit and adhere to procedures/hazard identifications within the manuals. IM 1125’s warranty registration form includes initial start-up, fan, mechanical cooling, and heating start-up procedures that must be followed with this quick start guide. NOTE: Refrigerant pressures, subcooling, and superheat can be checked from the MicroTech® unit controller. Refrigerant gauges are not required when doing start-up. Schrader fittings are for evacuation and charging purposes only except it there is a problem that would require conformation of transducer readings.  \nOperational, Installation and Maintenance Resources (read before operation)  \n• Rebel Unit Installation Manual .............. IM 1125  \n• Rebel Unit Controller Discharge Air Control (VAV or CAV) .......................... OM 1141  \n• MicroTech® Unit Controller Options ........... IM 1244  \n• BACnet® & LonWorks® Integration .......... ED 15112  \n• Daikin Applied System Manager ............. IM 1253  \nUnit Inspection (perform before operation)  \n1. Visually inspect unit for damage outside and inside unit. Note any damage. Claims for freight damage must be filed by the consignee.  \n2. Confirm unit location meets ventilation and service clearance recommendations as stated in IM 1125 “Unit Clearances”.  \n3. Confirm unit condensate drain has been installed per IM 1125 “Unit Piping – Condensate Drain Connection”.  \n4. On VAV units, confirm that the duct static pressure sensor tubing and/or building static pressure tubing has been installed per IM 1125 “Installing Duct Static Pressure Taps”.  \n5. Confirm the discharge air sensor in the supply duct  \n6. Confirm all field wiring is complete.  \nNOTE: Remove power when making field connections.  \nDamage to the controller could result in making connections with the power applied.  \nQuick Start Guide  \nQuick Start Guide  \nMain Power Supply  \nSTEP 1  \nSTEP 2  \nConfirm that the electrical power wiring lugs are tight. Check for proper voltage as per submittaland the wiring diagram included with unit.  \nNOTE: Incoming power is not to exceed a voltage imbalance of 2%  \nUsing A Phase Sequencing Tester Confirm Power Source Or Sources If Multiple, Are All Phased Correctly For Clockwise Rotation.  \nPasswords  \nSTEP 3  \nVarious menu functions are accessible or inaccessible, depending on the access level of the user, and the password they enter, if any.  \nThere are four access levels, including no password, Level 2, Level 4, and Level 6, with Level 2 having the highest level of access. Without entering a password, the user has access only to basic status menu items. Entering the Level 6 password (5321) allows access to the Alarm Lists Menu, Quick Menu, and the View/Set Unit Menus group. Entering the Level 4 password (2526) allows similar access as Level 6 with the addition of the Commission Unit Menu, Manual Control, and Service Menu groups. Entering the Level 2 password (6363) allows similar access as Level 4 with the addition of the Unit Configuration Menu.  \nThe main password page is displayed when the keypad/display is first accessed the Home Key is pressed, the Back Key is pressed multiple times, or if the keypad/display has been idle longer than the Password Timeout (default 10 minutes) .The main password page provides access to enter a password, access the Quick Menu, view the current Unit State, access the alarm lists or view information about the unit. Alarms can be acknowledged without entering a password.  \nTemperature Controls Set Up / DAT Control with Space Temp  \nSTEP 4  \n.  \nSTEP 5  \nFor Rebel units 3 to 15 ton confirm th","cbCaidfIQpXTqmWz","https://ap.wps.com/l/cbCaidfIQpXTqmWz","pdf",1943719,16,"English","# Unit Inspection (perform before operation)\n## Quick Start Guide\n### Main Power Supply\n### Passwords\n## Temperature Controls Set Up","[{\"question\":\"What should be checked before operating the rooftop unit?\",\"answer\":\"Visually inspect the unit for damage, confirm location clearances, verify the condensate drain installation, and on VAV units confirm duct static pressure sensor tubing installation. Also confirm the discharge air sensor and that all field wiring is complete.\"},{\"question\":\"How do password access levels affect controller menus?\",\"answer\":\"Without a password, only basic status items are accessible. Level 6 (5321) enables Alarm Lists, Quick Menu, and View/Set Unit menus. Level 4 (2526) adds Commission Unit, Manual Control, and Service menu groups, while Level 2 (6363) further adds the Unit Configuration menu.\"},{\"question\":\"How is DAT temperature control set up with a space sensor?\",\"answer\":\"Use the Commission Unit menu and enter Htg/Clg ChgOvr Set Up. For space-based control, set Control Temp Source to Space. If using the space sensor to control thermostat settings, change Use Tstat Spt from No to Yes and apply the change, then allow the unit to cycle off to complete programming.\"}]","Quick Start and Operations Manual OM 1164-3 - Rebel Commercial Packaged Rooftop Systems Model DPS | PDF"]