[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648180-105":59,"doc-detail-648180-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","quick-cash-acashp-waternon-metered-model-6700-rfn-wiring-and-load-control-instructions","QUICK CASH AC/ASHP WATER/NON-METERED - Model #6700 RFN - Wiring and Load Control Instructions","","Wright-Hennepin Cooperative Electric Association provides wiring and operational instructions for a Quick Cash AC/ASHP water heater system model #6700 RFN under its Energy Savings Program. The guidance covers liability limits, use of a licensed electrical contractor, N.E.C. compliance and inspection requirements, and specific series wiring of control circuitry and phases to the A.C. unit and radio receiver. It also describes the placement of the load control switch, the association of indicator light states with load control, and how communicating thermostats should be handled for utility curtailment.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/quick-cash-acashp-waternon-metered-model-6700-rfn-wiring-and-load-control-instructions/648180/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/quick-cash-acashp-waternon-metered-model-6700-rfn-wiring-and-load-control-instructions/648180.png","ImageObject",300,407,{"name":92,"@type":93},"cksankcs","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who is responsible for wiring and installation outcomes under the Energy Savings Program?","Question",{"text":112,"@type":113},"Wright Hennepin Cooperative Electric Association disclaims responsibility for personal injury or property damage related to wiring or operation. Wright-Hennepin recommends using a licensed electrical contractor.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What wiring and inspection requirements must be met before Wright-Hennepin checks an installation?",{"text":117,"@type":113},"All wiring must meet the N.E.C. and be inspected by a state electrical inspector before Wright-Hennepin will check out the installation, credit KWH usage, or issue applicable rebates.",{"name":119,"@type":110,"acceptedAnswer":120},"How do the indicator light states relate to load control and water heater operation?",{"text":121,"@type":113},"A red light indicates a load is being controlled, and when the red light is on the water heaters are turned off and the load is off; a green light indicates power to the switch, and the system operation corresponds to these indicator conditions.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648180,1792792600,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81,"preview_page_count":4},3985747882755,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","# QUICK CASH AIR CONDITIONING ORASPH WITH QUICK CASH STORED WATERNON-METERED FOR EATON COOPERModel \\#6700 RFN\n\n1.Wright Hennepin Cooperative Electric Association willnot be responsibleor liable for any personal injury or property damage in the wiring ofor the operation of this or any Energy Savings Program.WrightHennepin recommends the use of a licensed electricalcontractor.  \n2.All wiring must meet N.E.C.(National Electrical Code)and beinspected by a state electrical inspector before WrightHennepin will check out installation,credit KWH usage orissue any applicable rebates.  \n3.The Energy Savings Program control circuitry is to be wired in serieswith the(Y)circuit to the A.C.unit outside.  \n4.Load Control Switch must be mounted outside of home and4'to 6'above the ground.  \n5.The(A)phase of water heater power s wired in series withthe orange wires of the radio receiver.  \n6.A red light indicates that a load is being controlled.  \n7.Water heater circuit powers radio receiver.  \n8.For control of systems with communicating thermostats,seemanufacturer instructions to control outdoor unit and programthermostat for utility curtailment.240 VOLT WATERHEATER POWER SUPPLYGREEN LIGHT INDICATES POWER TO SWITCH.GREEN LIGHT INDICATES POWER TO SWITCH.WATER STORAGE WHEN THE RED LIGHT IS ON THEWATER STORAGE WHEN THE RED LIGHT IS ON THEWATER HEATERS ARE TURNED OFFWATER HEATERS ARE TURNED OFFELECTRIC HEAT AND AIR CONDITIONING WHEN THEELECTRIC HEAT AND AIR CONDITIONING WHEN THERED LIGHT IS ON THE LOAD IS OFFRED LIGHT IS ON THE LOAD IS OFF  \n| Wright-Hennepin  \u003Cbr>Cooperative Electic Association  \u003Cbr>A Touchstone Energy'Cooperntive   | WRIGHT-HENNEPIN COOPERATIVE  \u003Cbr>ELECTRIC ASSOCIATION   |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  | ENERGY AND SERVICES DEPARTMENT  \u003Cbr>1-800-943-2667  \u003Cbr>QUICK CASH AC/ASHP WATER/NON-METERED   |  |  |  |  |\n| DATE  \u003Cbr>4/19/2024   | DWG BY:  \u003Cbr>TLG   | DWG NO.  \u003Cbr>LM4B   |  |  |  |\n| PROJECT NO.   |  |  |  |  |  |\n|  | SCALE N/A   |  | CHIKD BY:   | APPD BY:   | SHEET 1 OF 1   |","cbCaifOTPBcrMNhF","https://ap.wps.com/l/cbCaifOTPBcrMNhF","pdf",65451,"English","# QUICK CASH AC/ASHP WATER/NON-METERED - Model #6700 RFN\n## Wiring and electrical compliance\n## Load control switch placement and indicator lights","[{\"question\":\"Who is responsible for wiring and installation outcomes under the Energy Savings Program?\",\"answer\":\"Wright Hennepin Cooperative Electric Association disclaims responsibility for personal injury or property damage related to wiring or operation. Wright-Hennepin recommends using a licensed electrical contractor.\"},{\"question\":\"What wiring and inspection requirements must be met before Wright-Hennepin checks an installation?\",\"answer\":\"All wiring must meet the N.E.C. and be inspected by a state electrical inspector before Wright-Hennepin will check out the installation, credit KWH usage, or issue applicable rebates.\"},{\"question\":\"How do the indicator light states relate to load control and water heater operation?\",\"answer\":\"A red light indicates a load is being controlled, and when the red light is on the water heaters are turned off and the load is off; a green light indicates power to the switch, and the system operation corresponds to these indicator conditions.\"}]","QUICK CASH AC/ASHP WATER/NON-METERED - Model #6700 RFN - Wiring and Load Control Instructions | PDF"]