[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-344137-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-344137-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","queen-leask-street-sanitary-sewer-replacement-chippewa-creek-to-james-street","Queen-Leask Street Sanitary Sewer Replacement - Chippewa Creek to James Street","","This engineering drawing details the sanitary sewer replacement project for Queen and Leask Streets, spanning from Chippewa Creek to James Street in Sudbury. The document provides comprehensive technical specifications, including the profile of the road, underground utility alignments, and sanitary sewer invert elevations. It outlines critical construction guidelines, such as excavation protocols near existing water mains and service replacement requirements. Prepared by Northland Engineering Limited, the plan facilitates infrastructure upgrades by presenting horizontal and vertical alignments, alongside detailed notes on site management and material standards to ensure compliance with municipal infrastructure regulations.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/queen-leask-street-sanitary-sewer-replacement-chippewa-creek-to-james-street/344137/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/queen-leask-street-sanitary-sewer-replacement-chippewa-creek-to-james-street/344137.png","ImageObject",300,407,{"name":42,"@type":43},"Ivy","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-17","2026-09-22",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",16,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the scope of the sanitary sewer replacement project?","Question",{"text":63,"@type":64},"The project involves replacing the sanitary sewer on Queen Street and Leask Street, extending from Chippewa Creek to James Street in Sudbury.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the construction requirements for crossing existing water mains?",{"text":68,"@type":64},"When a sanitary sewer crosses a water main, it must be bedded with lean concrete for the full width of the water main trench, maintaining a minimum distance of 1m from the center line of the crossing.",{"name":70,"@type":61,"acceptedAnswer":71},"Who is the firm responsible for this engineering design?",{"text":72,"@type":64},"The engineering plan was produced by Northland Engineering Limited, Consulting Engineers and Planners, Sudbury.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},344137,1790578602,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":30,"preview_page_count":22,"preview_urls":145},549758252649,"https://ap-avatar.wpscdn.com/avatar/8000253669c5317157?_k=1778319167496531819","82  \n82  \nI:\\CAD\\PP Drawings\\Q-2.dwg, DWG To PDF. pc3","cbCairL5p5B2xHVS","https://ap.wps.com/l/cbCairL5p5B2xHVS","pdf",560791,"English","# Project Overview\n## Site Location and Scope\n# Engineering Specifications\n## Sanitary Sewer Profiles\n## Construction and Excavation Notes\n## Road and Paving Details","[{\"question\":\"What is the scope of the sanitary sewer replacement project?\",\"answer\":\"The project involves replacing the sanitary sewer on Queen Street and Leask Street, extending from Chippewa Creek to James Street in Sudbury.\"},{\"question\":\"What are the construction requirements for crossing existing water mains?\",\"answer\":\"When a sanitary sewer crosses a water main, it must be bedded with lean concrete for the full width of the water main trench, maintaining a minimum distance of 1m from the center line of the crossing.\"},{\"question\":\"Who is the firm responsible for this engineering design?\",\"answer\":\"The engineering plan was produced by Northland Engineering Limited, Consulting Engineers and Planners, Sudbury.\"}]","Queen-Leask Street Sanitary Sewer Replacement - Chippewa Creek to James Street | PDF",1790053100,[146],{"page_no":22,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/3a42a9726ed39a52c98b8c5a8bda83b9.webp",983,654]