[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-detail-651002-en":59,"doc-seo-651002-105":80},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":5,"data":60},{"doc_id":61,"user_id":62,"nickname":63,"user_avatar":64,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":66,"doc_content":67,"file_id":68,"file_url":69,"file_type":70,"file_size":71,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":72,"language_code":73,"site_id":74,"html_lang":73,"table_of_contents":75,"faqs":76,"seo_title":77,"seo_description":66,"update_tm":78,"read_time":79},651002,962085570644,"Melati","https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Pump Room - Ground Floor Plan, Elevations, Sections, Door Schedule - Scale 1:50","Pump Room construction documentation for Sedibeng TVET College - Heidelberg Campus (Heidelberg Extension 5). Includes ground floor plan, multiple elevations, sections, door schedule, electrical layout, roof plan, and details at specified scales. Provides detailed construction and structural notes covering compliance with SANS 10400 parts, waterproofing, DPC/DPM requirements, roofing assembly and truss spacing, drainage and plumbing provisions, ventilation and glazing safety glass, fire compliance, and general contractor verification and reporting requirements.","Scale 1:50  \n# PUMP ROOM-NORTH ELEVATION\n\nScale 1:50  \nROOF NOTE:  \nChromadek Roof sheeting fixed to timber intermediate purlins at MAX  \nmax.900mm dc on 38mmx114mm timber wall plate,  \nspecifications.colour:Charcoal Grey  \nROOF NOTE:  \n1200mm,on 38mmx114mm prefabricated trusses,trusses spaced at  \nmax.900mm clc on 38mmx 114mm timber wall plate  \nwith sisilation underlay.allin accordance with the manufacturers  \n# PUMP ROOM-WEST ELEVATION\n\nCONSTRUCTION NOTES:  \nSTRUCTURAL DESIGN:  \n1.ALL STRUCTURAL DESIGN TO COMPLYWITH SANS 10400 PART B.  \n2.ALL HANDRAILS TO COMPLYWITH SABS 0104.  \n4.ALL TIMBERBEAMS AND ROOF TRUSSES TO COMPLY WITH SABS0163.  \n1.ALLFOUNDATIONS TOCOMPLY WITH SANS 10400 PARTH AND SABS 0'61.  \n3.TOP OF CONCRETE FOUNDATIONTO BE MINIMUM 300mm BELOWN.G.L  \nWALLS:  \nALL WATERPROOFINGREQUIREMENTS TO COMPLY WITH SANS 10400 PARTSJ,KANDL  \n3.VERTICALDPC'S TO ALL CHANGES IN FL00RLEVEL.  \n4.SURFACE BEDS TO BEONAPPROVED WATERPROOFING FORMING A CONTINUOUS MEMBRANE WITH THE DPC UNDER  \nWALLS.  \n5.IMPERVIOUS COPINGS TO ALL PARAPETS.  \n6.375 MICRONDPC UNDERALL INSIDE AND OUTSIDE WALLS.  \n7.250 MICRONDPM UNDER AL.CONCRETE SURFACE BEDS.  \n8.APPROVED WATERPROOFING TOBASEMENT WALLS TO SPECIALST DETAILWITH 10-YEAR GUARANTEE.  \nCEILINGS,SLAES &SURFACE BEDS:  \n2.CEILINGS TO COMPLY WITH SANS 10400 PARTL.  \n3.SUSPEVDED PLASTERBOARD CEILINGS AND RAKED CEILINGS,SMOOTH PLASTERED TO BE INSTALLED UNDER ROOF  \nSTRUCTURES.  \n4.REINFORCED CONC.SURFACE BED TOENG.DESIGN&SPECIFICATION.  \n5.EXPANSION JOINTS TOENG.DESIGN &SPECIFICATION.  \n6.TLE GROUT JOINTS TO LINE UP WITH EXPANSION JOINTS  \n7.WHERE UNDERFLOOR HEATING SYSTEM IS TO BE INSTALLED,FLOORS TO COMPLY WITH SANS 1400 PARTXA.  \nROOF:  \n1.ROOF ASSEMBLY,ROOF COVERING,FASCIAS AND MATERIALS TO COMPLY WITH SANS 10400 PARTL AND SANS 10400  \nXA.  \n2.ALL CHIMNEYS AND CHIMNEY FLUES TO COMPLYWITH SANS 10400 PART V.  \n3.ALL STRUCTURALTIMEER DESIGN TOCOMPLY WITH STRUCTURAL ENGINEERS DESIGN &SPECIFICATION.  \n4.PURLIN CENTERSAND TIMBER SIZES TOBE SPECIFIED BY SPECIALISTAND TO COMPLY WITH PARTL OF SANS 10400.  \n5.ALL PARAPETS TO HAVE FLASHING &COUNTER FLASHING,TO COMPLY SANS 10400 PARTL.  \n6.FLAT RDOF AREAS-CONCRETE EAMS TO ENGINEERS DESIGNAND SPECIFICATION.  \n7.WATERPROOFING BY SPECIALISTS,TO COMPLY WITH SANS 10400 PARTL  \n8.SKYLICHTS BY SFECIALISTS,TO COMPLY WTH SANS 10400 PARTXA.  \nVENTILATION &GLAZING:  \n3.ALLFENESTRATION TO COMPLY WITH PARTXA OF SANS 10400.  \n4.SAFETY GLASS INALL DOORS AND WINDOWS WITH GLASS LOWER THAN 900mmABOVE F.F.L.AND SURFACE AREAS  \nLARGER THAN 1m2.SAFETY GLASS TO COMPLY WITH SANS 10400 PARTN.  \nDRAINAGE:  \n1.ALL DRAINAGE TO COMPLY WITH SANS 10400 PARTP.  \n4.ALLPLUMBING WORK TO BE CARRIED OUT BY LICENSED DRAINLAYERS &PLUMBERS.  \n5.DRAINS UNDER BUILDINGS TO BESTRAIGHT RUNS,ENCASED IN 100mm CONCRETE ALLAROUND WITHI.E'S AT EACHEND.  \n6.1.E'S TO ALL BENDS &JUNCTIONSTO BE EASILY ACCESSIBLE.  \n7.L.E'S TO HAVE CLEARLY MARKED GROUND COVERS.  \n8.RODDINGEYES TO BE PROVIDEDWHERE NECESSARY.  \n9.ALL SOIL PIPES TO BE 110mm ØUPVC DRAINS AND TO MININUM FALL OF 1:40.  \n10.TOP OF ANY DRANTOBE AT LEAST 300mm BELOW N.G.L.  \n11.ALLWASTE PIPES TOEE MINIMUM 50mmO INTERNAL  \n12.ALL WASTE FITTINGS TO HAVE DEEP\"P\"RESEALED TRAPS AND TO BEFULLY ACCESSIBLE FOR REPAIRS &CLEANING.  \n13.AMANHOLE TO BE PROVIDED WITHIN 1200mm OF STAND BOUNDARY.  \n14.SOILPPES HAVING VERTICAL DROPEXCEEDING 1200nm TO THE MAIN DRAIN TOBE ANTI-SYPHCNED.  \n15.GEYSERS TOBE SOLAR GEYSERS,POSITIONED TO ARCHITECTS SPECIFICATIONS AND TO BE INSTALLED BY  \nSPECIALIST.  \nWATER FEATURES AND SWIMMING POOL:  \nWATER FEATURES AND SWIMMING POOLTO COMPLY WITH SANS 10400 PART D.  \n2.SWIMMING POOL COVER TOCOMPLY WITH SANS 1390.  \n3.WATER FEATURES AND SWIMMINS POOLMAY CCMPLY WITH SANS 10134 INADDITIONTO SANS 10400 PARTD.  \n4.POOL TO BEBUILT ON GROUND STABILISED TO CORRECT COMPACTION.  \n5.ALL WATERPROOFING TO BE DONE BYSPECIALISTS.  \nFIRE:  \n1.BUILDING TO COMPLY WITHFIRE REGULATIONS AS STPULATED IN SANS 10400 PARTT.  \nGENERAL NOTES:  \n1.ALL WORK,PLANS AND","cbCairRX4nwA4iEl","https://ap.wps.com/l/cbCairRX4nwA4iEl","pdf",24788004,"English","en",105,"# Pump Room-North Elevation\n# Pump Room-West Elevation\n# Pump Room-Ground Floor Plan\n# Pump Room-Electrical Layout\n# Pump Room Roof Plan\n## Eave Detail","[{\"question\":\"What drawings and schedules are included for the pump room?\",\"answer\":\"The document includes a ground floor plan, elevations, sections, door schedule, electrical layout, and roof plan, with an eave detail shown at a smaller scale.\"},{\"question\":\"Which standards are referenced in the construction notes?\",\"answer\":\"Construction notes reference compliance with SANS 10400 (multiple parts) and related SABS/SANS requirements for handrails, timber beams and trusses, waterproofing, drainage, safety glass, and fire regulations.\"},{\"question\":\"What does the door schedule specify for the pump room entrance?\",\"answer\":\"The schedule lists a double swing door with frame and finish described as a double rebate steel frame door to be painted in layers according to SABS, including glazing and ironmongery as per specialist specification.\"}]","Pump Room - Ground Floor Plan, Elevations, Sections, Door Schedule - Scale 1:50 | PDF",1792856103,3,{"code":4,"msg":81,"data":82},"ok",{"site_id":74,"language":73,"slug":83,"title":65,"keywords":84,"description":66,"schema_data":85,"social_meta":138,"head_meta":140,"extra_data":142,"updated_unix":78},"pump-room-ground-floor-plan-elevations-sections-door-schedule-scale-150","",{"@graph":86,"@context":137},[87,100,120],{"@type":88,"itemListElement":89},"BreadcrumbList",[90,94,96,98],{"item":91,"name":92,"@type":93,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":95,"name":9,"@type":93,"position":14},"https://docshare.wps.com/document/",{"item":97,"name":40,"@type":93,"position":79},"https://docshare.wps.com/document/research-report/",{"item":99,"name":65,"@type":93,"position":19},"https://docshare.wps.com/document/pump-room-ground-floor-plan-elevations-sections-door-schedule-scale-150/651002/",{"url":99,"name":65,"@type":101,"image":102,"author":107,"headline":65,"publisher":109,"fileFormat":112,"inLanguage":73,"description":66,"dateModified":113,"datePublished":114,"encodingFormat":112,"isAccessibleForFree":115,"interactionStatistic":116},"DigitalDocument",{"url":103,"@type":104,"width":105,"height":106},"https://docshare.wps.com/thumbnails/pump-room-ground-floor-plan-elevations-sections-door-schedule-scale-150/651002.png","ImageObject",300,407,{"name":63,"@type":108},"Person",{"url":91,"name":110,"@type":111},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":117,"interactionType":118,"userInteractionCount":14},"InteractionCounter",{"@type":119},"ViewAction",{"@type":121,"mainEntity":122},"FAQPage",[123,129,133],{"name":124,"@type":125,"acceptedAnswer":126},"What drawings and schedules are included for the pump room?","Question",{"text":127,"@type":128},"The document includes a ground floor plan, elevations, sections, door schedule, electrical layout, and roof plan, with an eave detail shown at a smaller scale.","Answer",{"name":130,"@type":125,"acceptedAnswer":131},"Which standards are referenced in the construction notes?",{"text":132,"@type":128},"Construction notes reference compliance with SANS 10400 (multiple parts) and related SABS/SANS requirements for handrails, timber beams and trusses, waterproofing, drainage, safety glass, and fire regulations.",{"name":134,"@type":125,"acceptedAnswer":135},"What does the door schedule specify for the pump room entrance?",{"text":136,"@type":128},"The schedule lists a double swing door with frame and finish described as a double rebate steel frame door to be painted in layers according to SABS, including glazing and ironmongery as per specialist specification.","https://schema.org",{"og:url":99,"og:type":139,"og:title":65,"og:site_name":110,"og:description":66},"article",{"robots":141,"canonical":99},"index,follow",{"doc_id":61,"site_id":74}]