[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-113459-en":3,"doc-seo-113459-105":29,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},113459,962075114101,"Seraphina","https://ap-avatar.wpscdn.com/avatar/e000253a75eb197efd?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780044092746381165",8,"Research & Report","Public-Private Partnerships in Urban Bus Systems - An Analytical Framework for Project Identification and Preparation","A World Bank analytical framework for identifying and preparing public-private partnership (PPP) projects in urban bus systems, with a focus on structuring decisions across the PPP project cycle. The work outlines key messages, rationale, document structure, and methodology, then organizes content into initial considerations, stakeholder objectives, alternative mobility improvements without PPPs, and minimum requirements. It also introduces risk management through a risk matrix approach, supporting practical project assessment and preparation.","Public-Private Partnershipsin Urban Bus Systems  \nAn Analytical Framework for Project Identification and Preparation  \nAlejandro Hoyos Guerrero and Abel Lopez Dodero  \nINTERNATIONAL DEVELOPMENT IN FOCUS  \nPublic-Private Partnerships in Urban Bus Systems  \nAn Analytical Framework for Project Identification and Preparation  \nALEJANDRO HOYOS GUERRERO AND ABEL LOPEZ DODERO  \n© 2021 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433  \nTelephone: 202-473-1000; [Internet: www.worldbank.org](Internet: www.worldbank.org)[ ](Internet: www.worldbank.org)Some rights reserved  \n1 2 3 4 24 23 22 21  \nBooks in this series are published to communicate the results of World Bank research, analysis, and operational experience with the least possible delay. The extent of language editing varies from book to book.  \nThis work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy, completeness, or currency of the data included in this work and does not assume responsibility for any errors, omissions, or discrepancies in the information, or liability with respect to the use of or failure to use the information, methods, processes, or conclusions set forth. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries.  \nNothing herein shall constitute, imply, or be considered tobe a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved.  \nRights and Permissions  \nThis work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) [http://](http://)[ ](http://)[creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license](creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license), you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions:  \nAttribution—Please cite the work as follows: Hoyos Guerrero, Alejandro, and Abel Lopez Dodero. 2021. Public-Private Partnerships in Urban Bus Systems: An Analytical Framework for Project Identification and Preparation. International Development in Focus. Washington, DC: World Bank. doi:10.1596/  \n978-1-4648-1682-6. License: Creative Commons Attribution CC BY 3.0 IGO  \nTranslations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by The World Bank and should not be considered an official World Bank translation. The World Bank shall not be liable for any content or error in this translation.  \nAdaptations—If you create an adaptation of this work, please add the following disclaimer along with the attribution: This is an adaptation of an original work by The World Bank. Views and opinions expressed in the adaptation are the sole responsibility of the author or authors of the adaptation and are not endorsed by The World Bank.  \nThird-party content—The World Bank does not necessarily own each component of the content contained within the work. The World Bank therefore does not warrant that the use of any thirdparty-owned individual component or part contained in the work will not infringe on the rights of those third parties. The risk of claims resulting from such infringement rests solely with you. If you wish to re-use a component of the work, it is your responsibility to determine whether permission is needed for that re-use and to obtain permission from the copyright owner. Examples of components can include, but are no","cbCaihJgJynwy852","https://ap.wps.com/l/cbCaihJgJynwy852","pdf",3989043,1,195,"English","en",105,"# Overview and Key Messages\n## Rationale\n## Structure\n## Methodology\n## How to Use This Document\n## Key Messages\n## Notes\n## References\n# Part I Initial Considerations\n## Chapter 1 The Challenges of Private Sector Participation in Urban Bus Systems\n## Chapter 2 Project Stakeholders and Objectives\n## Chapter 3 Alternative Ways to Improve Urban Mobility without a Public-Private Partnership\n## Chapter 4 Minimum Requirements to Consider for a Public-Private Partnership\n# Part II The Risk Matrix\n## Chapter 5 Managing Risk Using","[{\"question\":\"What is the document’s purpose for urban bus PPP projects?\",\"answer\":\"It provides an analytical framework to support the identification and preparation of public-private partnership projects in urban bus systems.\"},{\"question\":\"How is the document structured to guide readers through PPP preparation?\",\"answer\":\"It moves from overview and key messages into initial considerations, then stakeholder and alternatives, minimum requirements, and finally a risk-matrix section for managing risk.\"},{\"question\":\"What topics are covered regarding challenges and minimum requirements for PPPs?\",\"answer\":\"The text addresses challenges of private sector participation in urban bus systems and specifies technical, fiscal capacity, and institutional/regulatory minimum requirements to consider.\"}]",1784504644,491,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":27},"public-private-partnerships-in-urban-bus-systems-an-analytical-framework-for-project-identification-and-preparation","",{"@graph":35,"@context":85},[36,53,68],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/public-private-partnerships-in-urban-bus-systems-an-analytical-framework-for-project-identification-and-preparation/113459/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-20","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What is the document’s purpose for urban bus PPP projects?","Question",{"text":75,"@type":76},"It provides an analytical framework to support the identification and preparation of public-private partnership projects in urban bus systems.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"How is the document structured to guide readers through PPP preparation?",{"text":80,"@type":76},"It moves from overview and key messages into initial considerations, then stakeholder and alternatives, minimum requirements, and finally a risk-matrix section for managing risk.",{"name":82,"@type":73,"acceptedAnswer":83},"What topics are covered regarding challenges and minimum requirements for PPPs?",{"text":84,"@type":76},"The text addresses challenges of private sector participation in urban bus systems and specifies technical, fiscal capacity, and institutional/regulatory minimum requirements to consider.","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,97,101,105,110,115,120,123,128,131,135],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":45,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":45,"category_name":112,"show_sort_weight":113,"slug":114},6,"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":45,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":45,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":45,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":45,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":45,"category_name":137,"show_sort_weight":106,"slug":138},19,"General","general"]