[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664749-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664749-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","proposed-subdivision-of-lot-122-dp874949-stage-1-proposed-subdivision-plan","Proposed Subdivision of Lot 122 DP874949 - Stage 1 - Proposed Subdivision Plan","","Proposed subdivision survey drawings for multiple lots, including Stage 1 for Lot 122 DP874949 (and other referenced lots), and Stage 2&3 for Lot 20 DP262325. The plan specifies existing rights of carriageway, rights of access, easements for services, easements for drainage of water, and easements for support, with varying widths and some height limitations. It is subject to final certifier approval and registration requirements, includes boundary and easement amendments, and provides surveying reference details and bearing/distance and coordinate information.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/proposed-subdivision-of-lot-122-dp874949-stage-1-proposed-subdivision-plan/664749/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/proposed-subdivision-of-lot-122-dp874949-stage-1-proposed-subdivision-plan/664749.png","ImageObject",300,407,{"name":42,"@type":43},"Genevieve","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the main purpose of the plan?","Question",{"text":62,"@type":63},"The plan proposes subdivision works for the referenced lots and defines the associated boundaries and easements, subject to final approval and registration requirements.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which easement types are specified in the drawing?",{"text":67,"@type":63},"It specifies easements for services, easement for drainage of water, and easement for support, along with rights of access and existing rights of carriageway.",{"name":69,"@type":60,"acceptedAnswer":70},"Are the subdivision details final upon issue of the plan?",{"text":71,"@type":63},"No. The subdivision is subject to final certifier approval, requirements of other authorities, and registration at L.P.I.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664749,1793271434,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":96},1374391974585,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","STAGE 1  \n# PROPOSED SUBDIVISION OF LOT 122 DP874949,LOT 2 DP581473,LOT6 DP1015754 ANDLOTS 71 AND 74 IN DP1119950\n\nSTAGE 2&3PROPOSED SUBDIVISION OF LOT 20 DP262325  \n## (A)EXISTING RIGHT OF CARRIAGEWAY 15 WIDE&VARIABLE WIDTH(DP874949)\n\nNOTE:  \n(B)RIGHT OF ACCESS 10 WIDE,15 WIDE AND VARIABLE WIDTH(PARTLY LIMITED INHEIGHT)  \n## (C)EASEMENT FOR SERVICES 10 WIDE,15 WIDE AND VARIABLE WIDTH(PARTLY LIMITED IN HEIGHT)\n\nTHIS SUBDIVISION SUBJECT TO FINALCERTIFIER APPROVAL AND REQUIREMENTSOF ANY OTHER AUTHORITIES ANDREGISTRATION AT L.P.I.  \n(D)RIGHT OF ACCESS 22 WIDE AND VARIABLE WIDTH  \n(E)EASEMENT FOR SERVICES 22 WIDE AND VARIABLE WIDTH  \n(F)RIGHT OF ACCESS 20 WIDE AND VARIABLE WIDTH  \nDO NOT SCALE FROM THIS PLAN TO  \nSET OUT ANY BOUNDARIES.  \n(G)EASEMENT FOR SERVICES 20 WIDE AND VARIABLE WIDTH  \n(H)EASEMENT FOR DRAINAGE OF WATER VARIABLE WIDTH  \n(J)EASEMENT FOR SUPPORT 5 WIDE  \n9.11.07  \nB0UNDARIES AND EASEMENTS AMENDED  \n3  \nLMB  \nKAA  \n\n| 7.1.07  \u003Cbr>5.1.07  \u003Cbr>1  \u003Cbr>5.1.07  \u003Cbr>0   | BOUNDARIES AND EASEMENTS AMENDED  \u003Cbr>EASEMENTS ADDED  \u003Cbr>ORIGINAL SSUE   | GBT  \u003Cbr>LMB  \u003Cbr>KAA  \u003Cbr>GBT  \u003Cbr>LMB  \u003Cbr>KAA  \u003Cbr>GBT  \u003Cbr>KAA  \u003Cbr>LMB  \u003Cbr>GBT   |  | Connell Wagner  \u003Cbr>Connell Wogner Pty Ltd ABN 54005139873  \u003Cbr>Telephone:+61294655599  \u003Cbr>Focsmile:+61294655598  \u003Cbr>116 Mitory Rood(PO Box 538)Neutral Boy  \u003Cbr>Nea South Woles 2089 Australia  \u003Cbr>Emol:casyd@conwog com   | Surveyor:  \u003Cbr>PAUL JOHN STIVANO  \u003Cbr>Date of Survey:  \u003Cbr>Surveyor's Reference:HW43.01.03.00   | STAGE1  \u003Cbr>PROPOSED SUBDIVISION OF LOT 122 DP874949,  \u003Cbr>LOT 2 DP581473,LOT6 DP1015754 AND  \u003Cbr>LOTS 71 AND 74 IN DP1119950  \u003Cbr>STAGE 2&3  \u003Cbr>PROPOSED SUBDIVISION OF LOT 20 DP262325   | NEWCASTLE  \u003Cbr>LGA:  \u003Cbr>Locality:  \u003Cbr>KOORAGANG ISLAND   | Registered   | DP   |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| 31.10.07  \u003Cbr>B   | DRAFT ISSUE   |  |  |  |  |  | Rev:3  \u003Cbr>Drawing No:  \u003Cbr>VS007   |  |  |\n| 29.10.07  \u003Cbr>A  \u003Cbr>Rev.  \u003Cbr>Date   | DRAFT ISSUE  \u003Cbr>Revision Details   | By  \u003Cbr>Ver.   | App.   | A person using 〔oell Megner trawings and other dato acepts the risk of:  \u003Cbr>1.using fhe droins en other datdin electraenit forn wifhaut reuesting and checking them fer  \u003Cbr>2.Gsling ie rowinys or ther ceofo for an prese nof ayre fo in rning y cnmneii wognar.   |  |  | Lengths are in metres.Reduction Ratio 1:12500  \u003Cbr>(at A2 size)   |  |  |\n\n100  \n110  \n120  \n130  \n140  \n150  \n60  \n70  \n80  \n90  \n10  \n20  \n30  \n40  \n50  \n|  | BY SURVEY   | MGA GROUND   |\n| --- | --- | --- |\n| LINE   | BEARING DISTANCE   | BEARING DISTANCE   |\n| 1   | 53°43'03”1546.924   | 53°43'13”1546.900   |\n| 2   | 143°34'12\"456.165   | 143°34'15”456.191   |\n| 3   | 3°07'56”566.855   | -   |\n| 4   | 6°29'57”584.4   | 6°30'09”584.385   |\n| 5   | 292°50'06”1541.581   | 292°50'16”  1541.607   |\n| 6   | 97°10'20”495.740   | 97°10'22”495.776   |\n| 7   | 148°42'45”361.69   | 148°43'14”361.651   |\n| 8   | 74°39'15”736.945   | 74°39'17”736.919   |\n| 9   | 109°40'10”632.795   | 109°40'16”632.821   |\n| 10   | 190°33'57”440.181   |  |\n| 11   | 92°48'58\"478.56   |  |\n| 12   | 259°19'23”828.334   |  |\n| 13   | 95°28'20”873.08   | 95°28'26”873.05   |\n| 14   | 185°44'53”   | 185°44'53\"   |\n| 15   | 1046.772  \u003Cbr>130°07'05”   | 130°07'06\"  1046.756   |\n| 16   | 29°52'03”696.695   | -   |\n| 17   | 302°53'40”404.18   | -   |\n| 18   | 304°52'42”650.675   | 304°52'50”650.655   |\n| 19   | 122°29'20”628.545   | 122°29'18”628.535   |\n| 20   | 303°54'58”381.983   | -   |\n| 21   | 295°31'10”636.94   | -   |\n| 22   | 312°15'30\"555.96   |  |\n| 23   | 296°21'25”  459.14   |  |\n| 24   | 92.93  \u003Cbr>259°30'   |  |\n| 25   | 113°32'50”550.38   |  |\n| 26   | 63°50'49”  946.65   | -   |\n| 27   | 109°46'07\"425.395   | -   |\n| 28   | 250°19'1013.16   | -   |\n\n\n| SURVEYING REGULATION 2006,CLAUSE 35(1)(B)AND CLAUSE 61(2)   |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| MARK   | M.G.A.C0-0RDINATES   |  | ZONE   | CLASS   | ORDER   | R.L.   | CLASS   | ORD","cbCaiebgtlxpuf5C","https://ap.wps.com/l/cbCaiebgtlxpuf5C","pdf",372795,"English","# Stage 1\n## Proposed subdivision of Lot 122 DP874949\n# Stage 2&3\n## Proposed subdivision of Lot 20 DP262325\n## Existing right of carriageway\n## Right of access and easements for services\n## Right of access and easements for drainage and support\n## Surveying notes and surveying regulation references","[{\"question\":\"What is the main purpose of the plan?\",\"answer\":\"The plan proposes subdivision works for the referenced lots and defines the associated boundaries and easements, subject to final approval and registration requirements.\"},{\"question\":\"Which easement types are specified in the drawing?\",\"answer\":\"It specifies easements for services, easement for drainage of water, and easement for support, along with rights of access and existing rights of carriageway.\"},{\"question\":\"Are the subdivision details final upon issue of the plan?\",\"answer\":\"No. The subdivision is subject to final certifier approval, requirements of other authorities, and registration at L.P.I.\"}]","Proposed Subdivision of Lot 122 DP874949 - Stage 1 - Proposed Subdivision Plan | PDF"]