[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649337-105":59,"doc-detail-649337-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","proposed-olympic-size-swimming-pool-and-associated-works-architectural-drawing-arch-02-site-plan-general-notes","PROPOSED OLYMPIC SIZE SWIMMING POOL AND ASSOCIATED WORKS - Architectural Drawing - ARCH 02 - Site plan & general notes","","Architectural drawing set for the proposed Olympic size swimming pool and associated works, prepared for Masinde Muliro University of Science and Technology, with job identification ARCH 02 and scale 1:100 dated JAN 2020. The plan elements include swimming pool geometry with diving boards, vertical ladder access, service spaces such as pump house, electro therapy area, jacuzzi office, canteen, and designated VIP toilets. General notes specify dimensions in millimeters, non-scaling of drawings, contractor verification onsite, PV permanent vents, structural concrete compliance, foundation depth determination, and plumbing drainage to meet M.O.H. requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/proposed-olympic-size-swimming-pool-and-associated-works-architectural-drawing-arch-02-site-plan-general-notes/649337/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/proposed-olympic-size-swimming-pool-and-associated-works-architectural-drawing-arch-02-site-plan-general-notes/649337.png","ImageObject",300,407,{"name":92,"@type":93},"asba","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project and drawing identifiers are listed on ARCH 02?","Question",{"text":112,"@type":113},"The drawing lists the project as “PROPOSED OLYMPIC SIZE SWIMMING POOL AND ASSOCIATED WORKS” and identifies the sheet as “ARCH 02” with scale 1:100 and date JAN 2020.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are dimensions and drawings intended to be used?",{"text":117,"@type":113},"All dimensions are shown in mm unless otherwise specified, drawings are not to be scaled, and only figured dimensions should be used.",{"name":119,"@type":110,"acceptedAnswer":120},"What general requirements are stated for construction and services?",{"text":121,"@type":113},"The contractor must verify dimensions onsite, reinforced concrete works must follow structural engineer details, foundation depth and plinth level are to be determined on site, and plumbing, water reticulation, and drainage must be left clean and in working order to the satisfaction of M.O.H.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649337,1792799247,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},3985747872567,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","| \u003Cbr>120,000\u003Cbr>50,000 20,000 Boundary Wall to Pedestran Gate 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000\u003Cbr>detail\u003Cbr>4,000\u003Cbr>FLOOR PLAN (External Toileta)\u003Cbr>CANTEEN\u003Cbr>Wall to detail\u003Cbr>Pump House\u003Cbr>Tank.\u003Cbr>4,000\u003Cbr>20,000\u003Cbr>Vertical ladder\u003Cbr>GENTS\u003Cbr>5,000 25,000\u003Cbr>OFFICE Jacuzzi\u003Cbr>8,000\u003Cbr>ELECTRO THERAPY POOL\u003Cbr>Vertical ladder Vertical ladder Vertical ladder\u003Cbr>DIVING\u003Cbr>BOARD\u003Cbr>Parking -3M deep -1.5M deep -1M deep\u003Cbr>DIVING\u003Cbr>BOARD\u003Cbr>SWIMING POOL Vertical ladder\u003Cbr>3,000\u003Cbr>Vertical ladder Vertical ladder\u003Cbr>50,000\u003Cbr>Gate House\u003Cbr>VIP. TOILETS\u003Cbr>5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000\u003Cbr>SITE PLAN SCALE: 1: 500\u003Cbr>USER DEPARTMENT DATE:\u003Cbr>Name:\u003Cbr>REVISIONS\u003Cbr>Signature:\u003Cbr>REV: DATE: DESCRIPTION\u003Cbr>SCALE:\u003Cbr>1:100\u003Cbr>Date:\u003Cbr>MASINDE MULIRO UNIVERSITY OF SCIENCE AND TECHNOLOGY\u003Cbr>P. O BOX 190-50100\u003Cbr>KAKAMEGA\u003Cbr>Project:\u003Cbr>PROPOSED OLYMPIC SIZE SWIMMING POOL AND ASSOCIATED WORKS\u003Cbr>Title:\u003Cbr>ARCHITECTURAL DRAWING\u003Cbr>Designed by:\u003Cbr>Drawn by:\u003Cbr>Checked by:\u003Cbr>Dr. M M Mukolwe\u003Cbr>Oluchiri L A\u003Cbr>Eng. M K Mukangula\u003Cbr>JOB No:\u003Cbr>ARCH 01\u003Cbr>Scale:\u003Cbr>Date:\u003Cbr>1:100\u003Cbr>JAN 2020\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>A\u003Cbr>\u003Cbr>A\u003Cbr>\u003Cbr>B\u003Cbr>\u003Cbr>B\u003Cbr>\u003Cbr>C\u003Cbr>\u003Cbr>C\u003Cbr>\u003Cbr>D\u003Cbr>\u003Cbr>D\u003Cbr>\u003Cbr>E\u003Cbr>\u003Cbr>F\u003Cbr>\u003Cbr>G\u003Cbr>\u003Cbr>G\u003Cbr>\u003Cbr>H\u003Cbr>\u003Cbr>H\u003Cbr>\u003Cbr>I\u003Cbr>\u003Cbr>I\u003Cbr>\u003Cbr>J\u003Cbr>\u003Cbr>J\u003Cbr>\u003Cbr>K\u003Cbr>\u003Cbr>K\u003Cbr>\u003Cbr>1\u003Cbr>\u003Cbr>1\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>3\u003Cbr>\u003Cbr>3\u003Cbr>\u003Cbr>4\u003Cbr>\u003Cbr>4\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>6\u003Cbr>\u003Cbr>6\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>50,000\u003Cbr>2\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>\u003Cbr>LADIES\u003Cbr>10,000\u003Cbr>9,000\u003Cbr>1\u003Cbr>3,000\u003Cbr>4,000\u003Cbr>45,000\u003Cbr>45,000\u003Cbr>25,000\u003Cbr>3,000 4,000\u003Cbr>4,000\u003Cbr>5,000\u003Cbr>4,000\u003Cbr>25,000\u003Cbr>10,000\u003Cbr>KAKAMEGA WEBUYE ROAD\u003Cbr>1 |  |  |  |\n| --- | --- | --- | --- |\n|  |  |  |  |\n\n\n| \u003Cbr>\u003Cbr>\u003Cbr>120,000\u003Cbr>50,000 20,000\u003Cbr>l to\u003Cbr>Pedestran Gate\u003Cbr>CANTEEN\u003Cbr>to detail\u003Cbr>5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>LADIES\u003Cbr>whb\u003Cbr>sh\u003Cbr>Lokers Lokers Lokers\u003Cbr>LADIES\u003Cbr>sh\u003Cbr>sh\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>wc\u003Cbr>whb whb\u003Cbr>GENTS\u003Cbr>8,000\u003Cbr>Changing Room\u003Cbr>Lokers Lokers\u003Cbr>150\u003Cbr>150 3,050 150 3,451 150 1,300\u003Cbr>150\u003Cbr>1,600 150 3,000 150 1,700 150 150 4,850 150 3,550 150 1,400 1,600 150\u003Cbr>Tank.\u003Cbr>20,000 Vertical ladder\u003Cbr>10,000\u003Cbr>5,000 Vertical ladder\u003Cbr>5,000 25,000\u003Cbr>10,000\u003Cbr>Vertical ladder\u003Cbr>DIVING\u003Cbr>BOARD\u003Cbr>04 -3M deep -1.5M deep -1M deep 03\u003Cbr>DIVING\u003Cbr>BOARD\u003Cbr>SWIMING POOL\u003Cbr>Vertical ladder\u003Cbr>Vertical ladder Vertical ladder\u003Cbr>50,000\u003Cbr>VIP. TOILETS\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>E\u003Cbr>\u003Cbr>\u003Cbr>sh\u003Cbr>\u003Cbr>sh\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>02\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>whb\u003Cbr>\u003Cbr>\u003Cbr>A\u003Cbr>\u003Cbr>A\u003Cbr>\u003Cbr>B\u003Cbr>\u003Cbr>B\u003Cbr>\u003Cbr>C\u003Cbr>\u003Cbr>C\u003Cbr>\u003Cbr>D\u003Cbr>\u003Cbr>D\u003Cbr>\u003Cbr>F\u003Cbr>\u003Cbr>G\u003Cbr>\u003Cbr>G\u003Cbr>\u003Cbr>H\u003Cbr>\u003Cbr>H\u003Cbr>\u003Cbr>I\u003Cbr>\u003Cbr>I\u003Cbr>\u003Cbr>J\u003Cbr>\u003Cbr>J\u003Cbr>\u003Cbr>K\u003Cbr>\u003Cbr>K\u003Cbr>\u003Cbr>1\u003Cbr>\u003Cbr>1\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>3\u003Cbr>\u003Cbr>3\u003Cbr>\u003Cbr>4\u003Cbr>\u003Cbr>4\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>5\u003Cbr>\u003Cbr>6\u003Cbr>\u003Cbr>6\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>7\u003Cbr>\u003Cbr>Lokers\u003Cbr>\u003Cbr>whb\u003Cbr>\u003Cbr>sh\u003Cbr>\u003Cbr>sh\u003Cbr>\u003Cbr>sh\u003Cbr>\u003Cbr>sh\u003Cbr>ELECTRO THERAPY ROOM\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>2\u003Cbr>\u003Cbr>\u003Cbr>Jacuzzi\u003Cbr>\u003Cbr>OFFICE\u003Cbr>\u003Cbr>Pump House\u003Cbr>950 150\u003Cbr>1\u003Cbr>10,000\u003Cbr>150 950 950\u003Cbr>150\u003Cbr>150\u003Cbr>5,000\u003Cbr>3,000\u003Cbr>10,000\u003Cbr>E-19\u003Cbr>E-\u003Cbr>45,000\u003Cbr>25,000\u003Cbr>25,000\u003Cbr>3,000 3,000\u003Cbr>4,000\u003Cbr>1\u003Cbr>~~01~~\u003Cbr> E-18\u003Cbr>\u003Cbr>| NOTES |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n|  | GERERAL\u003Cbr>1. All dimensions are shown in mm unless otherwise specified , Drawing are not to be scaled , only figured dimensions to be used .\u003Cbr>2. The contractor must check and verify all dimensions onsite before commencement on any work in caseofany discrepancy refer to the architect immediately .\u003Cbr>3. PV denotes permanent vents over door and windows as marked on plan\u003Cbr>4. All R.C ( reinforced concrete) works must be carried out as per Structural Engineer's details.\u003Cbr>5. Depth of foundation and plinth level to be determined on site.\u003Cbr>6. All Plumbing, Water reticulation and drainage tobe left clean and in working order tothe entire to satisfaction of M.O.H. |  |  |  |  |\n|  | REVISIONS |  |  |  |  |\n|  | REV: | DATE: | ","cbCaipZSlVuqSRmG","https://ap.wps.com/l/cbCaipZSlVuqSRmG","pdf",1384948,"English","# Architectural Drawing Set\n## Project Information and Personnel\n## Scale and Date\n## Site Plan Elements\n## General Notes and Revisions","[{\"question\":\"What project and drawing identifiers are listed on ARCH 02?\",\"answer\":\"The drawing lists the project as “PROPOSED OLYMPIC SIZE SWIMMING POOL AND ASSOCIATED WORKS” and identifies the sheet as “ARCH 02” with scale 1:100 and date JAN 2020.\"},{\"question\":\"How are dimensions and drawings intended to be used?\",\"answer\":\"All dimensions are shown in mm unless otherwise specified, drawings are not to be scaled, and only figured dimensions should be used.\"},{\"question\":\"What general requirements are stated for construction and services?\",\"answer\":\"The contractor must verify dimensions onsite, reinforced concrete works must follow structural engineer details, foundation depth and plinth level are to be determined on site, and plumbing, water reticulation, and drainage must be left clean and in working order to the satisfaction of M.O.H.\"}]","PROPOSED OLYMPIC SIZE SWIMMING POOL AND ASSOCIATED WORKS - Architectural Drawing - ARCH 02 - Site plan & general notes | PDF",13]