[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649121-105":59,"doc-detail-649121-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","proposed-new-residence-working-drawings-general-notes","Proposed New Residence - Working Drawings - General Notes","","Working drawings checklist for a proposed new residence, listing required drawing sheets and key construction notes for compliance. Includes site plan, floor plans, elevations, sections/details, slab layout, electrical, bracing, and landscaping. General notes cover building-code and Australian-standards compliance, verification of dimensions, kitchen and wet-area provisions, stair riser/goings limits, smoke detector indication, drainage and stormwater requirements, and contractor responsibility for boundary clearances. Additional construction notes specify roof, ceiling, joinery, termite management, wall systems, linings, flashing, roof bracing, gutters/downpipes, and smoke alarm installation.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/proposed-new-residence-working-drawings-general-notes/649121/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/proposed-new-residence-working-drawings-general-notes/649121.png","ImageObject",300,407,{"name":92,"@type":93},"PakDamar76","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What drawing sheets are included in the working drawings package?","Question",{"text":112,"@type":113},"The package lists cover sheet, legends/notes, site plan, upper and lower floor plans, two elevation sheets, sections/details, slab layout, electrical plan, bracing plan, and landscaping plan.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which compliance requirements are referenced in the general notes?",{"text":117,"@type":113},"General notes require compliance with the building code of Australia (including specified BCA sections) and current Australian standards, including provisions for wet areas and ventilation.",{"name":119,"@type":110,"acceptedAnswer":120},"What stormwater and drainage obligations are specified?",{"text":121,"@type":113},"Stormwater drainage must meet local authority requirements, avoid runoff onto adjoining properties, prevent ponding under subfloor areas, follow BCA drainage rules, and obtain stormwater approval for the legal discharge route before commencing work.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649121,1792934247,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":41},962090893057,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| Working Drawings\u003Cbr>1 Cover Sheet N/A\u003Cbr>2 Legends / Notes N/A\u003Cbr>3 Site Plan 1:200 @ A 3\u003Cbr>4 Floor Plan-Upper 1: 100 @ A 3\u003Cbr>5 Floor Plan-Lower 1: 100 @ A 3\u003Cbr>6 Elevations 1 of 2 1: 100 @ A 3\u003Cbr>7 Elevations 2 of 2 1: 100 @ A 3\u003Cbr>8 Sections / Details as per dwg.\u003Cbr>9 Slab Layout 1: 100 @ A 3\u003Cbr>10 Electrical Plan 1: 100 @ A 3\u003Cbr>11 Bracing Plan 1: 100 @ A 3\u003Cbr>12 Landscaping Plan 1:200 @ A 3 | \u003Cbr>\u003Cbr>Proposed New Residence\u003Cbr>xxx\u003Cbr>xxx | For: | Issue Date Description |\n| --- | --- | --- | --- |\n|  | |  |  |\n| Example Working Drawings\u003Cbr>Sloping Site\u003Cbr>NOTES:\u003Cbr>Images Are Diagramatic Only Refer To Elevations For Details |  |  |  |\n\nALL WORKS SHALL COMPLY WITH BUT NOT LIMITED TO THE BUILDING CODE OF AUSTRALIAN AND THE CURRENT AUSTRALIAN STANDARDS  \nGeneral Notes  \n• Dishwasher provision under sink drainer including cold water connection & GPO  \n• Ventilation to internal wc / bath to be an exhaust fan in accordance with BCA F5.4 & AS-1668.2  \n• O/head cupboards to 2250mm AFL with MDF bulkhead over  \n• All openings to have 2100mm AFL  \n• Robe fitout (1) shelf with hanging rail  \n• PVC Downpipes  \n• Lift off hinges to w/c, Ensuite, Bathroom  \n• Dimensions are to be verified prior to commencement of work  \n• Given dimensions are to have priority to scaled dimensions  \n• All stairs are to have 190mm maximum risers and 240mm minimum goings  \n• All wet areas to be in accordance with the current Building Code of Australia 3.8.1 & current AS.  \n• Floor wastes to wet areas  \n Denotes Smoke Detector  \nSite Notes  \n• Contractor to verify all boundary clearances & site set-out dimensions prior to commencement of construction  \n• Levels & contours are based on assumed datum. Prior to construction the relevant authority should be contacted for possible minimum floor level requirements & flood information  \n• Retaining walls greater than 1m high (cut or fill) are required to be engineer designed & certified  \n• Batters to comply appropriate soil classification described in table [3.1.1.1](3.1.1.1). BCA Vol.2.  \n• Vehicular cross-over to be constructed as per local council requirements and/or approval  \n• Driveways, paths, porch, alfresco area finish as per specifications  \n• Scrape away vegetation & cut & fill to provide a level building platform  \n• Finish surface to be graded away from house at minimum of 1:20 for at least 1m  \n• Surface water to be channelled to council stormwater drainage system  \n• The driveway & pathways indicated on plan are suggested layouts  \n• All ground levels are approximate only  \n• All works to be constructed in accordance with the current Building Code of Australia, the current Australian Standards and all relevant current trade & technical manuals  \nStormwater / Drainage Notes  \n• Drainage to be in accordance with part 3 of the BCA. Point to meet local authority requirements  \n• All plumbing & draining is to comply with the standard sewerage by-laws & requirements of the local authority  \n• All downpipes to be installed in accordance the current Building Code of Australia [3.5.2.5](3.5.2.5), each downpipe must not serve more than 12m of gutter length  \n• Stormwater system to local authority requirements ( owner / applicant / builder to ensure no storm water runoff occurs onto adjoining properties, back onto any structures & no ponding under sub floor areas  \n• Stormwater approval for legal discharge to be obtained from local authority prior to work commencing. Discharge is proposed to: kerb & channel, rubble pit to council requirements, inter allotment drainage, storm water service main, canal or river.  \n\n| Energy Efficiency\u003Cbr>To comply with BCA 3.12\u003Cbr>(unless otherwise stated) |\n| --- |\n| AS PER ENERGY RATING ASSESSMENT CERTIFICATE |\n\n\n| Construction Notes |  |  |\n| --- | --- | --- |\n| This building has been designed in accordance with the current building code of\u003Cbr>australia, building act ammendment & australian standards |  |  |\n| Roofing |  | Colorbond sheet, Pitch as specified on drawings |\n|","cbCaisMKxkUucEtt","https://ap.wps.com/l/cbCaisMKxkUucEtt","pdf",940741,12,"English","# Working Drawings Package Overview\n## Sheet List (Cover, Plans, Elevations, Sections)\n## General Notes (Compliance, Dimensions, Wet Areas, Stairs)\n## Site Notes (Set-out, Levels, Retaining Walls, Batters)\n## Stormwater / Drainage Notes\n## Energy Efficiency Note\n## Construction Notes (Roof, Walls, Linings, Termite, Smoke Alarms)","[{\"question\":\"What drawing sheets are included in the working drawings package?\",\"answer\":\"The package lists cover sheet, legends/notes, site plan, upper and lower floor plans, two elevation sheets, sections/details, slab layout, electrical plan, bracing plan, and landscaping plan.\"},{\"question\":\"Which compliance requirements are referenced in the general notes?\",\"answer\":\"General notes require compliance with the building code of Australia (including specified BCA sections) and current Australian standards, including provisions for wet areas and ventilation.\"},{\"question\":\"What stormwater and drainage obligations are specified?\",\"answer\":\"Stormwater drainage must meet local authority requirements, avoid runoff onto adjoining properties, prevent ponding under subfloor areas, follow BCA drainage rules, and obtain stormwater approval for the legal discharge route before commencing work.\"}]","Proposed New Residence - Working Drawings - General Notes | PDF",1792797403]