[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648111-105":59,"doc-detail-648111-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","proposed-landscape-ground-floor-illustrative-plan-planning","Proposed Landscape Ground Floor Illustrative Plan - Planning","","Proposed landscape drawings for the Euston Tower Public Realm outline boundary and proposed entrance/exit locations and provide illustrative ground-floor plan information. The document includes general notes covering how detail drawings should be read with landscape general arrangement drawings, specifications, and schedules. It specifies coordination responsibilities with contractors and subcontractors, requirements to check and verify dimensions and existing conditions on site, and guidance to report discrepancies to the landscape architect. It also calls for later-stage confirmation of materials, levels, interfaces, and fabrication drawings approval.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/proposed-landscape-ground-floor-illustrative-plan-planning/648111/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/proposed-landscape-ground-floor-illustrative-plan-planning/648111.png","ImageObject",300,407,{"name":92,"@type":93},"eBook King","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How should these landscape detail drawings be used?","Question",{"text":112,"@type":113},"Read the detail drawings together with the Landscape General Arrangement drawings, specifications, and any schedules.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be verified on site before proceeding?",{"text":117,"@type":113},"All existing build-ups and dimensions must be verified on site, and discrepancies must be notified to the landscape architect.",{"name":119,"@type":110,"acceptedAnswer":120},"Who should coordinate the interfaces and details?",{"text":121,"@type":113},"Interfaces and details must be developed with the contractor and key subcontractors, with coordination for elements designed by other consultants.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648111,1792898285,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Site boundary  \nProposed Entrance / Exit  \n\n| 10 BROCK ST. |  |  | 20 BROCK ST. |  | GENERAL NOTES:\u003Cbr>-Detail drawings show layouts and design intent and should be read in accordance with the Landscape General Arrangement drawings, Specifications, and any Schedules\u003Cbr>-All drawings to be red in conjunction with Consultants’ reports.\u003Cbr>-All details and interfaces to be developed with contractor and key subcontractors.\u003Cbr>- Key references are typically to specification.\u003Cbr>- Drawings may indicate elements to designed and specified by other consultants for coordination purposes. Please also refer to these drawings, schedules, and specifications. Please report any discrepancies Landscape Architect for confirmation.\u003Cbr>-Full fabrication drawings to be provided for approval of all elements, details, and interfaces.\u003Cbr>-All existing build-ups and dimensions must be verified on site. Where possible specific assumptions / discrepancies have been noted on drawings but all existing conditions require verification onsite. All discrepancies to be notified to the Landscape Architect.\u003Cbr>-All materials, surface build-ups, levels, and calculations may be subject to change and to be confirmed in later design stages.\u003Cbr>-All interfaces with buildings to be surveyed prior to commencement of the works\u003Cbr>-The layout of proposed new buildings is shown for reference only. Refer to the Architect’s Planning drawings for details.\u003Cbr>KEY:\u003Cbr>N\u003Cbr>\u003Cbr>0 5 10 15M\u003Cbr>|  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| |  |  |  |  |  |  |  |  |  |\n| 1 TRITON SQUARE | |  | | |  |  |  |  |  |\n| 2 TRITON SQUARE |  | | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | P1 01/12/23 Issued for Planning |  |  |  |\n|  |  | |  |  |  |  |  |  |  |\n|  |  |  |  |  |  | PLANNING |  |  |  |\n|  |  |  |  |  |  | \u003Cbr>357 Kennington Lane London SE11 5QY T 020 7703 3555\u003Cbr>F 020 7703 3890 [E info@dsdha.co.uk](E info@dsdha.co.uk)[ ](E info@dsdha.co.uk)[W www.dsdha.co.uk](W www.dsdha.co.uk) |  |  |  |\n|  |  |  |  |  |  | project |  |  |  |\n|  |  |  |  |  |  | Euston Tower Public Realm 286 Euston Rd. , London NW1 3DP\u003Cbr>NW1 2DB |  |  |  |\n|  |  |  |  |  |  | drawing title |  |  |  |\n|  |  |  |  |  |  | Proposed Landscape Ground Floor Illustrative Plan\u003Cbr>Plan\u003Cbr>DRAFT |  |  |  |\n|  |  |  |  |  |  | drawn | size | date | scale |\n|  |  |  |  |  |  | GB / NA\u003Cbr>MT/MVR | A1 | 01/12/23\u003Cbr>07/06/21 | 1:200\u003Cbr>As indicated |\n|  |  |  |  |  |  | drawing number |  |  | revision |\n|  |  |  |  |  |  | 364_20.000\u003Cbr>273 _20.011 |  |  | P1 |\n|  |  |  |  |  |  | REPORT DISCREPANCIES\u003Cbr>DO NOT SCALE FROM THIS DRAWING COPYRIGHT DSDHA |  | USE LATEST REVISION\u003Cbr>CHECK DIMENSIONS ON SITE |  |\n\n| \u003Cbr>TYPICAL PLANTER EDGE WITH SEATING DETAIL\u003Cbr>\u003Cbr>TYPICAL FLUSH PLANTER EDGE DETAIL | GENERAL NOTES:\u003Cbr>-Detail drawings show layouts and design intent and should be read in accordance with the Landscape General Arrangement drawings, Specifications, and any Schedules\u003Cbr>-All drawings to be red in conjunction with Consultants’ reports.\u003Cbr>-All details and interfaces to be developed with contractor and key subcontractors.\u003Cbr>- Key references are typically to specification.\u003Cbr>- Drawings may indicate elements to designed and specified by other consultants for coordination purposes. Please also refer to these drawings, schedules, and specifications. Please report any discrepancies Landscape Architect for confirmation.\u003Cbr>-Full fabrication drawings to be provided for approval of all elements, details, and interfaces.\u003Cbr>-All existing build-ups and dimensions must be verified on site. Where possible specific assumptions / discrepancies have been noted on drawings but all existing conditions require verification onsite. All discrepancies to be notified to the Landscape Architect.\u003Cbr>-All materials, surface build-ups, levels, and calcul","cbCaiszZZ7uONcTf","https://ap.wps.com/l/cbCaiszZZ7uONcTf","pdf",35352727,13,"English","# General Notes\n## Planning and Coordination Requirements\n## Site Verification and Discrepancy Reporting\n## Materials, Levels, and Later-Stage Confirmation","[{\"question\":\"How should these landscape detail drawings be used?\",\"answer\":\"Read the detail drawings together with the Landscape General Arrangement drawings, specifications, and any schedules.\"},{\"question\":\"What must be verified on site before proceeding?\",\"answer\":\"All existing build-ups and dimensions must be verified on site, and discrepancies must be notified to the landscape architect.\"},{\"question\":\"Who should coordinate the interfaces and details?\",\"answer\":\"Interfaces and details must be developed with the contractor and key subcontractors, with coordination for elements designed by other consultants.\"}]","Proposed Landscape Ground Floor Illustrative Plan - Planning | PDF",1792792337,33]