[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664057-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664057-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","project-drawing-set-and-materials-checklist-version-10121","Project Drawing Set and Materials Checklist - Version 1.01.21","","This document provides a comprehensive verification checklist for project drawing sets and materials, essential for architectural, mechanical, plumbing, and electrical compliance. Designed as a structured audit tool, it facilitates the systematic tracking of required documentation including site plans, building elevations, envelope material specifications, mechanical equipment schedules, and lighting fixture details. It also incorporates specific requirements for Title 24 plan check submissions, ensuring that all necessary information is accounted for during the design and construction documentation phase of building projects. The checklist serves as a professional resource for project managers and architects to ensure all essential technical components are included, meeting industry standards for complete and accurate project documentation submissions.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/project-drawing-set-and-materials-checklist-version-10121/664057/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/project-drawing-set-and-materials-checklist-version-10121/664057.png","ImageObject",300,407,{"name":42,"@type":43},"Sarah ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What categories of information does this checklist cover?","Question",{"text":62,"@type":63},"The checklist covers Architectural, Envelope Materials, Mechanical, Plumbing, Electrical, and Title 24 documentation requirements.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What specific envelope material information is requested?",{"text":67,"@type":63},"It requires data on glazing, specifically the shading coefficient (SGHC), U-value, and frame type, as well as insulation U-values for walls, roofs, ceilings, slabs, and spandrels.",{"name":69,"@type":60,"acceptedAnswer":70},"Does this document track Title 24 compliance?",{"text":71,"@type":63},"Yes, it includes a specific section to verify that all required forms for Title 24 have been submitted for plan check.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664057,1793238002,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},8,"Research & Report",30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":96,"slug":129},19,"general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":128,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":26},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","PROJECT DRAWING SET & MATERIALS INFORMATION  \nCHECKLIST  \n\n| REQUIRED INFORMATION |  |  |\n| --- | --- | --- |\n| Included\u003Cbr>Y/N | Drawings/Information | Notes |\n|  | ARCHITECTURAL |  |\n|  | Site Plan |  |\n|  | Building Floor Plans (All Floors) |  |\n|  | Building Reflected Ceiling Plans (All Floors) |  |\n|  | Building Roof Plan |  |\n|  | Building Elevations |  |\n|  | Building/Wall/Roof Sections and Details |  |\n|  | ENVELOPE MATERIALS |  |\n|  | Glazing: Shading coefficient (SGHC), U-value & frame type |  |\n|  | Insulation: U-value for wall, roof, ceiling, slab and spandrel |  |\n|  | MECHANICAL |  |\n|  | Mechanical Equipment Schedules |  |\n|  | Mechanical Floor Plans (All Floors) |  |\n|  | Mechanical Roof Plan |  |\n|  | PLUMBING |  |\n|  | Domestic Hot Water Heating Equipment Schedule |  |\n|  | Heating Hot Water Equipment Schedule |  |\n|  | Plumbing Floor Plans (All Floors) |  |\n|  | ELECTRICAL |  |\n|  | Lighting Fixture Schedule |  |\n|  | Lighting Plans (All Floors) |  |\n|  | Lighting Control Details |  |\n|  | TITLE 24 |  |\n| | All required forms submitted for Plan Check |  |","cbCaiklSGJpJrKVQ","https://ap.wps.com/l/cbCaiklSGJpJrKVQ","pdf",1062320,"English","# Architectural\n## Site and Building Plans\n## Sections and Elevations\n# Envelope Materials\n## Glazing and Insulation\n# Mechanical\n## Equipment and Plans\n# Plumbing\n## Equipment and Plans\n# Electrical\n## Lighting and Controls\n# Title 24\n## Plan Check Compliance","[{\"question\":\"What categories of information does this checklist cover?\",\"answer\":\"The checklist covers Architectural, Envelope Materials, Mechanical, Plumbing, Electrical, and Title 24 documentation requirements.\"},{\"question\":\"What specific envelope material information is requested?\",\"answer\":\"It requires data on glazing, specifically the shading coefficient (SGHC), U-value, and frame type, as well as insulation U-values for walls, roofs, ceilings, slabs, and spandrels.\"},{\"question\":\"Does this document track Title 24 compliance?\",\"answer\":\"Yes, it includes a specific section to verify that all required forms for Title 24 have been submitted for plan check.\"}]","Project Drawing Set and Materials Checklist - Version 1.01.21 | PDF"]