[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664931-105":59,"doc-detail-664931-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pre-engineered-metal-buildings-erection-and-installation-guide","Pre-Engineered Metal Buildings Erection and Installation Guide","","Pre-Engineered Metal Buildings Erection and Installation Guide outlines safe, fundamental erection methods and stresses adaptation to special site conditions. It specifies responsibilities for anchor bolt casting and verification using issued construction drawings, including total station checks and double-checking location, dimensions, orientation, levels, and squareness. It then covers unloading, transport, material storage and protection, panel stacking limits, and organizes steel member segregation by axes. The guide further provides an erection sequencing workflow starting from the braced bay, plus step-by-step crane handling and temporary bracing before releasing loads, including side wall girts, rafters, purlins, and roof/wall bracing alignment.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pre-engineered-metal-buildings-erection-and-installation-guide/664931/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pre-engineered-metal-buildings-erection-and-installation-guide/664931.png","ImageObject",300,407,{"name":92,"@type":93},"Sophia Brooks","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"How should anchor bolts be cast and verified before erection begins?","Question",{"text":112,"@type":113},"Cast all anchor bolts in concrete pedestals according to the issued “Anchor bolt Setting Plan Drawing” and have the civil contractor perform it. Double-check location, dimensions, orientation, projection/level, center-to-center distance, and structural squareness; report discrepancies immediately for corrective action.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What storage limits and protection practices are recommended for sandwich panels and steel members?",{"text":117,"@type":113},"Use wooden spacers and apply storage and protection provisions for panel sheeting and steel members. Follow the note that sandwich panel stacking is limited to a maximum of 2 bundles only.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the recommended erection sequencing and what temporary measures are required?",{"text":121,"@type":113},"Erection should start with the braced bay, following detailed sequencing based on building system and size/weight. Install side wall girts, assemble rafters, lift and position rafter assemblies, and tie temporary bracings and guy wire/tag lines before releasing crane loads; fix flange braces after installing purlins bay by bay and align roof and wall bracings.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664931,1793279556,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","PRE-ENGINEERED METAL BUILDINGS ERECTION AND INSTALLATION GUIDE  \nThe methods & procedures suggested by this Erection Guide are fundamental in nature and present good, safe erection practices. They can, and should, be modified when necessary to adapt to special conditions or circumstances. Before beginning, familiarize with the building details and sequence of erection. Some buildings need complex sequence of erection; those must be processed & assessed by specialist before execution.  \n1st Step-ANCHOR BOLTS  \nINSTALLATION AND CONTROL  \nAll anchor bolts in the concrete pedestals must be casted in compliance with the Alsy Steel’s Anchor bolt Setting Plan Drawing marked “Issued for Construction”. This must be done by the assigned civil work contractor and should be checked by Alsy Steel’s Erection specialist prior to move in  \nor start of erection. The responsibility and accuracy of placement of all anchor bolts rests to the Customer and his assigned civil contractor. Using Total Station during installation will reduce the total error in critical dimensions.  \nPrior to starting the erection, all the anchor bolts cast must be thoroughly double checked for the following such as: location, dimensions, orientation, projection/level, center to center distance and the squareness of the structure.  \nEnsure all anchor bolts leveling nuts were fixed according to the required level and projection.  \nAny discrepancies found must be reported immediately and require action must betaken by the assigned civil contractor to immediately rectify.  \nPRE-ENGINEERED METAL BUILDINGS ERECTION AND INSTALLATION GUIDE  \n 4   \n2nd Step-UNLOADING, TRANSPORT AND STORING MATERIALS  \nSLOPE  \nFOR  \nDRAINAGE  \nNOTE: SANDWICH PANEL STACKING MAXIMUM OF 2 BUNDLES ONLY  \nSTORAGE AND PROTECTION FOR PANEL SHEETING  \nWOODEN SPACERS  \nWOODEN SPACERS  \n5  \nSLOPE FOR DRAINAGE  \nSTORAGE AND PROTECTION FOR STEEL MEMBERS  \nTEMPORARY PACKING  \nWOODEN SPACERS  \n\n| | |\n| --- | --- |\n\n3rd Step-SEGREGATION, PREPARATION AND ASSEMBLING  \nAccording to erection drawings all steel members has to be segregated to concerned axes. It will be so helpful for erector team and gain time sorting the members.  \n5  \n4th Step-ERECTION SEQUENCE  \nFor different building systems the fundament erection procedure is followed with detailed sequencing system referring to particular building size & weight. Erection has to start with the braced bay.  \n1  \nNYLON BELT HEAVY DUTY  \nTEMPORARY STAY  \nA  \n2  \nCRANE HOOK ~~ ~~ RF COLUMN  \nGUIDE ROPE  \n[ Lift the column with sufficient guy wire rope ]  \n2  \nWASHER  \nADJUSTABLE NUT  \nNUT  \nANCHOR BOLT  \n~~ ~~ FINISHED FLOOR  \n[ Position the column on levelling nut ]  \n 6   \n[ Tightened the nut over supplied washer after plumbing the column ]  \n[ Tie all the temporary bracings before releasing the crane load ]  \n[ Install the side wall girts ]  \n 7   \n7  \n2  \nGROUP  \nANCHOR BOLT  \nTEMPORARY CABLE BRACE STAY  \n[ Repeat the steps on opposite side wall ]  \n[ Assemble the rafters, don’t forget to install the ange braces & tighten the splice joints ]  \n[ Position & rig the rafter assemblies ]  \n 8   \n12  \nA  \nCOLUMN  \n3  \nFLANGE  \nBRACE  \nTEMPORARY CABLE BRACING  \nGUIDE ROPE STAY  \nGUIDE ROPE  \nRAFTER ASSEMBLY  \n[ Lift & erect the rafter assembly, ensure to tie enough guy wire ropes & tag lines ]  \n13  \nCRANE HOOK  \nSPREADER BAR  \nRAFTER ASSEMBLY  \nGUIDE  \nROPE  \nFLANGE  \nBRACE  \nTEMPORARY  \nCABLE BRACING  \nSTAY  \nTEMPORARY  \nCABLE BRACING  \nSTAY  \nA  \n2  \nC  \n[ Similarly lift & erect the other rafter assembly of the 1st braced bay ]  \n 9   \nTEMPORARY CABLE BRACING STAY  \nA  \nNOTE: FLANGE BRACES TO BE FIX AFTER INSTALLING PURLINS BAY BY BAY  \nROOF PURLIN  \nFLANGE BRACE INSTALLED / FIXED  \nTEMPORARY CABLE BRACING STAY  \n3  \nTEMPORARY  \nCABLE BRACING STAY  \n2  \nC  \n14  \n15  \n[ Fill the purlins in between ]  \n~~ ~~ ROOF BRACING  \nROOF PURLIN  \nTEMPORARY CABLE BRACING  \nSTAY  \nA  \nTEMPORARY CABLE BRACING STAY  \n2  \nC  \nWALL BRACING  \n3  \nTEMPORARY CABLE BRACING STAY  \n16  ","cbCaiaT7oYojLCKQ","https://ap.wps.com/l/cbCaiaT7oYojLCKQ","pdf",6069651,18,"English","# 1st Step: Anchor Bolts - Installation and Control\n# 2nd Step: Unloading, Transport and Storing Materials\n## Storage and Protection for Panel Sheeting\n## Storage and Protection for Steel Members\n# 3rd Step: Segregation, Preparation and Assembling\n# 4th Step: Erection Sequence\n## Braced Bay Start and Crane Handling\n## Rafters, Purlins, and Bracing Alignment","[{\"question\":\"How should anchor bolts be cast and verified before erection begins?\",\"answer\":\"Cast all anchor bolts in concrete pedestals according to the issued “Anchor bolt Setting Plan Drawing” and have the civil contractor perform it. Double-check location, dimensions, orientation, projection/level, center-to-center distance, and structural squareness; report discrepancies immediately for corrective action.\"},{\"question\":\"What storage limits and protection practices are recommended for sandwich panels and steel members?\",\"answer\":\"Use wooden spacers and apply storage and protection provisions for panel sheeting and steel members. Follow the note that sandwich panel stacking is limited to a maximum of 2 bundles only.\"},{\"question\":\"What is the recommended erection sequencing and what temporary measures are required?\",\"answer\":\"Erection should start with the braced bay, following detailed sequencing based on building system and size/weight. Install side wall girts, assemble rafters, lift and position rafter assemblies, and tie temporary bracings and guy wire/tag lines before releasing crane loads; fix flange braces after installing purlins bay by bay and align roof and wall bracings.\"}]","Pre-Engineered Metal Buildings Erection and Installation Guide | PDF",45]