[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664925-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-664925-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","pre-engineered-building-technical-specification-rev-no-5-intent-and-special-notes-to-bidders","Pre Engineered Building Technical Specification - Rev No 5 - Intent and Special Notes to Bidders","","Technical specification document establishing the minimum requirements for pre-engineered buildings (PEB) forming part of a solar PV power plant project. It defines intent covering design, design certification, engineering, selection, manufacture, inspection, shop testing and painting, delivery and protection during transit, site handling, erection, testing, final painting, and handover. It also sets special notes to bidders: reading with enclosures, resolving discrepancies by the most stringent requirements, raising purchaser decisions in pre-bid queries, and treating omitted but necessary items as included in bidder’s scope and basic price.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/pre-engineered-building-technical-specification-rev-no-5-intent-and-special-notes-to-bidders/664925/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/pre-engineered-building-technical-specification-rev-no-5-intent-and-special-notes-to-bidders/664925.png","ImageObject",300,407,{"name":42,"@type":43},"Genevieve","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of this specification for pre-engineered buildings (PEB)?","Question",{"text":63,"@type":64},"It establishes the minimum requirements covering design, certification, engineering, manufacturing, testing, delivery, site handling, erection, and final handover for PEBs used in the project.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How should bidders handle discrepancies between the specification and its enclosures?",{"text":68,"@type":64},"Bidders must follow the most stringent requirement determined by the purchaser when discrepancies arise between the job specification and enclosures.",{"name":70,"@type":61,"acceptedAnswer":71},"What is included in the bidder’s scope if certain equipment or services are not explicitly listed?",{"text":72,"@type":64},"Any additional equipment, materials, or services required to complete the PEBs in all respects, as well as items referenced but not listed elsewhere, are deemed covered within the scope and included in the basic quoted price.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},664925,1793279533,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":144},1374391974585,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","| TD-106-1\u003Cbr>Rev No . 5 |  | Form No . |  | PROJECT ENGINEERING & SYSTEMS DIVISION BHEL RC PURAM, HYDERABAD –32 |  |  | Doc. No: PY60051 |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | |  |  |  | Rev No.: 00 |  |\n|  |  |  |  |  |  |  | Page 1 of 34 |  |\n| COPYRIGHT AND CONFIDENTIAL\u003Cbr>The information on this document is the property of BHARAT HEAVY ELECTRICALS LIMITED, It must not be used directly or indirectly in any way detrimental to the interest of the company . |  |  | TECHNICAL SPECIFICATION  FOR PRE ENGINEERED BUILDING |  |  |  |  |  |\n|  |  |  | PROJECT\u003Cbr>CUSTOMER |  | : 1X50 MWp SPV POWER PLANT,NTPC,MANDSAUR, MP\u003Cbr>: NATIONAL THERMAL POWER CORPORATION LIMITED |  |  |  |\n| Ref. D |  |  | Prepared By:\u003Cbr>PVG |  | Checked By :\u003Cbr>VENU GOPAL P | Approved By :\u003Cbr>ESHAN CHANDRA |  | Date :\u003Cbr>04.05.16 |\n\n\n| TD-106-2\u003Cbr>Rev No . 5 |  | Form No . | | PROJECT ENGINEERING & SYSTEMS DIVISION BHEL RCPURAM, HYDERABAD –32 | Doc. No: PY60051 |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  | Rev No.: 00 |\n|  |  |  |  |  | Page 2 of 34 |\n| COPYRIGHT AND CONFIDENTIAL\u003Cbr>T Ahinformation on this document is the property of BT HE VLE T C S LIMITED . It must not be used directly or indirectly in any way detrimental to the interest of the company . |  |  | CONTENT LIST\u003Cbr>S.No Description Page No. 1 Intent of Specification 3 2 Special notes to bidders 3 3 Project Description 5 4 Location of the plant 5 5 Overview of Solar PV Plant 5 6 Bidder’s scope of supply and erection 6 7 Bidder’s scope of services 6 8 Clarity of scope in other areas 7 9 Technical Details 7 10 General Technical Requirements 17 11 Construction Requirements 18 12 Marking, Packing and Despatch 23 13 Documentation 24 14 Document Submission Procedure 29 15 Input Drawings 29 16 Drawings Review and Approvals 30 17 Review Meetings & Kickoff Meeting 30 18 Delivery Schedule & Price Bid Format 31 19 Deviations to Specifications 32 20 Sub Vendor List 33 21 Annexures 33 |  |  |\n| Ref. D |  |  |  |  |  |\n\n\n| TD-106-2\u003Cbr>Rev No . 5 |  | Form No . | | PROJECT ENGINEERING & SYSTEMS DIVISION BHEL RCPURAM, HYDERABAD –32 | Doc. No: PY60051 |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  | Rev No.: 00 |\n|  |  |  |  |  | Page 3 of 34 |\n| COPYRIGHT AND CONFIDENTIAL\u003Cbr>T Ahinformation on this document is the property of BT HE VLE T C S LIMITED . It must not be used directly or indirectly in any way detrimental to the interest of the company . |  |  | 1.0.0. INTENT OF SPECIFICATION :\u003Cbr>1.1.0. The intent of this document is to establish the minimum requirement of design, design certification, engineering, selection, manufacture, assembly, inspection, shop testing, shop painting, delivery FOR site properly packed for transportation suitably protected from weather including transit insurance of all materials, unloading at site, transportation to stores, safe storage at site, insurance against pilferage, transportation from stores to site, final painting, erection, testing, final handling over as mentioned hereinafter for the PreEngineered Buildings (PEB), which form part of project .\u003Cbr>1.2.0. It is not the intent to completely specify all details of design, manufacture and construction. Nevertheless the installations shall conform to high standard of engineering/ quality and shall be capable of serving the intended purpose cont inuously for entire life span of the power plant in a manner acceptable to the purchaser (BHEL) and end customer (NTPC) .\u003Cbr>2.0.0. SPECIAL NOTES TO BIDDERS\u003Cbr>2.1.0. This specification shall be read in conjunction with all its enclosures. In case of any discrepancy arising between this job specification & its enclosures, the most stringent of all (as determined by purchaser) shall be followed. Further, if a requirement in this specification or any of the enclosures, calls for a decision from the Purchaser, it shall be bidder’s sole responsibility to clearly bring out/ highlight the same distinctively in his prebid queries, so as to","cbCaitUBINCaCr2h","https://ap.wps.com/l/cbCaitUBINCaCr2h","pdf",3680428,136,"English","# Intent of Specification\n## Special notes to bidders\n## Project Description\n## Location of the plant\n## Overview of Solar PV Plant\n## Bidder’s scope of supply and erection\n## Bidder’s scope of services\n## Technical Details\n## General Technical Requirements\n## Construction Requirements\n## Marking, Packing and Despatch\n## Documentation\n## Document Submission Procedure\n## Input Drawings\n## Drawings Review and Approvals\n## Review Meetings & Kickoff Meeting\n## Delivery Schedule & Price Bid Format\n## Deviations to Specifications\n## Sub Vendor List\n## Annexures","[{\"question\":\"What is the purpose of this specification for pre-engineered buildings (PEB)?\",\"answer\":\"It establishes the minimum requirements covering design, certification, engineering, manufacturing, testing, delivery, site handling, erection, and final handover for PEBs used in the project.\"},{\"question\":\"How should bidders handle discrepancies between the specification and its enclosures?\",\"answer\":\"Bidders must follow the most stringent requirement determined by the purchaser when discrepancies arise between the job specification and enclosures.\"},{\"question\":\"What is included in the bidder’s scope if certain equipment or services are not explicitly listed?\",\"answer\":\"Any additional equipment, materials, or services required to complete the PEBs in all respects, as well as items referenced but not listed elsewhere, are deemed covered within the scope and included in the basic quoted price.\"}]","Pre Engineered Building Technical Specification - Rev No 5 - Intent and Special Notes to Bidders | PDF",343]