[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-389136-105":59,"doc-detail-389136-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","ppl-pro-forma-connection-policy-final-3-14-2020","PPL Pro Forma Connection Policy - Final 3-14-2020","","Connection Policy governing how any shipper applies to obtain a connection from its pipeline or other facilities into the PPL System operated by Products (SE) Pipe Line Corporation. The policy specifies application requirements, including applicant identity, credit and financial strength evidence, operating experience, petroleum product technical data, a detailed project outline, connection location and tap configuration, flow rate and pressure parameters, safety program summary, and compliance documentation. It also states approval criteria covering regulatory tariff alignment, insurance, technical competence, construction and operational safety, and environmental risk prevention.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ppl-pro-forma-connection-policy-final-3-14-2020/389136/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ppl-pro-forma-connection-policy-final-3-14-2020/389136.png","ImageObject",300,407,{"name":92,"@type":93},"BigDaveOnline","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-26","2026-09-25",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must an applicant submit when requesting approval for a connection to the PPL System?","Question",{"text":112,"@type":113},"The application must include applicant identity details, documentation for legal entities, evidence of creditworthiness and financial strength, a resume of relevant operating experience, technical data for injected petroleum products, and a complete project outline describing the connecting pipeline, connection facilities, and related facilities.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How does PPL evaluate petroleum products to be tendered for connection?",{"text":117,"@type":113},"Petroleum products must meet the requirements of PPL’s currently effective Rules and Regulations Tariff.",{"name":119,"@type":110,"acceptedAnswer":120},"Under what conditions will PPL approve an application for a connection?",{"text":121,"@type":113},"PPL will not approve unless the application provides evidence—at PPL’s sole discretion—of sufficient financial resources, insurance compliance, adequate experience and technical competence, construction and operation methods that do not threaten safety/security, and an absence of substantial environmental damage risk.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},389136,1792173233,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":56,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144,"preview_page_count":19,"preview_urls":145},962090896214,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","PRODUCTS (SE) PIPE LINE CORPORATION  \nCONNECTION POLICY  \nAny Shipper seeking to obtain a connection to the pipelines and other facilities of Products (SE) Pipe Line Corporation (the “PPL System” or “System”) under PPL’s currently effective rules and regulations tariffshall comply with the following requirements:  \n1. Application. Any Shipper (“Applicant”) requesting approval for a connection from its pipeline or other facilities (the “Connecting Pipeline”) to the PPL System shall make an application to PPL. The application shall include the following:  \n(a) Name(s) of Applicant and the owner and the operator of the Connecting Pipeline, listed separately if Applicant is not also the owner and operator of the Connecting Pipeline. If Applicant (or the owner or operator of the Connecting Pipeline) is a legal entity other than an individual, the application shall include documentation establishing the legal status of such entity and the authority and capacity of the officer or manager signing the application.  \n(b) Sufficient information to determine the creditworthiness and financial strength of Applicant, such sufficiency to be determined in the sole discretion of PPL.  \n(c) A resume covering the experience of Applicant with regard to the operation of facilities similar to the Connecting Pipeline.  \n(d) Technical data with respect to the petroleum products to be injected, for purposes of equipment sizing and cost analysis, including, but not limited to, product type, operating temperatures, average and peak throughput rates, and any operating pressure limitations to be considered in connection with design.  \n(e) A complete description (“Project Outline”) of (i) the Connecting Pipeline, (ii) Applicant’s equipment and other facilities necessary or appropriate for measurement and stream analyses, surveillance and/or communication facilities, piping and housing, and any other auxiliary equipment and facilities necessary or appropriate for the connection (the “Connection Facilities”), and (iii) any other facilities to be connected to the System.  \n(f) Designation of the location where Applicant desires to establish a connection and the proposed location of the equipment to be attached directly to the System to make the connection possible as well as any necessary piping to the Connecting Pipeline, including the first block valve, transmix return piping and any facilities for future pipeline connections (the “Connection Tap”) .  \n(g) Maximum and minimum average achievable flow rates and pressures at the Connection Tap.  \n(h) A summary of Applicant’s current safety program including training, safety awareness, and operating rules.  \n(i) A list of all permits, Environmental Impact Statements, approvals, and other compliance documents required by appropriate State and Federal agencies for the Connection Facilities and Connection Tap, with an indication of the status of Applicant’s application for or preparation of such permit approval or other document. To the extent that preliminary approvals or permits have been or can feasibly be obtained prior to processing the connection application, evidence of such approvals or permits shall be submitted along with the application.  \n(j) A statement by Applicant that it has read the currently effective PPL tariffs pertaining to the proposed movement, including the Rules and Regulations Tariff, and acknowledges that the tariffs, as amended from time to time, will govern the proposed movement and that, in any conflict between the tariffs and any connection agreement entered into by PPL and the Applicant, the tariffs shall govern.  \nThe Application shall be delivered to the Vice President of Business Development, Products (SE) Pipe Line Corporation, 1001 Louisiana Street, Suite 1000, Houston, TX 77002.  \n2. Approval of Petroleum Products. Petroleum products to be tendered shall meet the requirements of PPL’s currently effective Rules and Regulations Tariff.  \n3. Review and Approval of Applications. P","cbCaiaVgB2ZzRpYJ","https://ap.wps.com/l/cbCaiaVgB2ZzRpYJ","pdf",196901,"English","# Application\n## Approval of Petroleum Products\n## Review and Approval of Applications\n# Requirements for Approval of Application","[{\"question\":\"What must an applicant submit when requesting approval for a connection to the PPL System?\",\"answer\":\"The application must include applicant identity details, documentation for legal entities, evidence of creditworthiness and financial strength, a resume of relevant operating experience, technical data for injected petroleum products, and a complete project outline describing the connecting pipeline, connection facilities, and related facilities.\"},{\"question\":\"How does PPL evaluate petroleum products to be tendered for connection?\",\"answer\":\"Petroleum products must meet the requirements of PPL’s currently effective Rules and Regulations Tariff.\"},{\"question\":\"Under what conditions will PPL approve an application for a connection?\",\"answer\":\"PPL will not approve unless the application provides evidence—at PPL’s sole discretion—of sufficient financial resources, insurance compliance, adequate experience and technical competence, construction and operation methods that do not threaten safety/security, and an absence of substantial environmental damage risk.\"}]","PPL Pro Forma Connection Policy - Final 3-14-2020 | PDF",1790316320,48,[146,150,154,158],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/b020199934f2e61b2d04867800efe07e.webp",983,1272,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/e3aad3b670064da16eb33fdb98abe426.webp",982,1270,{"page_no":81,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/72ab07ffbbfbeca9d80cae3661b0cf71.webp",981,1269,{"page_no":19,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/032f205b5faeae83d8ae30fd8b5224ad.webp",980,1268]