[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-340030-105":59,"doc-detail-340030-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","ppap-process-checklist-sign-off-sheet-instructions","PPAP Process Checklist - Sign Off Sheet instructions","","PPAP Process Checklist sign-off instructions for Nexteer Automotive explain how suppliers must compile and submit electronic PPAP documentation for global collaboration. The package must start with the approved Nexteer PPAP checklist from the AQE or SQE, with section-specific notes cross-referenced to the electronic checklist version. Requirements cover submission content from design records and engineering change documents through DFMEA/PFMEA, including process flow expectations, operation number alignment, and handling of Nexteer/OEM customer precedence.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":20,"@type":76,"position":81},"https://docshare.wps.com/document/exam/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ppap-process-checklist-sign-off-sheet-instructions/340030/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ppap-process-checklist-sign-off-sheet-instructions/340030.png","ImageObject",300,407,{"name":92,"@type":93},"Aurelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-09-21",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is required at the start of the PPAP package?","Question",{"text":113,"@type":114},"The first page must be the approved PPAP checklist issued by the Nexteer Advanced Quality Engineer (AQE) or Supplier Quality Engineer (SQE). The AQE/SQE must reference the electronic version for requirement notes and comments by section.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"Which PPAP sections are expected to be provided by the supplier?",{"text":118,"@type":114},"The supplier must submit design record materials, functional/material/test and purchase specifications, and engineering change documents that authorize deviations. DFMEA is required when the supplier is design responsible; otherwise it is Nexteer Automotive’s responsibility.",{"name":120,"@type":111,"acceptedAnswer":121},"How must operation numbers be managed across PPAP documents?",{"text":122,"@type":114},"Operation numbers must match one-to-one between the PFD, FMEA, and Control Plans to enable cross-referencing (except for “family” of parts). Nexteer Special Characteristics must also be noted on the PFDs.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},340030,1790556626,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":19,"category_name":20,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","PPAP Process Checklist \\ Sign Off Sheet instructions  \nIn addition to these requirements you must meet all Nexteer Automotive Supplier Requirements noted in the Nexteer Automotive Supplier Website. Nexteer Automotive has moved to electronic PPAP documentation submission and storage for global collaboration and access. In order to facilitate multi regional sharing of information, all PPAP documentation shall be in English, or include an accurate English translation. See the Nexteer Supplier Website for electronic submission Instructions:  \n[Nexteer.com](Nexteer.com) , Suppliers, Processes, Quality. The first page of the package should be the approved PPAP checklist from the Nexteer Advanced Quality Engineer (AQE) or Supplier Quality Engineer (SQE) . The Nexteer AQE/SQE must refer to the electronic version of this checklist for specific requirement notes and comments by section (See the appropriate version of the Nexteer Automotive Form F1020 – PPAP Checklist, located in the Nexteer Supplier Portal) . Consult your AQE/SQE for more information.  \nThese instructions have been revised to conform to the latest update of the PPAP Process Checklist, and are specific to Nexteer Automotive. These revisions are intended to correspond to AIAG PPAP 4th Edition manual, including OEM Customer Specific Requirements for Nexteer Automotive. Reference the latest version of [the PPAP Manual:](the PPAP Manual: www.aiag.org)[ ](the PPAP Manual: www.aiag.org)[www.aiag.org](the PPAP Manual: www.aiag.org)  \nNOTE: Nexteer’s OEM Customer requirements may supersede the PPAP Checklist requirements. In this instance, the OEM Customer requirements will be discussed during the MAPP (Manufacturability Assessment and Process Plan) Review.  \n1) a) Design Record-Drawing – Send in a legible copy of the Print with the submission. Each and every feature (including Print Notes , Standard Tolerance Notes and Specifications) must be“ballooned” or “road mapped” to correspond with the inspection results. Notes on the print must also be included on the ballooned print, and on the inspection data. The print must be at a minimum; a Nexteer Product Engineering signed print.  \nb) Design Record – Functional / Material / Test Specifications/Purchase Specifications – Send in a legible copy of all customer design records and specifications. NOTE: For Specifications that are copyright protected, Supplier is to provide Nexteer with a document stating the revision level of specification used.  \n2) Engineering Change Documents – Any marked and signed drawings, specifications etc. , authorizing a Supplier to deviate from the design record. For Nexteer, a deviation must normally be authorized by way of an Engineering Permit. Applicable Engineering Permit(s) should be included in this section of PPAP. If the Supplier PPAP submission includes changes referencedon a submitted Supplier Change Request (SCR) , then a copy of the approved SCR must be included in this section of PPAP.  \n3) Customer Engineering Approval – This is a section which is included in latest AIAG PPAP manual, but which has little to no application for Nexteer Automotive components. Nexteer’s engineering department will not typically provide an approval regarding PPAP prior to the submission itself. As such, this section will typically be left blank. This section may be used in the case of OEM engineering approval, if required for a Directed Buy component.  \n4) Design FMEA (DFMEA), if Supplier is Design Responsible-The Design FMEA is required if the Supplier is responsible for the design of the part (For example: Black Box design) . Otherwise, the Design FMEA is the responsibility of Nexteer Automotive. If the Supplier feels that the Design FMEA is proprietary, they should insert a sheet in the PPAP package stating their position. Reference the latest version of the [FMEA Manual:](FMEA Manual: www.aiag.org)[ ](FMEA Manual: www.aiag.org)[www.aiag.org](FMEA Manual: www.aiag.org)  \n5) Process Flow Diagram (PFD)– The Proce","cbCain861ZCmh2ES","https://ap.wps.com/l/cbCain861ZCmh2ES","pdf",362117,"English","# PPAP submission instructions\n## General electronic documentation and checklist requirements\n## Design record and inspection documentation\n## Engineering change documents\n## Customer engineering approval\n## DFMEA and FMEA manual reference\n## Process flow diagram (PFD)\n## Process FMEA (PFMEA)","[{\"question\":\"What is required at the start of the PPAP package?\",\"answer\":\"The first page must be the approved PPAP checklist issued by the Nexteer Advanced Quality Engineer (AQE) or Supplier Quality Engineer (SQE). The AQE/SQE must reference the electronic version for requirement notes and comments by section.\"},{\"question\":\"Which PPAP sections are expected to be provided by the supplier?\",\"answer\":\"The supplier must submit design record materials, functional/material/test and purchase specifications, and engineering change documents that authorize deviations. DFMEA is required when the supplier is design responsible; otherwise it is Nexteer Automotive’s responsibility.\"},{\"question\":\"How must operation numbers be managed across PPAP documents?\",\"answer\":\"Operation numbers must match one-to-one between the PFD, FMEA, and Control Plans to enable cross-referencing (except for “family” of parts). Nexteer Special Characteristics must also be noted on the PFDs.\"}]","PPAP Process Checklist - Sign Off Sheet instructions | PDF",1790033828,18]