[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665098-105":59,"doc-detail-665098-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","plumbing-drawing-over-head-tank-detail-sector-p-oht-01-approval-submission-advance-copy-construction","PLUMBING DRAWING - OVER HEAD TANK DETAIL - SECTOR / P / OHT / 01 - Approval Submission Advance Copy - Construction","","Engineering plumbing drawing for an overhead tank detail, Sector-P, including design notes and construction requirements. It specifies all dimensions in millimeters, details the provision of puddle flanges during civil tank execution, and requires MS/ GI pipe flanged or threaded puddle flanges to be hot-dip galvanized and painted with two coats of anti-corrosive paint over primer before placing in RCC. It also states tack-welding to RCC retaining wall reinforcement and sets proper positions and levels for pipe sleeves and G.I. pipe connections.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/plumbing-drawing-over-head-tank-detail-sector-p-oht-01-approval-submission-advance-copy-construction/665098/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/plumbing-drawing-over-head-tank-detail-sector-p-oht-01-approval-submission-advance-copy-construction/665098.png","ImageObject",300,407,{"name":92,"@type":93},"Aurelia","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What unit system are the dimensions provided in for the plumbing drawing?","Question",{"text":112,"@type":113},"All dimensions are in millimeters (M.M.) unless otherwise specified.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should the MS/GI pipe puddle flange be prepared before installing in RCC?",{"text":117,"@type":113},"After fabrication and painting with two coats of anti-corrosive paint over primer, the puddle flange must be hot-dip galvanized before placing in RCC.",{"name":119,"@type":110,"acceptedAnswer":120},"Where and how should the puddle flange be fixed according to the notes?",{"text":121,"@type":113},"The puddle flange should be tack-welded to the reinforcement of the RCC retaining wall at the proper position and level.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},665098,1793289611,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","| \u003Cbr>\u003Cbr>PLAN\u003Cbr>\u003Cbr>\u003Cbr>SECTION-AA | NOTES : (PLUMBING)\u003Cbr>\u003Cbr>1. ALL THE DIMENSIONS ARE IN M. M. (UNLESS SPECIFIED)\u003Cbr>2. THE PUDDLE FLANGE ARE TO BE PROVIDED DURING EXECUTION OF CIVIL WORKS OF TANKS.\u003Cbr>3. THE M.S. / G. I. PIPE FLANGED / THREADED PUDDLE FLANGE WILL BE HOT DIPPED GALVANIZED AFTER FABRICATION AND PAINTING WITH TWO COATS OF ANTI CORROSIVE PAINT OVER PRIMER BEFORE PLACING IN RCC.\u003Cbr>4. THE PUDDLE FLANGE SHOULD BE TACK WELDED TO THE REINFORCEMENT OF RCC RETAINING WALL AT PROPER POSITION AND LEVEL.\u003Cbr>5. ALL LEVEL HAS BEEN CALCULATED WITH RESPECT OF TANK BOTTOM /(9(/ $6 􀂓􀀓􀀓 PP\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>G.I. PIPE OF ~~  ~~REQUIRED DIA\u003Cbr>\u003Cbr>SLEEVE TO BE TACK WELDED TO STEEL REINFORCEMET IN RETAINING WALL\u003Cbr>| LEGEND : S.\u003Cbr>NO. SLEEVE D E S C R I P T I O N LEVEL (MM)\u003Cbr>Bottom of Pipe NOS. 1. F\u003Cbr>150 MM DIA. SLEEVE\u003Cbr>FOR FIRE TANK OUTLET + 50 mm 1 2. D\u003Cbr>80 MM DIA. SLEEVE FOR DOMESTIC WATER TANK OUTLET + 915 mm 1 3. A\u003Cbr>50 MM DIA SLEEVE\u003Cbr>FOR DOMESTIC WATER TANK INLET + 1745 mm 1 4. O\u003Cbr>65 MM DIA SLEEVE FOR OVERFLOW FROM FIRE & DOMESTIC WATER TANK + 1695 mm 1 5. L\u003Cbr>+ 1745 mm 1 6. W\u003Cbr>50 MM DIA SLEEVE FOR WASHOUT FROM TANK 􀂓 􀀓􀀓 PP 1 7. V\u003Cbr>50 MM DIA SLEEVE FOR\u003Cbr>VENT PIPE IN TOP SLAB 2 8. S1\u003Cbr>80 MM SPARE SLEEVE FOR \u003Cbr>+ 915 mm 1 \u003Cbr>R0 10.02.2016 issued for approval [rev. no](rev. no). date revision\u003Cbr>project\u003Cbr>GROUP HOUSING AT SECTOR-P\u003Cbr>\u003Cbr>title\u003Cbr>PLUMBING DRAWING ( SECTOR-P )\u003Cbr>subtitle\u003Cbr>OVER HEAD TANK DETAIL\u003Cbr>\u003Cbr>drawing released for\u003Cbr> APPROVAL  SUBMISSION\u003Cbr> ADVANCE COPY  CONSTRUCTION\u003Cbr>[drg. no](drg. no).\u003Cbr>SECTOR / P / OHT / 01\u003Cbr>\u003Cbr>scale\u003Cbr>1:55 (A2) date\u003Cbr>10.02.2016\u003Cbr>drawn by\u003Cbr>Vipin\u003Cbr>designed by\u003Cbr>Shakir Shabir checked by Anand Havelia\u003Cbr>CLIENT\u003Cbr>LUCKNOW DEVELOPMENT AUTHORITY\u003Cbr>architects\u003Cbr>\u003Cbr>r a j e s h & a s s o c i a t e s\u003Cbr>architects, engineers, planners & interior designers\u003Cbr>magna house, first floor, D-2, infocity II, gurgaon-122 001, india tel : +91-124-4626666 fax: +91-124-4626688\u003Cbr>3, b.n. road, kaiserbagh, lucknow-226 001, india Tel : +91-522-2626838 +91-522-2628360\u003Cbr>services consultant\u003Cbr>Consummate Engineering Services (P) Ltd.\u003Cbr>\u003Cbr>Noida Office : B-67, Sector-67, Noida-201 301\u003Cbr>Tel : (0120) 2593500 ( 30 Lines )\u003Cbr>Lko. Office : R 006, Rohtas Plumeria, Gomti Nagar, Lucknow\u003Cbr>Tel : (0522) 6515455\u003Cbr>[e mail : mail@cespl.in](e mail : mail@cespl.in), [website : www.cespl.in](website : www.cespl.in) |\n| --- | --- | --- |","cbCaijLawf6stfmf","https://ap.wps.com/l/cbCaijLawf6stfmf","pdf",393785,"English","# Notes (Plumbing)\n## General dimensions and materials\n## Puddle flange and corrosion protection requirements\n## Levels and placement guidance\n# Legend and sleeve details\n## Sleeve types by tank outlets and overflow\n## Vent pipe and washout sleeve entries\n# Drawing metadata\n## Sector and drawing number\n## Date and scale","[{\"question\":\"What unit system are the dimensions provided in for the plumbing drawing?\",\"answer\":\"All dimensions are in millimeters (M.M.) unless otherwise specified.\"},{\"question\":\"How should the MS/GI pipe puddle flange be prepared before installing in RCC?\",\"answer\":\"After fabrication and painting with two coats of anti-corrosive paint over primer, the puddle flange must be hot-dip galvanized before placing in RCC.\"},{\"question\":\"Where and how should the puddle flange be fixed according to the notes?\",\"answer\":\"The puddle flange should be tack-welded to the reinforcement of the RCC retaining wall at the proper position and level.\"}]","PLUMBING DRAWING - OVER HEAD TANK DETAIL - SECTOR / P / OHT / 01 - Approval Submission Advance Copy - Construction | PDF"]