[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663261-105":59,"doc-detail-663261-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","plumbing-drainage-drawings-proposed-tembo-apartments-typical-1-4th-floor-drainage-layout-revision-0","Plumbing & Drainage Drawings - Proposed Tembo Apartments - Typical 1-4th Floor Drainage Layout - Revision 0","","Proposed Tembo Apartments plumbing and drainage drawing set for Tembo Ventures Housing Co-operative Society Limited, including typical drainage layouts and roof/terrace/clubs-house drainage plan sheets. The notes specify all dimensions in millimetres, coordinated reading with architects and civil engineers drawings, approved brass/bronze valve construction, and requirements for uPVC or GMS sleeving and 150mm concrete surrounds below-floor and external car-park areas. Internal pipework uses cpvc to BS 6700, with sample approval and pressure testing before plastering, plus concealed pipework in chases and voids and on-site confirmation of fitting locations.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/plumbing-drainage-drawings-proposed-tembo-apartments-typical-1-4th-floor-drainage-layout-revision-0/663261/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/plumbing-drainage-drawings-proposed-tembo-apartments-typical-1-4th-floor-drainage-layout-revision-0/663261.png","ImageObject",300,407,{"name":92,"@type":93},"AfterMidnight","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What units are used for all dimensions in the drawings?","Question",{"text":112,"@type":113},"All dimensions are in millimetres unless otherwise stated.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What material standard applies to internal plumbing pipes?",{"text":117,"@type":113},"Internal plumbing pipes shall be cpvc to BS 6700, with samples approved before installation starts.",{"name":119,"@type":110,"acceptedAnswer":120},"Are plumbing pipes allowed to be exposed after installation?",{"text":121,"@type":113},"No. Pipework shall run in wall chases, underfloor, underworktop, and ceiling voids; exposed pipework shall not be accepted.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663261,1793226084,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},962090896061,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","PROPOSED TEMBO APARTMENTS  \nPLUMBING & DRAINAGE DRAWINGS  \n| | NOTES\u003Cbr>1. All dimensions are in millimetres unless otherwise stated.\u003Cbr>2. All drawing shall be read together with Architects and Civil Engineers drawings.\u003Cbr>3. All valves to be of brass/ bronze heavy pattern construction as ''peglar\" or approved equaivalent\u003Cbr>4. All plumbing & drainage pipes underfloorslab/driveway/walkway car park etc tobe sleeved in heavy duty uPVC or GMS pipe as instructed and to be encased in\u003Cbr>150mm diameter concrete surround.\u003Cbr>5. All internal plumbing pipes shall be cpvc to BS 6700. Samples shall be approved before installation commences.\u003Cbr>6 All pipework shall run in wall chase, underfloor,underworktop, in ceiling voids [etc. exposed](etc. exposed) pipe work shall not be accepted.\u003Cbr>7. Pipes shall be pressure tested before plastering of walls commences.\u003Cbr>8. The exact location of all fittings to be confirmed on site\u003Cbr>KEY/LEGEND\u003Cbr>S&VP- STACK & VENT PIPE T/A - TO ABOVE\u003Cbr>T/B -TO BELOW FT - FLOOR TRAP RE - RODDING EYE\u003Cbr>IC -INSPECTION CHAMBER GT - GULLEY TRAP\u003Cbr>F/A -FROM ABOVE\u003Cbr>\u003Cbr>PROPOSED RESIDENTIAL DEVELOPMENT ON PLOT RURIRU/KIU BLOCK 2\u003Cbr>(GITHUNGURI) 22607, OFF EASTERN BYPASS, RUIRU, KIAMBU.\u003Cbr>TEMBO VENTURES HOUSING\u003Cbr>CO-OPERATIVE SOCIETY LIMITED\u003Cbr>P.O BOX 91-00618 NAIROBI.\u003Cbr>ARCHSCAN ASSOCIATES LTD\u003Cbr>P.O. BOX 10958-00100, NAIROBI.\u003Cbr>MEPLAN SERVICES\u003Cbr>P.O BOX 27200-00100 NAIROBI.\u003Cbr>Drg. Title\u003Cbr>TYPICAL 1-4TH FLOOR DRAINAGE LAYOUT |  |\n| --- | --- | --- |\n|  |  |  |\n|  | SCALE NTS | Design\u003Cbr>D.S |\n|  | Drawn by D.S | Revision 0 |\n|  | Checked by\u003Cbr>F.M | [Drg. no](Drg. no).\u003Cbr>MS/TA/04/21/M02 |\n|  | Date\u003Cbr>APR, 2021 |  |\n\n| \u003Cbr>L[--]05 CLUB HOUSE\u003Cbr>Plinth Area: 175sqm | NOTES\u003Cbr>1. All dimensions are in millimetres unless otherwise stated.\u003Cbr>2. All drawing shall be read together with Architects and Civil Engineers drawings.\u003Cbr>3. All valves to be of brass/ bronze heavy pattern construction as ''peglar\" or approved equaivalent\u003Cbr>4. All plumbing & drainage pipes underfloorslab/driveway/walkway car park etc tobe sleeved in heavy duty uPVC or GMS pipe as instructed and to be encased in\u003Cbr>150mm diameter concrete surround.\u003Cbr>5. All internal plumbing pipes shall be cpvc to BS 6700. Samples shall be approved before installation commences.\u003Cbr>6 All pipework shall run in wall chase, underfloor,underworktop, in ceiling voids [etc. exposed](etc. exposed) pipe work shall not be accepted.\u003Cbr>7. Pipes shall be pressure tested before plastering of walls commences.\u003Cbr>8. The exact location of all fittings to be confirmed on site\u003Cbr>KEY/LEGEND\u003Cbr>S&VP- STACK & VENT PIPE T/A - TO ABOVE\u003Cbr>T/B -TO BELOW FT - FLOOR TRAP RE - RODDING EYE\u003Cbr>IC -INSPECTION CHAMBER GT - GULLEY TRAP\u003Cbr>F/A -FROM ABOVE |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |\n|  |  | | \u003Cbr>| | |  |  |\n|  |  | PROPOSED RESIDENTIAL DEVELOPMENT ON PLOT RURIRU/KIU BLOCK 2\u003Cbr>(GITHUNGURI) 22607, OFF EASTERN BYPASS, RUIRU, KIAMBU.\u003Cbr>\u003Cbr>TEMBO VENTURES HOUSING CO-OPERATIVE SOCIETY LIMITED P.O BOX 91-00618\u003Cbr>NAIROBI. |  |  |  |  |  |\n|  |  | \u003Cbr>ARCHSCAN ASSOCIATES LTD P.O. BOX 10958-00100, NAIROBI.\u003Cbr>MEPLAN SERVICES P.O BOX 27200-00100 NAIROBI.\u003Cbr>Drg. Title\u003Cbr>CLUB HOUSE DRAINAGE LAYOUT |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  | SCALE NTS |  |  |  |  |  | Design\u003Cbr>D.S |\n|  | Drawn by D.S |  |  |  |  |  | Revision 0 |\n|  | Checked by\u003Cbr>F.M |  |  |  |  |  | [Drg. no](Drg. no).\u003Cbr>MS/TA/04/21/M04 |\n|  | Date\u003Cbr>APR, 2021 |  |  |  |  |  |  |\n\n\n| \u003Cbr>L[--]11 ROOF PLAN | NOTES\u003Cbr>1. All dimensions are in millimetres unless otherwise stated.\u003Cbr>2. All drawing shall be read together with Architects and Civil Engineers drawings.\u003Cbr>3. All valves to be of brass/ bronze heavy pattern construction as ''peglar\" or approved equaivalent\u003Cbr>4. All plumbing & drainage pipes underfloorslab/driveway/walkway car park etc tobe sleeved in heavy duty uPVC or GMS pipe as instructed and to be encased in\u003Cbr>150mm diameter concrete","cbCaigx7NkkjDRk6","https://ap.wps.com/l/cbCaigx7NkkjDRk6","pdf",5759977,11,"English","# Plumbing & Drainage Drawings\n## Notes and General Requirements\n## Key/Legend\n## Typical 1-4th Floor Drainage Layout\n## Club House Drainage Layout\n## Roof Terrace Drainage Layout\n## Ground Floor Drainage Layout","[{\"question\":\"What units are used for all dimensions in the drawings?\",\"answer\":\"All dimensions are in millimetres unless otherwise stated.\"},{\"question\":\"What material standard applies to internal plumbing pipes?\",\"answer\":\"Internal plumbing pipes shall be cpvc to BS 6700, with samples approved before installation starts.\"},{\"question\":\"Are plumbing pipes allowed to be exposed after installation?\",\"answer\":\"No. Pipework shall run in wall chases, underfloor, underworktop, and ceiling voids; exposed pipework shall not be accepted.\"}]","Plumbing & Drainage Drawings - Proposed Tembo Apartments - Typical 1-4th Floor Drainage Layout - Revision 0 | PDF",28]