[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650557-105":59,"doc-detail-650557-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pln20_170-plans-building-permit-set","PLN20_170 Plans - Building Permit Set","","Building permit set for a project located at 2483 Mount Pleasant Road, San Jose, CA 95148. Includes cover sheet/project data and plan drawing identifiers, with notes covering site and construction coordination requirements. Provides general requirements such as not scaling drawings, using written dimensions, coordinating mechanical/electrical/plumbing routing, resolving document conflicts, cutting and patching obligations, shoring/underpinning under separate permits, agency and utility coordination, inspections/testing notification, site utility review, property protection, debris removal, final cleaning, and one-year warranty for workmanship and materials.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pln20_170-plans-building-permit-set/650557/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pln20_170-plans-building-permit-set/650557.png","ImageObject",300,407,{"name":92,"@type":93},"Mafia Boss","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the key general requirements stated in the set?","Question",{"text":112,"@type":113},"The document requires not scaling drawings, using written dimensions, and coordinating work to prevent conflicts, including routing of mechanical, electrical, and plumbing items.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are document conflicts and ambiguities handled?",{"text":117,"@type":113},"If any conflicts in the information are discovered, the owner must be notified immediately for clarification before proceeding with work.",{"name":119,"@type":110,"acceptedAnswer":120},"What responsibilities are specified for inspections and testing?",{"text":121,"@type":113},"If required by governing agencies, the owner provides special inspections and testing through the structural engineer or a licensed third-party testing agency, and the general contractor must give at least five days notification once ready for inspection.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650557,1793067567,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962090760730,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","2483 MOUNT PLEASANT ROAD  \nSAN JOSE, CA 95148  \nBUILDING PERMIT SET  \nConsultant Address  \nAddress  \nAddress Phone  \nConsultant Address  \nAddress  \nAddress Phone  \nConsultant Address  \nAddress  \nAddress Phone  \nConsultant Address  \nAddress  \nAddress Phone  \nConsultant Address  \nAddress  \nAddress Phone  \n\n| No. | Description | Date |\n| --- | --- | --- |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\nFarhad Taghibakhsh  \n2483 MOUNT PLEASANT ROAD, SAN JOSE CA 95148  \nCOVERSHEET  \n28/07/2020 08:07:43  \nProject Number Date  \nDrawn By Checked By  \nProject Number Issue Date Author Checker  \nA000  \nScale  \nPROJECT DATA  \nTRUE  \n0  \nNORTH ARROW  \nTRUE NORTH PROJECT NORTH  \nCOLUMN LINES (GRID LINE)  \nLETTERS ON VERTICAL AXIS  \nNUMBERS ON HORIZONTAL AXIS  \nSIM  \n1  \nA101  \nSIM  \nSIM  \n1  \nA101  \n1  \n4 2  \n201  \n36 x 48  \n1i  \n36 x 48  \n1i  \n1  \n1  \n101  \nRoom name  \n1 / A101  \nDOOR SYMBOL  \n(SEE DOOR SCHEDULE)  \nWINDOW TYPE  \n(SEE WINDOW SCHEDULE)  \nCASEWORK TYPE  \n(SEE CASEWORK SCHEDULE)  \n3  \nTW  \nTC  \nTP  \nWALL TAG  \n(SEE WALL LEGEND)  \nEQUIPMENT TYPE  \nTYPE OF EQUIPMENT EQUIPMENT GROUP  \nKEYNOTE TAG  \nDEMOLITION, REMODEL OR CONSTRUCTION NOTE. SEE ACCOMPANYING LEGEND, SAME SHEET.  \nREVISION  \nROOM TAG  \nROOM NUMBER  \nROOM NAME  \nMATCH LINE  \nSS  \nW  \nSD  \nG  \nE  \nT  \nELEVATION IDENTIFICATION AND SHEET NUMBER  \nMATCH LINE  \n4' -0\"  \nBENCHMARK, CONTROL OR DATUM POINT  \nGENERAL NOTES  \n1. DIMENSIONS ON DRAWINGS: DO NOT SCALE THE DRAWINGS. USE WRITTEN DIMENSIONS. IF CONFLICTS EXIST NOTIFY THE OWNER BEFORE PROCEEDING WITH THE WORK. DIMENSIONS ARE TO THE FACE OF FINISH UNLESS OTHERWISE NOTED.  \n2. COORDINATION OF WORK: THE CONTRACTOR IS REPONSIBLE FOR THE COORDINATION OF HIS/HER WORK AND THAT OF ALL SUB-CONTRACTORS. VERIFY AND COORDINATE ALL ROUTING OF MECHANICAL, ELECTRICAL, AND PLUMBING ITEMS, ROUGH-IN DIMENSIONS AND REQUIRED CLEARANCES OF UTILITIES, APPLIANCES, AND OTHER ITEMS ASSOCIATED WITH THE PROJECT WORK SUCH THAT CONFLICTS DO NOT OCCUR. NOTIFY OWNER OF PROBLEMATIC CONDITIONS.  \n3. CONFLICTS IN DOCUMENTS: NOTIFY OWNER IMMEDIATELY FOR CLARIFICATION SHOULD ANY CONFLICT IN INFORMATION FOUND IN THE DOCUMENTATION BE DISCOVERED.  \n4. CUTTING AND PATCHING: WHERE WORK REQUIRES CUTTING INTO OR DISRUPTION OF EXISTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR PATCHING AND REPAIRING BOTH THE AREA OF WORK AND ITS ADJACENT SURFACES TO MATCH ADJACENT EXISTING SURFACES. PATCHING INCLUDES FINISH PAINTING OF AREA DISRUPTED.  \n5. TEMPORARY SHORING AND UNDERPINNING: IF REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SHORING AND BRACING OF BOTH EXISTING AND NEW WORK AS REQUIRED TO STABILIZE THE WORK AND TO MINIMIZE RISK OF PROPERTY DAMAGE OR INJURY ON SITE OR TO ADJACENT PROPERTIES. SHORING AND UNDERPINNING WORK IS TO BE PERFORMED UNDER SEPARATE PERMIT OBTAINED BY THE GENERAL CONTRACTOR.  \n6. AGENCY, INSPECTIONS, AND UTILITY COORDINATION: THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED CITY AGENCY INSPECTIONS. IN ADDITION, THE CONTRACTOR IS TO COORDINATE WORK WITH ALL UTILITY COMPANIES (GAS, ELECTRICITY, WATER, PHONES, ETC. ) SUCH THAT SERVICE TO THE SITE IS EITHER MAINTAINED OR PROVIDED IN A TIMELY MANNER TO THE COMPLETION OF THE WORK. COORDINATE NEW SERVICE LOCATIONS AND CONFIGURATIONS WITH THE APPROPRIATE PROVIDER AND THE OWNER  \n7. SPECIAL INSPECTIONS AND TESTING: IF REQUIRED BY THE GOVERNING AGENCIES, THE OWNER IS TO PROVIDE REQUIRED SPECIAL INSPECTIONS AND TESTING VIA EITHER THE STRUCTURAL ENGINEER OR A LICENSED THIRD-PARTY TESTING AGENCY. THE GENERAL CONTRACTOR IS TO COORDINATE ALL WORK AND GIVE THE OWNER A MINIMUM FIVE DAY NOTIFICATION ONCE THE WORK IS READY FOR INSPECTION.  \nKEEP ALL REPORTS FOR SUBMITTAL TO AUTHORITIES AT FINAL INSPECTION.  \n8. SITE UTILITIES: THE CONTRACTOR IS TO CAREFULLY REVIEW ANY EXISTING UTILITIES AND IDE","cbCaitMTdNp2dLQL","https://ap.wps.com/l/cbCaitMTdNp2dLQL","pdf",23632105,25,"English","# Project Data\n## General Notes","[{\"question\":\"What are the key general requirements stated in the set?\",\"answer\":\"The document requires not scaling drawings, using written dimensions, and coordinating work to prevent conflicts, including routing of mechanical, electrical, and plumbing items.\"},{\"question\":\"How are document conflicts and ambiguities handled?\",\"answer\":\"If any conflicts in the information are discovered, the owner must be notified immediately for clarification before proceeding with work.\"},{\"question\":\"What responsibilities are specified for inspections and testing?\",\"answer\":\"If required by governing agencies, the owner provides special inspections and testing through the structural engineer or a licensed third-party testing agency, and the general contractor must give at least five days notification once ready for inspection.\"}]","PLN20_170 Plans - Building Permit Set | PDF",1792832852,63]