[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-292742-105":59,"doc-detail-292742-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pj07-03-cost-benefit-analysis-cba-for-v3","PJ.07-03 - COST BENEFIT ANALYSIS (CBA) FOR V3","","This document provides an initial V3 Cost Benefit Analysis (CBA) performed for the “Mission Trajectory Driven Processes,” including the embedded activity of PJ.18-01a related to developing the enabling infrastructure. PJ.07 and PJ.18 coordinated to jointly contribute to the Mission Trajectory Driven Processes, with PJ.07-03 covering operations for Wave 1 OI steps and PJ.18-01a covering technical enablers. The V3 CBA is conducted as a combined effort from Airbus, ANS CR (B4), and EUROCONTROL.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pj07-03-cost-benefit-analysis-cba-for-v3/292742/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pj07-03-cost-benefit-analysis-cba-for-v3/292742.png","ImageObject",300,407,{"name":92,"@type":93},"Chumphorn","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-09-17",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the V3 cost benefit analysis in this document?","Question",{"text":112,"@type":113},"It provides an initial V3 Cost Benefit Analysis for the “Mission Trajectory Driven Processes,” including an embedded activity related to enabling infrastructure development.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How are PJ.07-03 and PJ.18-01a related within the Mission Trajectory Driven Processes?",{"text":117,"@type":113},"PJ.07 and PJ.18 coordinate together; PJ.07-03 focuses on operations for Wave 1 OI steps, while PJ.18-01a focuses on associated technical enablers.",{"name":119,"@type":110,"acceptedAnswer":120},"Which organizations contributed to the V3 CBA?",{"text":121,"@type":113},"The V3 CBA is a combined effort from Airbus, ANS CR (B4), and EUROCONTROL.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},292742,1791405170,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":4},2336475401981,"https://ap-avatar.wpscdn.com/avatar/22000c94efd8d5204d?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786935347598174694","INDUSTRIAL RESEARCH  \nSESAR SOLUTION  \nPJ.07-03: COST BENEFIT ANALYSIS (CBA) FOR V3  \nDeliverable ID: D4 .2.040  \nDissemination Level: PU  \nProject Acronym: PJ07 OAUO  \nGrant: 733020  \nCall: H2020-SESAR-2015-2  \nTopic: SESAR.IR-VLD.Wave1-09-2015  \nConsortium coordinator: EUROCONTROL  \nEdition date: 23 September 2019  \nEdition: 00.01.00  \nTemplate Edition: 02.00.01  \nSESAR SOLUTION  \nPJ.07-03: COST BENEFIT ANALYSIS (CBA) FOR V3  \nAuthoring & Approval  \n\n| Authors of the document |  |  |\n| --- | --- | --- |\n| Name/Beneficiary | Position/Title | Date |\n| PURVES, Kirsteen / EUROCONTROL | PJ.07-03 CBA Expert | 23/09/2019 |\n| JELINEK, Frank / EUROCONTROL | NET Unit R&D Expert, PJ.07-03 PCIT CBA 23/09/2019 |  |\n| KUREN, Igor / EUROCONTROL | Civil-Military ATM Expert, PJ.07-03 | 23/09/2019 |\n| REUBER, Edgar / EUROCONTROL | Civil-Military ATM Expert, PJ.18-01a | 23/09/2019 |\n| KUPSCH, Norbert / Airbus | \u003Cbr>WOC Expert | 23/09/2019 |\n| BLOCHING, Oliver / Airbus | \u003Cbr>WOC Expert | 23/09/2019 |\n| BROUCEK, Petr / ANS CR (B4) | \u003Cbr>ANSP Expert | 23/09/2019 |\n| PLEVKA, Jan / ANS CR (B4) | \u003Cbr>ANSP Expert | 23/09/2019 |\n| Reviewers internal to the project |  |  |\n| Name/Beneficiary | Position/Title | Date |\n| DELCOURTE, Kris / EUROCONTROL Project Manager PJ07 20/09/2019 |  |  |\n| HOVANCIK, Lumir / ANS CR (B4) Solution Contributor 20/09/2019 |  |  |\n| CIZEK, Vladimir / ANS CR (B4) Solution Contributor 20/09/2019 |  |  |\n| MARVAN, Vaclav / ANS CR (B4) Solution Contributor 20/09/2019 |  |  |\n| BREIVIK, Kim / EUROCONTROL NM Solution Contributor 20/09/2019 |  |  |\n| DECROLY , Francis /\u003Cbr>EUROCONTORL NM | NM Senior Expert 20/09/2019 |  |\n| NECULAE, Cezar / EUROCONTROL\u003Cbr>NM | Solution Contributor 20/09/2019 |  |\n| Approved for submission to the SJU By-Representatives of beneficiaries involved in the project |  |  |\n| Name/Beneficiary Position/Title |  | Date |\n| DELCOURTE, Kris / EUROCONTROL Project Manager PJ07 |  | 27/09/2019 |\n| HERMANN, Klaus Dieter / AIRBUS Solution Lead PJ.07-03\u003Cbr>Defence and Space |  | 27/09/2019 |\n| HLOUSEK, Petr / ANS CR (B4) Solution Contributor |  | 27/09/2019 |\n| Rejected By-Representatives of beneficiaries involved in the project |  |  |\n| Name/Beneficiary Position/Title |  | Date |\n\n© – 2019 – PJ07 Consortium.  \nAll rights reserved. Licensed to the SESAR Joint Undertaking under conditions.  \n2  \nSESAR SOLUTION  \nPJ.07-03: COST BENEFIT ANALYSIS (CBA) FOR V3  \nDocument History  \n\n| Edition | Date | Status | Author | Justification |\n| --- | --- | --- | --- | --- |\n| 00.00.01 | 08/05/2019 | Initial Draft | See list of authors | Initial Draft |\n| 00.00.02 | 22/08/2019 | Draft | See list of authors | Update with internal comments |\n| 00.01.00 | 30/09/2019 | Final | See list of authors | Delivery to SJU |\n\nCopyright Statement  \n© – 2019 – PJ07 Consortium. All rights reserved. Licensed to the SESAR Joint Undertaking under conditions.  \n© – 2019 – PJ07 Consortium.  \nAll rights reserved. Licensed to the SESAR Joint Undertaking under conditions.  \n3  \nSESAR SOLUTION  \nPJ.07-03: COST BENEFIT ANALYSIS (CBA) FOR V3  \nPJ07 OAUO  \nPJ07 OPTIMIZED AIRSPACE USERS OPERATIONS  \nThis Cost Benefit Analysis is part of a project that has received funding from the SESAR Joint Undertaking under grant agreement No 733020 under European Union’s Horizon 2020 research and innovation programme.  \nAbstract  \nThis document provides an initial V3 Cost Benefit Analysis (CBA) performed for the “Mission Trajectory Driven Processes” including the embedded activity of PJ. 18-01a related to developing the enabling infrastructure.  \nBoth PJ.07 and PJ.18 coordinated and worked together to jointly contribute to the development of the Mission Trajectory Driven Processes. They focus on the same concept, with Solution PJ.07-03 focusing on the operations by addressing the OI Steps allocated to Wave 1, and PJ. 18-01a focusing on the associated technical enablers.  \nThis V3 CBA is a combined effort from Airbus, ANS CR (B4) and EUROCONTROL.  \n© – 2019 – PJ07 Consort","cbCaiqIeDHwty8wL","https://ap.wps.com/l/cbCaiqIeDHwty8wL","pdf",2987446,73,"English","# 1 Executive Summary\n# 2 Introduction\n## 2.1 Purpose of the document\n## 2.2 Scope\n## 2.3 Intended readership\n## 2.4 Structure of the document\n## 2.5 Background\n## 2.6 Glossary of terms\n## 2.7 List of Acronyms\n# 3 Objectives and scope of the CBA\n## 3.1 Problem addressed by the solution\n## 3.2 SESAR Solution description\n## 3.3 Objectives of the CBA\n## 3.4 Stakeholders identification\n## 3.5 CBA Scenarios and Assumpt","[{\"question\":\"What is the purpose of the V3 cost benefit analysis in this document?\",\"answer\":\"It provides an initial V3 Cost Benefit Analysis for the “Mission Trajectory Driven Processes,” including an embedded activity related to enabling infrastructure development.\"},{\"question\":\"How are PJ.07-03 and PJ.18-01a related within the Mission Trajectory Driven Processes?\",\"answer\":\"PJ.07 and PJ.18 coordinate together; PJ.07-03 focuses on operations for Wave 1 OI steps, while PJ.18-01a focuses on associated technical enablers.\"},{\"question\":\"Which organizations contributed to the V3 CBA?\",\"answer\":\"The V3 CBA is a combined effort from Airbus, ANS CR (B4), and EUROCONTROL.\"}]","PJ.07-03 - COST BENEFIT ANALYSIS (CBA) FOR V3 | PDF",1789654802,184]