[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-650095-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-650095-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","pipe-material-conveyor-platform-fire-sprinkler-plan-installation-notes","PIPE MATERIAL - CONVEYOR PLATFORM FIRE SPRINKLER PLAN - Installation Notes","","Conveyor platform fire sprinkler plan specifying pipe materials, sprinkler fittings, elevation references, and field measurement requirements. Includes general notes to the owner covering regular maintenance and testing, tenant education, preventing freezing, and updating the system when construction or occupancy changes. Provides legend symbols for hangers, braces, and fire department connections, plus schedule-style data for sprinkler models, K-factors, temperatures, and finishes. Also notes NFPA installation requirements, UL/FM listing for hangers, and references to water flow test information.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/pipe-material-conveyor-platform-fire-sprinkler-plan-installation-notes/650095/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/pipe-material-conveyor-platform-fire-sprinkler-plan-installation-notes/650095.png","ImageObject",300,407,{"name":42,"@type":43},"Aria Callaghan","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-05","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What must be done before fabrication according to the plan?","Question",{"text":63,"@type":64},"All pipe locations must be field-measured prior to fabrication.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What organization standards are referenced for installation and system care?",{"text":68,"@type":64},"Installation of pipe and hangers follows NFPA requirements, and the sprinkler system must be maintained and tested regularly in accordance with NFPA.",{"name":70,"@type":61,"acceptedAnswer":71},"What happens if construction or occupancy changes?",{"text":72,"@type":64},"The fire sprinkler system must be updated accordingly.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},650095,1792816604,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":80,"read_time":30,"preview_page_count":4},962084926284,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","# PIPE MATERIAL\n\nPLATFORM  \n\n| 1”SCH.40 THREADED BLACK STEEL W/THREADED CAST IRON FITTINGS  \u003Cbr>12”-22”SCH.10 GROOVED BLACK STEEL W/GROOVED FIRELOCK FITTINGS w/WELDED &MECHANICAL OUTLETS  \u003Cbr>ALL DIMENSIONS &ELEVATIONS ARE CENTERLINE OF PIPE &STEEL UNLESS NOTED OTHERWISE  \u003Cbr>GENERAL NOTES  \u003Cbr>NOTES TO THE OWNER  \u003Cbr>1.ALL PIPE LOCATIONS ARE TO BE FIELD MEASURED PRIOR TO FABRICATION   |  | ABBREVIATIONS  \u003Cbr>DESCRIPTION  \u003Cbr>RN-RISER NIPPLE  \u003Cbr>UOS-UNDERSIDE OF SLAB  \u003Cbr>SP-SPRIG  \u003Cbr>TOS-TOP OF STEEL  \u003Cbr>CL-CENTERLINE  \u003Cbr>BTS-BELOW TOP OF STEEL  \u003Cbr>OC-ON CENTER   | SYMBOL   \u003Cbr>DESCRIPTION  \u003Cbr>SYMBOL  \u003Cbr>PIPE ELEVATION AFF  \u003Cbr>[10'-0\"]  \u003Cbr>ELEVATION BELOW TOP OF STEE  \u003Cbr>[*12”]  \u003Cbr>ELEVATION TOP OF STEEL  \u003Cbr>TOS  \u003Cbr>RISE UP/DOWN  \u003Cbr>o   | LEGEND  \u003Cbr>DESCRIPTION  \u003Cbr>SYMBOL  \u003Cbr>——  \u003Cbr>DENOTES HANGER LOCATION  \u003Cbr>十一  \u003Cbr>L  \u003Cbr>SWAY BRACE  \u003Cbr>丛  \u003Cbr>FIRE DEPT CONNECTION  \u003Cbr>ELECTRIC BELL   | TOT  \u003Cbr>SYM  \u003Cbr>◎  \u003Cbr>O   | AL THIS SHEET 39  \u003Cbr>NUMBER OF SPR  \u003Cbr>DESCRIPTION  \u003Cbr>VICTAULIC V27 PENDENT QUICK RESPONSE  \u003Cbr>VICTAULIC V27 UPRIGHT QUICK RESPONSE  \u003Cbr>VICTAULIC V27 SIDEWALL QUICK RESPONSE  \u003Cbr>ALL SPRINKLER SHALL HAVE HEAD GUARDS   | INKLERS  \u003Cbr>TOTAL THIS JOB 39  \u003Cbr>QTY  \u003Cbr>NPT  \u003Cbr>SPRK ID\\#|K-FACT  \u003Cbr>FINISH  \u003Cbr>TEMP  \u003Cbr>14  \u003Cbr>1/2”  \u003Cbr>5.6  \u003Cbr>V2708  \u003Cbr>155°  \u003Cbr>CHROME  \u003Cbr>1/2”  \u003Cbr>15  \u003Cbr>5.6  \u003Cbr>V2704  \u003Cbr>BRASS  \u003Cbr>155°  \u003Cbr>10  \u003Cbr>1/2”  \u003Cbr>5.6  \u003Cbr>V2710  \u003Cbr>CHROME  \u003Cbr>155°   | DRAWING  \u003Cbr>TITLE  \u003Cbr>CONVEYOR PLATFORM FIRE SPRINKLER PLAN  \u003Cbr>CONTRACT NO:FS10-0048  \u003Cbr>DRAWN BY:PJH  \u003Cbr>SCALE:1/4”=1'-0”  \u003Cbr>DATE:11-30-2010   | CONTRACTOR:  \u003Cbr>PROJECT:  \u003Cbr>edE  \u003Cbr>200 Nixon Lane  \u003Cbr>SmartPost  \u003Cbr>Edison,NJ 08837   | SHEET FS-1 OF 1   |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| AND INSTALLATION BY FIRE SPRINKLER CONTRACTOR.   | 1.THE FIRE SPRINKLER SYSTEM MUST BE MAINTAINED AND TESTED REGULARLY  \u003Cbr>BY YOU OR YOUR AGENTS ARE IN ACCORDANCE WITH NFPA.  \u003Cbr>2.YOU SHALL MAINTAIN SUFFICIENT HEAT THROUGHOUT THE PREMISES TO   |  |  |  |  |  |  |  |  |  |\n| 2.ALL DIMENSIONS SHOWN ARE CENTER TO CENTER.  \u003Cbr>3.HIGH TEMPERATURE HEADS ARE TO BE INSTALLED WHERE REQUIRED.  \u003Cbr>4.ALL PIPE AND HANGERS ARE TO BE INSTALLED AS PER NFPA\\#13.  \u003Cbr>5.HANGERS ARE TO BE U.L.LISTED AND FM APPROVED.  \u003Cbr>6.SEE PLAN VIEW FOR COMPLETE GENERAL NOTES   | PREVENT THE FIRE SRINKLER SYSTEM FROM FREEZING.  \u003Cbr>3.YOU SHALL INFORM TENANTS OF PROPER CARE NECESSARY TO  \u003Cbr>MAINTAIN THE SYSTEM.  \u003Cbr>4.IF THE CONSTRUCTION OR OCCUPANCY IS ALTERED IN ANY WAY,THE  \u003Cbr>FIRE SPRINKLER SYSTEM WILL HAVE TO BE UPDATED ACCORDINGLY   | AFF-AFTER FINISH FLOOR  \u003Cbr>NIC-NOT IN CONTRACT  \u003Cbr>TOR-TOP OF RISER  \u003Cbr>SLV-SLEEVE  \u003Cbr>BOR-BOTTOM OF RISER  \u003Cbr>WATER FLOW TEST INFORMATION  \u003Cbr>STATIC:  \u003Cbr>BY:  \u003Cbr>RESIDUAL:  \u003Cbr>DATE:  \u003Cbr>FLOW:  \u003Cbr>TIME:   | RISER/STANDPIPE  \u003Cbr>⊗  \u003Cbr>NEW PIPE  \u003Cbr>EXISTING PIPE  \u003Cbr>一-一  \u003Cbr>①  \u003Cbr>HYDRAULIC REFERENCE POINT   | 国  \u003Cbr>FLOW SWITCH  \u003Cbr>FIRE HYDRANT  \u003Cbr>分  \u003Cbr>8'-0”  \u003Cbr>CEILING HEIGHT  \u003Cbr>RISER RM  \u003Cbr>ROOM NAME   |  |  |  | REVISION:  \u003Cbr>DATE  \u003Cbr>\\#  \u003Cbr>DESCRIPTION  \u003Cbr>△  \u003Cbr>△   | PJHI   |  |\n\n4  \n金  \nFACSIMILE:  732-440-4658  \nwWW.PJHFIRESPRINKLERDESIGN.COM  \nTELEPHONE:732-440-4657  \nEATONTOWN,NJ 07724-1869  \n36 GINGER COURT,BUILDING 5,SUITE 36  \nFIRE SPRINKLER DESIGN,L.L.C.  \nCERTFED  \nNICET  \nMEMBER","cbCaittjXKMR2zEj","https://ap.wps.com/l/cbCaittjXKMR2zEj","pdf",461119,"English","# Platform\n## General Notes\n## Legend & Abbreviations\n## Water Flow Test Information\n## Pipe Material Schedule\n## Drawing Information","[{\"question\":\"What must be done before fabrication according to the plan?\",\"answer\":\"All pipe locations must be field-measured prior to fabrication.\"},{\"question\":\"What organization standards are referenced for installation and system care?\",\"answer\":\"Installation of pipe and hangers follows NFPA requirements, and the sprinkler system must be maintained and tested regularly in accordance with NFPA.\"},{\"question\":\"What happens if construction or occupancy changes?\",\"answer\":\"The fire sprinkler system must be updated accordingly.\"}]","PIPE MATERIAL - CONVEYOR PLATFORM FIRE SPRINKLER PLAN - Installation Notes | PDF"]