[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649082-105":59,"doc-detail-649082-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pilot-project-c-5-detailed-design-and-as-built-drawings-for-improvement-work-at-sisdol-short-term-landfill","Pilot Project C-5 - Detailed Design and As-built Drawings for Improvement Work at Sisdol Short-term Landfill","","Detailed design and as-built drawings for improvement work for the Sisdol short-term landfill under Pilot Project C-5. The document organizes work into general project information, concept design for the total site, phase-wise landfill development, and detailed facility design for phase 1. It covers site location and background, assessment of existing natural conditions, technical systems such as semi-aerobic landfill design and leachate treatment, and major facility components including liner systems, leachate collection, gas venting, drainage, and construction methods, followed by as-built drawings.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pilot-project-c-5-detailed-design-and-as-built-drawings-for-improvement-work-at-sisdol-short-term-landfill/649082/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pilot-project-c-5-detailed-design-and-as-built-drawings-for-improvement-work-at-sisdol-short-term-landfill/649082.png","ImageObject",300,407,{"name":92,"@type":93},"eBook King","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project and landfill scope does Pilot Project C-5 cover?","Question",{"text":112,"@type":113},"It covers detailed design and as-built drawings for improvement work at the Sisdol short-term landfill under Pilot Project C-5, intended to operate for a short-term period as part of a broader waste management development plan.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is the landfill site assessed and planned in the document?",{"text":117,"@type":113},"The document includes general project information with site location and background, plus assessment of existing natural conditions such as topographical survey, soil/geotechnical investigation, and hydro-geological investigation.",{"name":119,"@type":110,"acceptedAnswer":120},"What key facility systems are addressed in the phase-wise detailed design?",{"text":121,"@type":113},"Phase 1 detailed design includes earthwork for cover materials, liner system/ clay liners, leachate collection and associated aeration/recirculation, gas vent systems, storm water and groundwater drainage, and supporting infrastructure such as access roads, weighbridge, and control room improvements.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649082,1792898345,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Pilot Project C-5  \nDetailed Design and As-built Drawings for Improvement Work at Sisdol Short-term Landfill  \nTable of Contents  \nCHAPTER 1 GENERAL PROEJCT INFORMATION ...................................................... C.5-1  \n1.1 Site Location and Project Background.................................................................... C.5-1  \n1.2 Assessment of Existing Natural Conditions............................................................ C.5-1  \n1.2.1 Topographical Survey ................................................................................... C.5-1  \n1.2.2 Soil/ Geo-technical Investigation.................................................................. C.5-2  \n1.2.3 Hydro-Geological Investigation ................................................................... C.5-2  \nCHAPTER 2 CONCEPT DESIGN FOR THE TOTAL SITE............................................. C.5-3  \n2.1 Technical System .................................................................................................... C.5-3  \n2.1.1 Landfill Type: Semi-aerobic ......................................................................... C.5-3  \n2.1.2 Leachate Treatment System .......................................................................... C.5-3  \n2.2 Construction and Operation .................................................................................... C.5-4  \n2.2.1 Facilities........................................................................................................ C.5-5  \n2.2.2 Operational Management.............................................................................. C.5-5  \nCHAPTER 3 LANDFILL: PHASE-WISE DEVELOPMENT............................................ C.5-6  \n3.1 Alternative 1 ........................................................................................................... C.5-6  \n3.2 Alternative 2 ........................................................................................................... C.5-6  \n3.3 Comparison of Alternatives .................................................................................... C.5-7  \n3.4 Calculation of Landfill Capacity ............................................................................. C.5-8  \nCHAPTER 4 DETAILED DESIGN OF FACILITIES FOR PHASE 1 DEVELOPMENT .. C.5-9  \n4.1 Earthwork / Soil Provision for Cover Material ....................................................... C.5-9  \n4.2 Liner System/Clay Liner Procurement ................................................................... C.5-9  \n4.2.1 Preparation of Liner Basement and Laying of Mineral Liners ..................... C.5-10  \n4.2.2 Laying of Jute Mat and Drainage Carpet ...................................................... C.5-11  \n4.3 Leachate Collection System .................................................................................... C.5-13  \n4.3.1 Leachate Collection Pipes............................................................................. C.5-13  \n4.4 Gas Vent System ..................................................................................................... C.5-14  \n4.4.1 Gas Vent System (Over Main Leachate Pipe) .............................................. C.5-14  \n4.4.2 Gas Vent System (over Branch Leachate Pipe) ............................................ C.5-15  \n4.5 Leachate Retention Pond ........................................................................................ C.5-15  \n4.6 Leachate Aeration and Recirculation System ......................................................... C.5-15  \n4.7 Storm Water and Groundwater Drainage................................................................ C.5-16  \n4.8 Improvement of Waste Bordering Dam .................................................................. C.5-17  \n4.9 Improvement of Control Room ............................................................................... C.5-17  \n4.10 Weighbridge.........................................................","cbCaivXGXJSjWFzW","https://ap.wps.com/l/cbCaivXGXJSjWFzW","pdf",2906756,76,"English","# CHAPTER 1 GENERAL PROEJCT INFORMATION\n## 1.1 Site Location and Project Background\n## 1.2 Assessment of Existing Natural Conditions\n### 1.2.1 Topographical Survey\n### 1.2.2 Soil/Geo-technical Investigation\n### 1.2.3 Hydro-Geological Investigation\n# CHAPTER 2 CONCEPT DESIGN FOR THE TOTAL SITE\n## 2.1 Technical System\n### 2.1.1 Landfill Type: Semi-aerobic\n### 2.1.2 Leachate Treatment System\n## 2.2 Construction and Operation\n### 2.2.1 Facilities\n### 2.2.2 Operational Management\n# CHAPTER 3 LANDFILL: PHASE-WISE DEVELOPMENT\n## 3.1 Alternative 1\n## 3.2 Alternative 2\n## 3.3 Comparison of Alternatives\n## 3.4 Calculation of Landfill Capacity\n# CHAPTER 4 DETAILED DESIGN OF FACILITIES FOR PHASE 1 DEVELOPMENT\n## 4.1 Earthwork/Soil Provision for Cover Material\n## 4.2 Liner System/Clay Liner Procurement\n### 4.2.1 Preparation of Liner Basement and Laying of Mineral Liners\n### 4.2.2 Laying of Jute Mat and Drainage Carpet\n## 4.3 Leachate Collection System\n### 4.3.1 Leachate Collection Pipes\n## 4.4 Gas Vent System\n### 4.4.1 Gas Vent System (Over Main Leachate Pipe)\n### 4.4.2 Gas Vent System (Over Branch Leachate Pipe)\n## 4.5 Leachate Retention Pond\n## 4.6 Leachate Aeration and Recirculation System\n## 4.7 Storm Water and Groundwater Drainage\n## 4.8 Improvement of Waste Bordering Dam\n## 4.9 Improvement of Control Room\n## 4.10 Weighbridge\n## 4.11 Access Road (Internal Service Road)\n## 4.12 Proposed Construction Methods\n# CHAPTER 5 AS BUILT DRAWINGS","[{\"question\":\"What project and landfill scope does Pilot Project C-5 cover?\",\"answer\":\"It covers detailed design and as-built drawings for improvement work at the Sisdol short-term landfill under Pilot Project C-5, intended to operate for a short-term period as part of a broader waste management development plan.\"},{\"question\":\"How is the landfill site assessed and planned in the document?\",\"answer\":\"The document includes general project information with site location and background, plus assessment of existing natural conditions such as topographical survey, soil/geotechnical investigation, and hydro-geological investigation.\"},{\"question\":\"What key facility systems are addressed in the phase-wise detailed design?\",\"answer\":\"Phase 1 detailed design includes earthwork for cover materials, liner system/ clay liners, leachate collection and associated aeration/recirculation, gas vent systems, storm water and groundwater drainage, and supporting infrastructure such as access roads, weighbridge, and control room improvements.\"}]","Pilot Project C-5 - Detailed Design and As-built Drawings for Improvement Work at Sisdol Short-term Landfill | PDF",1792797199,192]