[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663668-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663668-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","ph085045-notices-to-contractor-public-works-construction-standard-plans","PH085045 - Notices to Contractor - Public Works Construction Standard Plans","","Plan sheet notes detailing contractor requirements for a City of Los Angeles public works improvement. Specifies work-hours, conformance to the latest Public Works Construction standard specifications and the “Brownbook” supplements, plan reference scope, and inspection procedures. Defines removals responsibilities, utility handling by others, potholing requirements for unstable subsurface conditions, and curb and gutter repair or replacement standards. Includes guidance on utility trench resurfacing and notice to adjacent property owners.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/ph085045-notices-to-contractor-public-works-construction-standard-plans/663668/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/ph085045-notices-to-contractor-public-works-construction-standard-plans/663668.png","ImageObject",300,407,{"name":42,"@type":43},"Patrick","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What work hours must the contractor follow?","Question",{"text":62,"@type":63},"Work hours are 9:00 AM to 3:30 PM Monday to Friday and 8:00 AM to 5:00 PM on Saturday.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What standards must all work conform to?",{"text":67,"@type":63},"All work must conform to the latest edition and supplements of the Standardspecifications for Public Works Construction adopted by the Board of Public Works of the City of Los Angeles, as modified by the corresponding issue of the latest “Brownbook”.",{"name":69,"@type":60,"acceptedAnswer":70},"How are removals and utilities handled in this project?",{"text":71,"@type":63},"The contractor must remove existing improvements that interfere with the project, while all utilities are removed or relocated by others.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663668,1793230241,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},549758146520,"https://ap-avatar.wpscdn.com/avatar/80002397d8c0411e94?_k=1775819394049821470","| INDEX TO SHEETS   |  |  |  |  |  | REFER  \u003Cbr>ENCES  \u003Cbr>BASIS  \u003Cbr>DESCRIPTION   | RW NO   |  | NW  \u003Cbr>◎F  \u003Cbr>BUREAU  \u003Cbr>●  \u003Cbr>◎F PUBLIC W◎RKS  \u003Cbr>S373⑨N S   | DESi6NING THE FUTURE  \u003Cbr>SERVING TLE PRESENT;  \u003Cbr>ENGNEERING  \u003Cbr>LA DPW   |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | FROM   | TO   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | STA12+21.12   | STA 17+19.77   |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | 582  \u003Cbr>084B197  \u003Cbr>DRAINAGE MAP  \u003Cbr>DISTRICT MAP  \u003Cbr>NAVD 1988  \u003Cbr>198.111  \u003Cbr>BM\\#18-07330 CUT SPKIN CONC BASE FOR FORMER   | 30FTNOF N CURB LINE PRODUCED OF IMPERIAL HWY   |  | BY:  \u003Cbr>DATE:  \u003Cbr>REVISIONS:  \u003Cbr>ON   |  |  | SERIAL NO  \u003Cbr>WORK ACCEPTED   | B-PERMITS  \u003Cbr>BF002479   |  |\n| REMODEL EXIST.  \u003Cbr>REMOVE &CONST.  \u003Cbr>WORK BY OTHERS  \u003Cbr>117TH ST  \u003Cbr>SHEET 3  \u003Cbr>S739NV SO73O人INNO5  \u003Cbr>CITYOFLOS ANGELES  \u003Cbr>ATHENS BLVD  \u003Cbr>L.A.cOUNTY(C.E.12-0766(   |  |  | BENCH MARKS   | BASIS  \u003Cbr>126.128  \u003Cbr>DESCRIPTION  \u003Cbr>BM\\#18-12051   | NAVD 1988  \u003Cbr>000ADJ  \u003Cbr>LA CO M N&TAGW CURB SAN PEDRO ST;1 FT S/0  \u003Cbr>BCR S/O IMPERIAL HWY   |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  | ON ×EDNI   |  |\n|  |  |  |  |  |  |  |  |  |  | BY:   |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  | DATE:  \u003Cbr>ST.TREES DIV.  \u003Cbr>APPROVALS:   | ST.LIGHTING  \u003Cbr>TOD   |  |  |  |  |\n|  |  |  | JURISDICTION.  \u003Cbr>COUNTY OF LOS ANGELES  \u003Cbr>APPLES ONLY TO WORK INAREAS OF3OUNTY  \u003Cbr>APPROVEDFOR CONSTRUCTION.   |  |  | Lo  \u003Cbr>REVIEWED  \u003Cbr>BY:   |  | DATE  \u003Cbr>DESIGN DIVISION-HIGHWAY DESIGN SECTION   |  | CITY ENGINEER  \u003Cbr>EE MOORE,P.E.   | 21  \u003Cbr>ACCEPTED BY:   |  | DATE  \u003Cbr>PLAN CHECKER   |  | DATE  \u003Cbr>ONVISION/DISTRICTENGINEER   |\n|  |  |  |  |  |  |  |  |  |  | BM 18-12051,EL.126.128,NAVD 1988,2000 ADJ  \u003Cbr>SEE PLAN SHEET 3,5  \u003Cbr>HORINONTAL CONTROL:  \u003Cbr>VERTICAL CONTROL:   | NOTES,KEY MAP  \u003Cbr>SHEET TITLE:   |  | VERMONTAVE@119TH ST  \u003Cbr>PEDESTRIAN AND TRAFFIC IMPROVEMENTS  \u003Cbr>PROJECT:   |  | VERMONT AV A119T工ST  \u003Cbr>7OS ANGELES,CA  \u003Cbr>ADDRESs:   |\n|  |  |  | 一8-13  \u003Cbr>Engineering  \u003Cbr>NV7M  \u003Cbr>562/3ud-6200 fax 562/695-2120  \u003Cbr>13191 Crossroads Parkway North,Suite 405,Industry,CA91746  \u003Cbr>PLANS PREPARED 8Y:   |  |  |  |  | DATE  \u003Cbr>KENNETHC.TAYLOR,P.E   |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  | PROJECT NO.   |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  | DRAWING NO.  \u003Cbr>SHEET 1 oF 6 SHEETS   |  |  |  |  |  |\n\nK  \n# 3.  STANDARD PLANS FOR THIS PROJECT\n\nSPPWC 140-3  \nWORK HOURS SHALL BE 9:00 AM TO 3:30 PM MONDAY TO FRIDAY AND 8:00 AM TO 5:00 PM ONSATURDAY.  \nH  \nG  \n       11  \n       12  \nSHT  \nPLANS OF  \nNO  \n1  \nTITLE SHEET(CITY OF L.A.)  \n2  \nSUBTITLE SHEET (L.A.COUNTY)  \n3  \nVERMONT AVE PLAN AND PROFILE  \n4  \n5  \n6  \nSIGNING AND STRIPING  \n7  \nCONSTRUCTION SYMBOLS  \nO]  \nO CONSTRUCT  \n[]EXISTING  \n□O  \n〇  \nREMOVE  \n1—CONCRETE CURB,SPPWC TYPE A1-8  \n1A—CONCRETE CURB,TYPE A*  \n2—CONCRETE CURB&GUTTER,SPPWC TYPE A2-8  \n2A—CONCRETE CURB&GUTTER,TYPE C*  \n12—CONCRETE WALK,T=4\"  \n13—CURB RAMP,SPPWC 111-4,CASE PER PLAN  \n13A—CURB RAMP,CASE C*  \n14—ASPHALT CONCRETE PAVEMENT,T=6\"  \n16—BASE MATERIAL,CMB T=18\"OR 6\"  \n17—ADJUST MANHOLE TO GRADE  \n20—REMOVE EXISTING TREE  \n23—GRADE ONLY  \n48—STREET LIGHT  \n*DENOTES CITY OF LOS ANGELES STD PLANS  \nPH085045  \n       13                               \n8  \n        3  \n        5  \n        7  \n        8  \n             2  \n       6  \n        4  \n# NOTICES TO CONTRACTOR\n\n1.  SPECIFICATIONS:  \nALL WORK SHALL CONFORM TO THE LATEST EDITION AND SUPPLEMENTS OF THE STANDARDSPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ADOPTED BY THE BOARD OF PUBLIC WORKSOF THE CITY OF LOS ANGELES AS MODIFIED BY THE CORRESPONDING ISSUE OF LATEST \"BROWNBOOK”.  \nTO B-PERMIT OFFICE.  \n# 2.  PLAN REFERENCES:THIS IMPROVEMENT CONSISTS OF WORK CALLED FOR ONLY ON THIS PLAN.\n\n(CITY OF LOS ANGELES STANDARD PLANS)  \nTYPES OF CURB AND GUTTER  \nS-410-2  \nS-442-3  \nCURB RAMP","cbCaicyq5m2EuQAe","https://ap.wps.com/l/cbCaicyq5m2EuQAe","pdf",633740,"English","# Notices to Contractor\n## Specifications\n## Plan References\n## Inspection\n## Removals\n## Pothole\n## Curb and Gutters\n## Utility Trenching\n## Notice to Adjacent Property Owner","[{\"question\":\"What work hours must the contractor follow?\",\"answer\":\"Work hours are 9:00 AM to 3:30 PM Monday to Friday and 8:00 AM to 5:00 PM on Saturday.\"},{\"question\":\"What standards must all work conform to?\",\"answer\":\"All work must conform to the latest edition and supplements of the Standardspecifications for Public Works Construction adopted by the Board of Public Works of the City of Los Angeles, as modified by the corresponding issue of the latest “Brownbook”.\"},{\"question\":\"How are removals and utilities handled in this project?\",\"answer\":\"The contractor must remove existing improvements that interfere with the project, while all utilities are removed or relocated by others.\"}]","PH085045 - Notices to Contractor - Public Works Construction Standard Plans | PDF"]