[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650312-105":59,"doc-detail-650312-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pe-stamped-plans-with-calculations-and-connection-details-permit-services","PE Stamped Plans with Calculations and Connection Details - Permit Services","","Permit Services specify the documentation needed to obtain a city permit, noting that local building regulations determine the required level of paperwork and that the purchaser bears permit costs. The package includes PE stamped mezzanine plans with calculations and connection details, including structural drawings, classification and compliance details, dimensions and fastener information, engineering calculations, and installation drawings. It also emphasizes purchaser/end-user responsibility for quantities, dimensions, field coordination, and compliance with applicable electrical, fire, seismic, and safety codes. Anchor details and footing design are excluded.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pe-stamped-plans-with-calculations-and-connection-details-permit-services/650312/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pe-stamped-plans-with-calculations-and-connection-details-permit-services/650312.png","ImageObject",300,407,{"name":92,"@type":93},"Sarah ","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What determines the documentation required for a permit?","Question",{"text":112,"@type":113},"The level of documentation required is dictated by building regulations in the city/state for the specific project.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What documents are included in the PE stamped plans package?",{"text":117,"@type":113},"The package includes stamped structural plan and elevation drawings with design criteria, mezzanine classification and compliance details, overall and component dimensions with fastener details, and a copy of the engineering calculations, plus installation drawings and procedures.",{"name":119,"@type":110,"acceptedAnswer":120},"Which items are not included?",{"text":121,"@type":113},"Anchor detail and footing design are explicitly not included.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650312,1792824865,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","ENGINEERING SERVICES  \nPERMIT SERVICES  \nDescription  \nPermit Services include the specific documents that may be required when applying for a permit from the city.  \nBuilding regulations in your city/state will dictate the level of documentation necessary to obtain a permit for your project. It is the responsibility of the purchaser to be aware of which documents are needed. All permits are to be obtained at the purchaser’s expense.  \nPE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS  \nENGINEERING SERVICES  \nPE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS  \nENGINEERING SERVICES  \nPE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS  \nPE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS  \nCOGAN MEZZANINE PE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS (CONTACT COGAN FOR PRICING)  \nINCLUDED:  \nThis package is ideal when you are applying for a permit from the city. Our engineers will prepare specific drawings detailing the different aspects of the mezzanine that are generally required during the permitting process. Please note that Cogan is not responsible for any delays encountered during plan check and revisions that may be caused by city regulations. The permits are tobe obtained at the purchaser’s expense. Due to the variation of safety codes between regions, it is also the responsibility of the purchaser and/or end user to ensure that the product complies with all respective Electrical, Fire, Seismic, or Safety Codes, that pertain to the use and installation of the mezzanine. The purchaser and/or end user must arrange for the appropriate installation and testing of the Cogan mezzanine such that all State, Provincial or Local Safety codes are respected.  \n6 copies of the following:  \n Stamped structrual plan and elevation drawings including design criteria data.  \n Mezzanine classification details and compliance including mezzanine location based on information received by client.  \n Dimensions of the overall mezzanine as well as column and beam locations, fastener details an dimensions.  \n A copy of the engineering calculations.  \n* Please note that 1 (one) stamped version is included with this package. Any revisions and modifications afte the approval stage might incur additional costs.  \nStructural drawings including dimensions, design specifications and fastener specifications of the following:  \n Bracing  \n Column and baseplate  \n Beam to column connection  \n Beam to beam connection  \n Bridging  \n Flooring  \n Staircase  \n Handrail  \n Installation drawings and procedure supplied on delivery  \nENGINEERING SERVICES  \nPE STAMPED PLANS WITH CALCULATIONS AND CONNECTION DETAILS  \nPlease note that the purchaser and/or end user is responsible for all quantities and dimensions including the verification of, and coordination with field conditions. The purchaser and/or end user is also responsible for the building classification on all construction and warrants that all construction will be governed by the latest edition of the state or provincial building code (including any revisions or addendums) and/or with any other applicable code or requirements of all authorities having jurisdiction. Cogan mezzanines are designed in compliance with the National Code and the American and Canadian Institute of Steel Construction (NBCC and CISC in Canada and IBC and AISC in the U.S.) .  \nNOT INCLUDED:  \n Anchor detail and footing design.","cbCaisPYLD80nDg1","https://ap.wps.com/l/cbCaisPYLD80nDg1","pdf",675032,"English","# Permit Services\n## Included documents and deliverables\n## Responsibilities and code compliance\n## Excluded items","[{\"question\":\"What determines the documentation required for a permit?\",\"answer\":\"The level of documentation required is dictated by building regulations in the city/state for the specific project.\"},{\"question\":\"What documents are included in the PE stamped plans package?\",\"answer\":\"The package includes stamped structural plan and elevation drawings with design criteria, mezzanine classification and compliance details, overall and component dimensions with fastener details, and a copy of the engineering calculations, plus installation drawings and procedures.\"},{\"question\":\"Which items are not included?\",\"answer\":\"Anchor detail and footing design are explicitly not included.\"}]","PE Stamped Plans with Calculations and Connection Details - Permit Services | PDF"]