[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-489106-105":59,"doc-detail-489106-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pdc-scope-study-template-deliverable-outline-and-required-sections","PDC Scope Study Template - Deliverable Outline and Required Sections","","A Scope Study outlines the viability of a proposed construction or renovation project with an anticipated cost of $1,000,000 or less. It defines the project scope, concept design, and a conceptual cost estimate, guiding smaller projects and decision-making. The template specifies eligibility thresholds, when a full feasibility study may be required, and provides required deliverable sections including executive summary, existing facilities and conditions, stakeholder assessment, health and safety/code issues, proposed architectural program, renovation plan, concept design, risk register, conceptual cost estimate and schedule, and appendices such as detailed estimates, participants, meeting minutes, and photos.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pdc-scope-study-template-deliverable-outline-and-required-sections/489106/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pdc-scope-study-template-deliverable-outline-and-required-sections/489106.png","ImageObject",300,407,{"name":92,"@type":93},"Adam","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-24","2026-10-01",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of a Scope Study?","Question",{"text":112,"@type":113},"A Scope Study analyzes the viability of a proposed construction or renovation project and establishes project scope, concept design, and a conceptual cost estimate. It is less intensive than a full feasibility study while still supporting prioritization and decision-making.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When is a full feasibility study required instead of a Scope Study?",{"text":117,"@type":113},"A full feasibility study may be required if the Scope Study would result in a potential project with a total cost greater than $1mm, and it must be reviewed by SPACe and approved by both SPACe and UPAAC before moving to design. Whether a feasibility study or scope study is appropriate can also be determined by SPACe when submitting a project request.",{"name":119,"@type":110,"acceptedAnswer":120},"What sections must be included in the Scope Study report?",{"text":121,"@type":113},"The report should include: Executive Summary; Existing Facilities & Conditions (including stakeholder assessment and health/safety/accessibility/code issues); Proposed Architectural Program (if applicable); Proposed Renovation Plan (if applicable); Concept Design with drawings and risk register; Conceptual Cost Estimate & Project Schedule; and Appendices such as detailed estimates, study participants, meeting minutes, and photos of existing conditions.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},489106,1792980745,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":39,"preview_page_count":81,"preview_urls":144},1374404737137,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Scope Study–Template  \nA Scope Study is required to analyze the viability of a proposed construction or renovation project anticipated to cost $1,000,000 or less. These studies establish the project scope, concept design, and conceptual cost estimate. Less intensive than a full feasibility study, the Scope Study provides a focus on more minor projects, can inform project prioritization, and identify reasons to proceed or not proceed. When submitting a project request, customers may request a study for a particular project; however, SPACe will determine whether a full feasibility study or scope study is appropriate. Neither a scope nor feasibility study is required for projects anticipated to be $25,000 or less   or those deemed appropriate for assignment directly to a project manager.  \nScope Studies are appropriate to guide decision-making for projects such as laboratory, classroom, or office renovations or smaller-scale new construction projects. In some cases, Scope Studies may serve as an exploratory effort or precursor to a full feasibility study when a rough order of magnitude cost and basic concept design are needed to determine whether a more detailed examination is required.  \nAny scope study that results in a potential project with a total project cost greater than $1mm will be reviewed by SPACe and may require completion of a full feasibility study (to be approved by both SPACe and UPAAC) prior to moving to design.  \nRequired Elements:  \nThe Scope Study should be delivered in a report format and include the following sections:  \n01: Executive Summary  \nA. Project Description  \nB. Project Goals & Vision  \nC. Conceptual Cost & Schedule  \n02: Existing Facilities & Conditions  \nA. Investigation of Current Conditions  \nI. Stakeholder / Departmental Assessment  \nII. Health/Safety/Accessibility/Code Issues  \nIII. Asbestos and Hazardous Materials Assessment (can be provided by University Facilities)  \nB. Building Condition Assessment (if warranted, Data/Support to be provided by University Facilities)  \nC. Alignment of potential project with related maintenance programs (MRR, Green Tiger 1, Lab & Classroom Improvements, etc.)  \nD. Alignment of potential project with LRFP, CPIP, or existing feasibility study for a capital or proviso project to ensure the proposed project doesn't conflict with any anticipated larger efforts in the next 5 years.  \nUNIVERSITY FACILITIES CENTER, BUILDING A Planning, Design & Construction  \n280 Seneca Creek Road, Seneca, SC 29678 [www.clemson.edu/facilities](www.clemson.edu/facilities)  \nVersion 1.0  \nDate: 07/11/2024  \n03: Proposed Architectural Program (if applicable)  \nA. Program Overview / Program Requirements  \nB. Program Distribution  \nI. Distribution by Space Type (Instructional, Research, Office, etc.)  \nII. Distribution by Program/Department (for shared facilities)  \nC. Program Space List  \nI. Graphic Representation  \nII. Tabular Schedule of Spaces (to also be provided in spreadsheet format)  \nD. Identify existing personnel, rooms or groups, building and site items, and permanent or semi-permanent elements that must be relocated – permanently or temporarily. These items must be accounted for in the subsequent schemes, phasing plans and cost estimates.  \nThe scope study must clearly quantify any swing space necessary during project construction. The study should quantify the number of rooms, room types, square footage, and special equipment needs to be accommodated temporarily. The consultant team engaged for the Scope Study will work with Project Manager/Planner and Space Management staff to identify swing space and its availability during the proposed construction period.  \n04: Proposed Renovation Plan (if applicable)  \nA. Applicable Codes  \nB. Architectural and Interiors Narrative  \nC. Electrical, Lighting and Audio-Visual Narrative  \nD. Mechanical, Electrical, Plumbing and Fire Protection Narrative  \nE. Furniture Plan  \nF. Equipment Plan.  \na. Cut sheets are to be provided for any maj","cbCailppeazcr3q8","https://ap.wps.com/l/cbCailppeazcr3q8","pdf",220312,"English","# Required Elements\n## Executive Summary\n## Existing Facilities & Conditions\n## Proposed Architectural Program (if applicable)\n## Proposed Renovation Plan (if applicable)\n## Concept Design\n## Conceptual Cost Estimate & Project Schedule\n## Appendices","[{\"question\":\"What is the purpose of a Scope Study?\",\"answer\":\"A Scope Study analyzes the viability of a proposed construction or renovation project and establishes project scope, concept design, and a conceptual cost estimate. It is less intensive than a full feasibility study while still supporting prioritization and decision-making.\"},{\"question\":\"When is a full feasibility study required instead of a Scope Study?\",\"answer\":\"A full feasibility study may be required if the Scope Study would result in a potential project with a total cost greater than $1mm, and it must be reviewed by SPACe and approved by both SPACe and UPAAC before moving to design. Whether a feasibility study or scope study is appropriate can also be determined by SPACe when submitting a project request.\"},{\"question\":\"What sections must be included in the Scope Study report?\",\"answer\":\"The report should include: Executive Summary; Existing Facilities \\u0026 Conditions (including stakeholder assessment and health/safety/accessibility/code issues); Proposed Architectural Program (if applicable); Proposed Renovation Plan (if applicable); Concept Design with drawings and risk register; Conceptual Cost Estimate \\u0026 Project Schedule; and Appendices such as detailed estimates, study participants, meeting minutes, and photos of existing conditions.\"}]","PDC Scope Study Template - Deliverable Outline and Required Sections | PDF",1790820545,[145,149,153],{"page_no":8,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/f60343a1411b8e8a4fb52ec5cc353210.webp",983,1272,{"page_no":14,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/42b66f9efa01a755fad1c15eb85459c2.webp",982,1270,{"page_no":81,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/db313b4eba0e0d608d92645a65f303dc.webp",981,1269]