[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648508-105":59,"doc-detail-648508-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pavement-markings-standard-specifications-part-1-general","Pavement Markings-Standard Specifications - Part 1-General","","Standard specifications define preparation, materials, and execution requirements for pavement markings, including preparation of pavements and curbs, painting street center lines, crosswalks, parking stalls, fire lanes, walkways, symbols, and lettering. Reference standards include Seattle City specifications and plans plus MUTCD with revisions. The document covers submittals for product data, quality assurance via pre-installation coordination, regulatory and environmental compliance, and detailed construction controls such as surface readiness, weather limits, layout accuracy, installation sequencing, and thermoplastic suitability.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pavement-markings-standard-specifications-part-1-general/648508/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pavement-markings-standard-specifications-part-1-general/648508.png","ImageObject",300,407,{"name":92,"@type":93},"Kurz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-31","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":24},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does SECTION 1.01 cover for pavement markings?","Question",{"text":112,"@type":113},"It covers preparation for painting pavements and curbs, painting street markings like center lines and crosswalks, and painting parking stalls plus fire lane and walkway markings, symbols, and lettering.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What reference standards are required for this specification?",{"text":117,"@type":113},"Compliance references Seattle Standard Specifications and Standard Plans (2017) and MUTCD, using the latest edition with revisions per WSDOT.",{"name":119,"@type":110,"acceptedAnswer":120},"What environmental and installation conditions must be met before applying markings?",{"text":121,"@type":113},"Pavement must be clean and dry, and application temperature must be no lower than 50 degrees Fahrenheit. For thermoplastic on existing pavement, the pavement must be assessed to verify conditions are suitable for hot sprayed thermoplastic.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648508,1792793828,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":24,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":52},2336478945635,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Pavement Markings-Standard Specifications  \nA . Pavement Markings  \nPART 1-GENERAL  \n1.01 SECTION INCLUDES  \nA. Preparation for painting pavements and curbs.  \nB. Painting for street markings such as center lines and crosswalks.  \nC. Painting parking stalls, marking fire lane and walkways, symbols, and lettering.  \n1.02 REFERENCE STANDARDS  \nA. Seattle Standard Specifications – City of Seattle Standard Specifications for Road, Bridge, and Municipal Construction, 2017.  \nB. Seattle Standard Plans – City of Seattle Standard Plans for Municipal Construction, 2017.  \nC. MUTCD – Latest edition of Manual on Uniform Traffic Control Devices for Streets and Highways with latest revisions per WSDOT.  \n1.03 SUBMITTALS  \nA. Product Data: Pavement marking materials and colors.  \n1.04 QUALITY ASSURANCE  \nA. Pre-Installation Meeting:  \n1. Coordinate and attend meeting prior to painting.  \n2. Attendees to include paving contractor/installer, Owner, and Engineer.  \n3. Agenda:  \na. Owner expectations and installation requirements.  \nb. Sequence of Work, schedule, and responsibilities.  \nc. Existing pavement conditions and whether hot sprayed thermoplastic is suitable application for a parking lot because of pavement conditions.  \n1.05 REGULATORY REQUIREMENTS  \nA. Comply with City of Seattle standards.  \n1.06 ENVIRONMENTAL REQUIREMENTS  \nA. Pavement must be clean and dry.  \nB. Comply with manufacturer’s recommendations.  \nPART 2-PRODUCTS  \n2.01 PAINT  \nA. Streets/Roads, including center lines, edge/fog lines, stop-bars:  \n1. Reflectorized traffic line paint for street striping in accordance with Seattle Standard Specifications Section 9-29. Low VOC (volatile organic compound) solvent-based or waterborne paint.  \nB. Parking Stalls and ADA Access Aisles-Outdoor:  \n1. Reflectorized traffic line paint for parking stalls in accordance with Seattle Standard Specifications Section 9-29. Low VOC (volatile organic compound) solvent-based or waterborne paint.  \nC. Parking Stalls and ADA Access Aisles-Indoor:  \n1. Non-reflectorized traffic line paint for parking stalls in accordance with Seattle Standard Specifications Section 9-29. Low VOC (volatile organic compound) solvent-based or waterborne paint.  \nD. Crosswalks, Directional Arrows, Pedestrian Pathways, No-Parking Markings, Symbols, Lettering, Parking Stall End Bands, and all other Pavement Markings:  \n1. Type A – Liquid Hot Applied Thermoplastic in accordance with Seattle Standard Specifications Section 9-29.3(1) .  \nE. Color:  \n1. Street center lines: Yellow.  \n2. Fire lane markings: Yellow, Comply with City of Seattle Requirements.  \n3. All other applications: White.  \nPART 3-EXECUTION  \n3.01 EXAMINATION  \nA. Verify paving and curbing is complete, and surface is ready to receive painting and striping.  \nB. Verify paving and curbing is sufficiently cured.  \nC. Verify surfaces to receive painting and striping are dry and free of loose debris.  \nD. Verify weather forecast during planned time of placement is within weather limitations.  \nE. For parking lots, verify distance between curbs to ensure adequate width for the indicated number of stalls.  \nF. For thermoplastic application on existing pavement, assess pavement to verify whether pavement conditions are suitable for hot sprayed thermoplastic.  \n3.02 PREPARATION  \nA. Clean and prepare surface for receiving paint in accordance with Seattle Standard Specification Section 8-22.3(2) .  \n1. New pavement:  \na. Ensure pavement is sufficiently cured.  \nb. Air blast pavement with a high-pressure system to remove extraneous and loose materials.  \n2. Existing pavement:  \na. Remove existing pavement markings per Seattle Standard Specification Section 2- 02.3(3) J.  \nb. Cleaning and removal methods used shall not damage pavement surface. Grinding to remove pavement markings is not allowed.  \nc. Air blast pavement with a high-pressure system to remove extraneous and loose materials.  \nB. Layout lines and symbols to spacing and locations shown on Drawings.  \nC","cbCaig3QoeMqCRSl","https://ap.wps.com/l/cbCaig3QoeMqCRSl","pdf",171824,"English","# PART 1-GENERAL\n## SECTION INCLUDES\n## REFERENCE STANDARDS\n## SUBMITTALS\n## QUALITY ASSURANCE\n## REGULATORY REQUIREMENTS\n## ENVIRONMENTAL REQUIREMENTS\n# PART 2-PRODUCTS\n## PAINT\n## Color\n# PART 3-EXECUTION\n## EXAMINATION\n## PREPARATION\n## CONSTRUCTION\n## TOLERANCES","[{\"question\":\"What does SECTION 1.01 cover for pavement markings?\",\"answer\":\"It covers preparation for painting pavements and curbs, painting street markings like center lines and crosswalks, and painting parking stalls plus fire lane and walkway markings, symbols, and lettering.\"},{\"question\":\"What reference standards are required for this specification?\",\"answer\":\"Compliance references Seattle Standard Specifications and Standard Plans (2017) and MUTCD, using the latest edition with revisions per WSDOT.\"},{\"question\":\"What environmental and installation conditions must be met before applying markings?\",\"answer\":\"Pavement must be clean and dry, and application temperature must be no lower than 50 degrees Fahrenheit. For thermoplastic on existing pavement, the pavement must be assessed to verify conditions are suitable for hot sprayed thermoplastic.\"}]","Pavement Markings-Standard Specifications - Part 1-General | PDF"]