[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-501176-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-501176-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","part-2-irrigation-scheme-development-plan-chapter-5-institutional-set-up-of-the-irrigation-scheme-51-demarcation-of-stakeholders-roles","PART 2 IRRIGATION SCHEME DEVELOPMENT PLAN - CHAPTER 5 INSTITUTIONAL SET-UP OF THE IRRIGATION SCHEME - 5.1 Demarcation of Stakeholders’ Roles","","Institutional arrangements for the Jebel Lado Irrigation Scheme are set out under Chapter 5, defining how responsibilities are allocated across MEDIWR directorates and additional national stakeholders. MEDIWR is tasked with feasibility, design, implementation, and O&M of main structures, supported by planning, water resources management, power/grid development, and hydrology and survey functions including hydromet data systems. MAFCRD, MWLCT, and MOE support on-farm management and environmental and wildlife conservation, while other bodies provide agriculture support, cooperatives, rural development, registration policies, environment impact assessment, surveying, statistics, transport infrastructure, and social welfare.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/part-2-irrigation-scheme-development-plan-chapter-5-institutional-set-up-of-the-irrigation-scheme-51-demarcation-of-stakeholders-roles/501176/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/part-2-irrigation-scheme-development-plan-chapter-5-institutional-set-up-of-the-irrigation-scheme-51-demarcation-of-stakeholders-roles/501176.png","ImageObject",300,407,{"name":42,"@type":43},"Riley","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-08","2026-10-03",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What responsibilities does MEDIWR have for the Jebel Lado Irrigation Scheme?","Question",{"text":63,"@type":64},"MEDIWR has primary responsibility for developing the scheme, including feasibility study, design works, implementation, and O&M of main structures, as well as monitoring and evaluation of the project.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which MEDIWR directorates are involved and what are their main functions?",{"text":68,"@type":64},"Key directorates include DID (construction/operation of irrigation infrastructure), DPP (planning, staff training, and M&E), DWRM (institutional framework and pollution mitigation), DPEG (power plant and grid work), and DHS (resource assessment, feasibility, and hydromet information systems).",{"name":70,"@type":61,"acceptedAnswer":71},"What roles do other stakeholders like MAFCRD and MOE play?",{"text":72,"@type":64},"MAFCRD develops crop water demand plans and manages on-farm irrigation, including farm plot allocation, cropping calendars, extension, and on-farm O&M. MOE handles environmental protection responsibilities such as EIA and watershed conservation, and advises states and local governments.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},501176,1791317146,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145,"preview_page_count":146,"preview_urls":147},1374391975076,"https://ap-avatar.wpscdn.com/avatar/14000253ca4ec9f6853?x-image-process=image/resize,m_fixed,w_180,h_180&k=1783305029341752051","PART 2 IRRIGATION SCHEME DEVELOPMENT PLAN  \nCHAPTER 5 INSTITUTIONAL SET-UP OF THE IRRIGATION SCHEME  \n5.1 Demarcation of Stakeholders’ Roles  \nMEDIWR takes primal responsibility to develop the Jebel Lado Irrigation Scheme, including feasibility study, design works, implementation, O&M of the main structures, and monitoring and evaluation of the project.  \nKey directorates of MEDIWR in development of the Jebel Lado Irrigation Scheme are six which, includes; Directorate of Irrigation and Drainage (DID), Directorate of Planning and Programmes (DPP), Directorate of Water Resources Management (DWRM), Directorate of Power Engineering and Grid (DPEG), and Directorate of Hydrology and Survey (DHS) . Their main functions in development of the Jebel Lado Irrigation Scheme are summarized in Table 5.1.1.  \nTable 5.1.1 Key Directorate of MEDIWR in National Irrigation Development Programme  \n\n| Organization | Stakeholders | Key Functions in Irrigation Development |\n| --- | --- | --- |\n| MEDIWR | Directorate of Irrigation and Drainage (DID) | Construction and operation of irrigation scheme; including pump station, canals, farm lots and flood control structures. |\n|  | Directorate of Planning and Programmes (DPP) | Coordinate staff training including State government staff; Coordinate planning process; Monitoring and Evaluation of the project implementation, Harmonize budgeting procedure for effective budget execution. |\n|  | Directorate of Water Resources Management (DWRM) | Establishment of institutional framework; Integrated Water Resources Management approach; Pollution prevention and mitigation. |\n|  | Directorate of Power\u003Cbr>Engineering and Grid (DPEG) | Construction, rehabilitation, maintenance and operation of power plant and grid. |\n|  | Directorate of Hydrology and Survey (DHS) | Resource assessment, feasibility studies, information management and research; Establishment of centralized hydromet and water use/abstraction information management system; Accumulation of long time historical Hydromet and water use/abstraction data/information using hydromet equipment installed at the Jebel Lado Irrigation Scheme. |\n\nSource: Main Functions of directorates MWRI  \nStrategic Plan 2012-2017, MWRI  \nProgramme Profile of IDMP, National Irrigation Development Programme (NISDP)  \nIn addition to MEDIWR, MAFCRD, MLFI, MOE, MWLCT and etc. are also important stakeholders in development of the Jebel Lado Irrigation Scheme. At the planning stage, MAFCRD is required to develop water demand plan for crops related the project. MAFCRD also takes responsibility for on-farm level irrigation management, including allocation of farm plot to farmers, preparation of cropping calendar, estimation of water demand, extension of irrigation farming, and O&M of irrigation facility at on-farm level.  \nMWLCT also plays important role for conservation of wild life in and around the project site, while MOE is a primal ministry for environmental protection including watershed conservation. Table 5.1.2 shows stakeholders and their key functions in Jebel Lado Irrigation Scheme development.  \nTable 5.1.2 Stakeholders Involved in National Irrigation Development Programme  \n\n| Organization | Stakeholders | Key Functions in Irrigation Development |\n| --- | --- | --- |\n| FSC | Food Security Council | Create a national food security policy to ensure adequate food availability throughout South Sudan. |\n| MAFCRD | Directorate of Agriculture Production and Extension Services (DAPES) | Promote development and adaptation of appropriate technology for irrigation farming; Establish and manage an effective agricultural extension service; Human resource |\n\n\n| Organization | Stakeholders | Key Functions in Irrigation Development |\n| --- | --- | --- |\n|  |  | training in the field. |\n|  | Directorate of Cooperatives (DC) | Provide guidance to establish cooperatives and issuance of the registration certificate if necessary. |\n|  | Directorate of Rural Development (DRD) | Provide technical ass","cbCaibuO9QMeu9Hl","https://ap.wps.com/l/cbCaibuO9QMeu9Hl","pdf",9610012,136,"English","# PART 2 IRRIGATION SCHEME DEVELOPMENT PLAN\n## CHAPTER 5 INSTITUTIONAL SET-UP OF THE IRRIGATION SCHEME\n## 5.1 Demarcation of Stakeholders’ Roles","[{\"question\":\"What responsibilities does MEDIWR have for the Jebel Lado Irrigation Scheme?\",\"answer\":\"MEDIWR has primary responsibility for developing the scheme, including feasibility study, design works, implementation, and O\\u0026M of main structures, as well as monitoring and evaluation of the project.\"},{\"question\":\"Which MEDIWR directorates are involved and what are their main functions?\",\"answer\":\"Key directorates include DID (construction/operation of irrigation infrastructure), DPP (planning, staff training, and M\\u0026E), DWRM (institutional framework and pollution mitigation), DPEG (power plant and grid work), and DHS (resource assessment, feasibility, and hydromet information systems).\"},{\"question\":\"What roles do other stakeholders like MAFCRD and MOE play?\",\"answer\":\"MAFCRD develops crop water demand plans and manages on-farm irrigation, including farm plot allocation, cropping calendars, extension, and on-farm O\\u0026M. MOE handles environmental protection responsibilities such as EIA and watershed conservation, and advises states and local governments.\"}]","PART 2 IRRIGATION SCHEME DEVELOPMENT PLAN - CHAPTER 5 INSTITUTIONAL SET-UP OF THE IRRIGATION SCHEME - 5.1 Demarcation of Stakeholders’ Roles | PDF",1791017687,343,14,[148,152,156,160,164,168,172,176,180,184,188,193,198,203],{"page_no":22,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1b265aae0d775b66a7ffd4ee32cce4ac.webp",983,1390,{"page_no":26,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a5af93cd2ccb1f4f718c0a44aa7dcd73.webp",982,1389,{"page_no":30,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/6d735d4af6933656d502b55bbd8642e7.webp",981,1387,{"page_no":33,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/3e31ab9bab5c7707e35161c791b749bf.webp",980,1386,{"page_no":97,"url":165,"width":166,"height":167},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a82510e5d97d72be09cab2b34c9cdaad.webp",979,1385,{"page_no":102,"url":169,"width":170,"height":171},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/dc56757f9cf8b1037b059370acca28c8.webp",978,1383,{"page_no":55,"url":173,"width":174,"height":175},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d6cf74af85b76b221fb5efbbb120bc90.webp",977,1382,{"page_no":111,"url":177,"width":178,"height":179},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/cea1d64baee30ba0b8fc37523cedc701.webp",976,1380,{"page_no":115,"url":181,"width":182,"height":183},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/06bdc66b3aa6073f273190cfb67744bc.webp",975,1379,{"page_no":123,"url":185,"width":186,"height":187},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a9fbadb4225e0d3a28b2bcf0311f00dc.webp",974,1378,{"page_no":189,"url":190,"width":191,"height":192},11,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/e56592378b68cee6a7eec3d460a65adf.webp",973,1376,{"page_no":194,"url":195,"width":196,"height":197},12,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1273de1512db7ea5a512cfe37e136346.webp",972,1375,{"page_no":199,"url":200,"width":201,"height":202},13,"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c588019ce9a185b60c90f74640cdf727.webp",971,1373,{"page_no":146,"url":204,"width":205,"height":206},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/46fa25fb74f629374dc826b3846d34f2.webp",970,1372]