[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-110519-en":3,"doc-seo-110519-105":30,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":14,"update_tm":28,"read_time":29},110519,8796095461564,"Liam","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",8,"Research & Report","Pakistan Sindh Flood Emergency Rehabilitation Project - Chair Summary - December 19, 2022","The Chair Summary records Executive Directors’ approval of an IDA credit of SDR 389.7 million (US$500 million equivalent) for the Pakistan Sindh Flood Emergency Rehabilitation Project (SFERP). It highlights the Bank Group’s coordinated post-disaster reconstruction role, emphasizing green and resilient recovery through a flexible build-back-better approach. Directors stress strengthening provincial and federal implementation capacity, transparent monitoring and evaluation, donor coordination, citizen engagement, resilient planning via a 4RF proposal, and accelerated reforms with the IMF to manage heightened macroeconomic risks.","Public Disclosure Authorized Public Disclosure Authorized  \nPakistan  \nSindh Flood Emergency Rehabilitation Project  \nChair Summary*  \nDecember 19, 2022  \nThe Executive Directors approved an IDA credit in the amount of SDR 389.7 million (US$500 million equivalent) for the Pakistan Sindh Flood Emergency Rehabilitation Project (SFERP) on the terms and conditions set out in the President’s Memorandum.  \nDirectors acknowledged the Bank’s leadership role in response to the unprecedented floods that have hit Pakistan and the significant needs for post-disaster reconstruction. They noted that this operation is part of a comprehensive response of the World Bank Group in coordination with other IFIs that supports a timely recovery for critical infrastructure systems. Directors appreciated that the design of all operations incorporates principles of green and resilient recovery and follows a flexible, build-back-better approach. They called for the recommendations in the Country Climate and Development Reports (CCDRs) to be reflected in country engagements while ensuring that solutions put in place can withstand future climate shocks.  \nDirectors underscored the need for provincial and federal authorities to strengthen the implementation systems in place to ensure increased absorption capacity of development funding and also ensure the adequate targeting of communities. They underscored the importance of having strong monitoring and evaluation systems in place to make sure reconstruction funds are used transparently and reach those most in need in the affected districts.  \nDirectors welcomed the emphasis on donor coordination and citizen engagement, in particular with regards to the post damage needs assessment and long-term flood preparation and response. They welcomed the Government's plan to present a Resilient, Recovery, Rehabilitation and Reconstruction (4RF) plan at adonors’ conference in Geneva on January 9, 2023. They also underscored the need to address the high macroeconomic risks, further aggravated by the impact of the floods, and encouraged the authorities to accelerate much-needed joint reforms with the IMF.  \n*This Summary is not an approved record.","cbCaih7BpAGdZXOr","https://ap.wps.com/l/cbCaih7BpAGdZXOr","pdf",63413,5,1,"English","en",105,"# Executive Directors Approval\n## Credit Amount and Project Purpose\n## Response, Recovery Approach, and Climate Resilience\n## Implementation, Monitoring, and Targeting\n## Donor Coordination, Citizen Engagement, and Policy Reforms\n## 4RF Plan and Next Steps","[{\"question\":\"What approval did the Executive Directors make for SFERP?\",\"answer\":\"They approved an IDA credit of SDR 389.7 million (US$500 million equivalent) for the Pakistan Sindh Flood Emergency Rehabilitation Project (SFERP) under the terms in the President’s Memorandum.\"},{\"question\":\"What recovery principles does the operation incorporate?\",\"answer\":\"The design of the operations follows green and resilient recovery principles and a flexible build-back-better approach, intended to withstand future climate shocks.\"},{\"question\":\"How should reconstruction funds be managed and monitored?\",\"answer\":\"Provincial and federal authorities must strengthen implementation systems to absorb development funding effectively and target affected communities. Strong monitoring and evaluation systems are needed to ensure transparent use of funds and delivery to the most affected districts.\"}]","Pakistan Sindh Flood Emergency Rehabilitation Project - Chair Summary - December 19, 2022 | PDF",1784485800,3,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"pakistan-sindh-flood-emergency-rehabilitation-project-chair-summary-december-19-2022","",{"@graph":36,"@context":85},[37,53,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,50],{"item":41,"name":42,"@type":43,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":29},"https://docshare.wps.com/document/research-report/",{"item":51,"name":13,"@type":43,"position":52},"https://docshare.wps.com/document/pakistan-sindh-flood-emergency-rehabilitation-project-chair-summary-december-19-2022/110519/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-29","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What approval did the Executive Directors make for SFERP?","Question",{"text":75,"@type":76},"They approved an IDA credit of SDR 389.7 million (US$500 million equivalent) for the Pakistan Sindh Flood Emergency Rehabilitation Project (SFERP) under the terms in the President’s Memorandum.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"What recovery principles does the operation incorporate?",{"text":80,"@type":76},"The design of the operations follows green and resilient recovery principles and a flexible build-back-better approach, intended to withstand future climate shocks.",{"name":82,"@type":73,"acceptedAnswer":83},"How should reconstruction funds be managed and monitored?",{"text":84,"@type":76},"Provincial and federal authorities must strengthen implementation systems to absorb development funding effectively and target affected communities. Strong monitoring and evaluation systems are needed to ensure transparent use of funds and delivery to the most affected districts.","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,97,101,105,109,114,119,122,127,130,134],{"id":21,"doc_module":4,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":46,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":20,"doc_module":4,"doc_module_name":46,"category_name":106,"show_sort_weight":107,"slug":108},"Comic",60,"comic",{"id":110,"doc_module":4,"doc_module_name":46,"category_name":111,"show_sort_weight":112,"slug":113},6,"Technology",50,"technology",{"id":115,"doc_module":4,"doc_module_name":46,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":120,"slug":121},30,"research-report",{"id":123,"doc_module":4,"doc_module_name":46,"category_name":124,"show_sort_weight":125,"slug":126},9,"Religion & Spirituality",20,"religion-spirituality",{"id":125,"doc_module":4,"doc_module_name":46,"category_name":128,"show_sort_weight":125,"slug":129},"World Cup","world-cup",{"id":131,"doc_module":4,"doc_module_name":46,"category_name":132,"show_sort_weight":131,"slug":133},10,"Lifestyle","lifestyle",{"id":135,"doc_module":4,"doc_module_name":46,"category_name":136,"show_sort_weight":20,"slug":137},19,"General","general"]