[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-402182-105":59,"doc-detail-402182-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","painting-part-1-general","PAINTING - PART 1-GENERAL","","Section 09 90 00 outlines requirements for fluid-applied paints and coatings for interior and exterior surfaces within contract limits. It defines what surfaces must be painted, the paint system components (surface preparation, primer as scheduled, and finish coats as scheduled), and which surfaces are excluded (e.g., concealed items, specific materials, labeled doors/equipment, and items scheduled not to be painted). It also specifies references, required submittals, extra maintenance materials, quality assurance qualifications, delivery/storage/handling, field conditions, and a two-year guarantee against major coating failures.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/painting-part-1-general/402182/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/painting-part-1-general/402182.png","ImageObject",300,407,{"name":92,"@type":93},"dawugda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"Which surfaces are required to be painted under Section 09 90 00?","Question",{"text":113,"@type":114},"Visible interior and exterior surfaces within the contract limits must be painted, including surfaces on factory-primed or factory-finished roof-mounted mechanical and electrical equipment, unless scheduled as not to be painted in this section.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What surfaces are specifically not to be painted?",{"text":118,"@type":114},"The section excludes prefinished wall/ceiling/floor coverings, items with factory-applied final finishes (except defined roof-mounted equipment), concealed ducts/pipes/conduit, glass/plastic laminate/ceramic tile/anodized aluminum, steel surfaces embedded in concrete, and any surfaces specifically noted on drawings not to be painted, among other labeled items.",{"name":120,"@type":111,"acceptedAnswer":121},"What field conditions and minimum temperatures apply during application?",{"text":122,"@type":114},"Continuous ventilation and heating must maintain surface and ambient temperatures above 45°F for interiors prior to and through application, and exterior coatings cannot be applied during rain or with relative humidity above 50% unless manufacturers instructions permit otherwise. Minimum application temperatures are specified for latex paints and for varnish/transparent finishes.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},402182,1790957453,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":145,"read_time":36,"preview_page_count":19,"preview_urls":146},3985747870947,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","SECTION 09 90 00  \nPAINTING  \nPART 1-GENERAL  \n1.01 SUMMARY  \nA. Section Includes: Fluid applied paints and coatings. Upon completion of Work, all visible interior and exterior surfaces, within the Contract limits including factory primedor factory finished roof mounted mechanical and electrical equipment, shall be painted unless scheduled “Not to Be Painted” in this Section.  \n1. Each paint system includes:  \na. Surface preparation, including touch-up of shop applied primers, if needed.  \nb. Prime coat application, where scheduled as part of finish system.  \nc. Finish coat application, where scheduled apply two or more finish coats.  \n2. Paint semi-concealed areas (e.g. inside of light troughs and valances, behind grilles, and projecting edges above and below sight lines, behind wall-mounted items) .  \n3. Repair and Painting of existing surfaces.  \n4. Surface preparation and repair of surfaces treated for lead-based paint abatement work.  \nB. Surfaces Not To Be Painted:  \n1. Prefinished wall, ceiling, and floor coverings.  \n2. Items with factory-applied final finish except roof-mounted equipment as defined above.  \n3. Concealed ducts, pipes, and conduit.  \n4. Glass, plastic laminate, ceramic tile, anodized aluminum.  \n5. Surfaces of steel items that will be embedded in concrete.  \n6. Surfaces specifically scheduled or noted on the Drawings not to be painted.  \n7. Fire-Rating labels on doors and frames.  \n8. Performance Rating labels on equipment.  \n9. Nameplates, cable or device identification labels, code required signage, etc.  \nC. Related Sections:  \n1. Section 09 01 90, Repair and Painting Existing Previously Painted Surfaces  \n1.02 REFERENCES  \nA. ASTM International-American Society for Testing and Materials:  \n1. ASTM D 4442-Direct Moisture Content Measurement of Wood and Wood-Base Materials.  \n2. ASTM D 4444-Use and Calibration of Hand-Held Moisture Meters  \n3. ASTM D 6386-Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting  \nB. AQMD-Air Quality Management District  \n1. AQMD Regulations – Local Regulations  \nC. SCAQMD – South Coast Air Quality Management District  \n1. SCAQMD-1113-Rule 1113, Architectural Coatings  \nD. SSPC-Steel Structures Painting Council.  \n1.03 SUBMITTALS  \nA. Product Data: For each paint system product and accessory item  \nB. Samples: Of each specified finish system color, texture, and sheen; samples shall be minimum 8-1/2 by 11 inches in size.  \n1. Prepare transparent wood finish samples on type and quality of wood specified.  \nC. Certified Copies of moisture test results  \nD. Information Submittals  \n1. Statement of Qualifications from manufacturer  \n2. Statement of Qualifications from installer  \n3. Manufacturer's application instructions.  \nE. Closeout Submittals  \n1. Material Safety Data Sheets.  \nF. Submit Qualifications data for manufacturer and applicator required under Quality Assurance.  \n1.04 MAINTENANCE MATERIALS SUBMITTALS  \nA. For each color, type, and gloss of paint used in the work provide, as Extra Materials, a quantity equal to approximately 10 percent of the quantity required for its installation rounded to the nearest gallon, or five gallons, whichever is less.  \n1. Extra Materials shall be from same production run as installed materials.  \n2. Label each container with locations and dates of related installations; do not obscure manufacturer's label.  \n3. Deliver Extra Materials to Site as directed by Owner after providing 24 hours notice of delivery.  \n1.05 QUALITY ASSURANCE  \nA. Manufacturers Qualifications: Company with minimum 10-years’ experience manufacturing quality paint and finish products for commercial projects similar in scale and complexity to those required for this Project.  \nB. Applicator Qualifications: Company with minimum 5-years’ experience painting and finishing commercial projects similar in scale and complexity to those required for this Project.  \n1.06 DELIVERY, STORAGE AND HANDLING  \nA. Deliver produc","cbCaioiAGfrk6B9R","https://ap.wps.com/l/cbCaioiAGfrk6B9R","pdf",160738,16,"English","# 1.01 Summary\n# 1.02 References\n# 1.03 Submittals\n# 1.04 Maintenance Materials Submittals\n# 1.05 Quality Assurance\n# 1.06 Delivery, Storage and Handling\n# 1.07 Field Conditions\n# 1.08 Guarantee\n# 2.01 Paints and Coatings\n# 2.02 Materials","[{\"question\":\"Which surfaces are required to be painted under Section 09 90 00?\",\"answer\":\"Visible interior and exterior surfaces within the contract limits must be painted, including surfaces on factory-primed or factory-finished roof-mounted mechanical and electrical equipment, unless scheduled as not to be painted in this section.\"},{\"question\":\"What surfaces are specifically not to be painted?\",\"answer\":\"The section excludes prefinished wall/ceiling/floor coverings, items with factory-applied final finishes (except defined roof-mounted equipment), concealed ducts/pipes/conduit, glass/plastic laminate/ceramic tile/anodized aluminum, steel surfaces embedded in concrete, and any surfaces specifically noted on drawings not to be painted, among other labeled items.\"},{\"question\":\"What field conditions and minimum temperatures apply during application?\",\"answer\":\"Continuous ventilation and heating must maintain surface and ambient temperatures above 45°F for interiors prior to and through application, and exterior coatings cannot be applied during rain or with relative humidity above 50% unless manufacturers instructions permit otherwise. Minimum application temperatures are specified for latex paints and for varnish/transparent finishes.\"}]","PAINTING - PART 1-GENERAL | PDF",1790527765,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/df0a8782a768a3c066a28da97c3f99a7.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/5349efd6f03a65adbb410e538a5e25a7.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ac0b11630f5624d9e70a8e4e7ed2b208.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/935a2f9916d4adfe0b73040eb9cd79a9.webp",980,1268]