[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648658-105":59,"doc-detail-648658-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","pad-night-club-scope-of-work-and-millwork-notes","PAD - Night Club - Scope of Work and Millwork Notes","","Project documentation for PAD Night Club at 1330 Main St, Vancouver, BC, covering scope of work and detailed construction requirements. It lists new millwork, new equipment, and new ceiling details, with a structured set of drawings including floor plan, plan details, elevations, and sections. Notes specify finish submittals and approvals, fabrication and installation standards referencing AWMAC, cabinet and casework construction requirements, and installation procedures. It also includes construction, finishing, and wall partition requirements such as protection measures, sequencing, coordination, insulation, and acoustic tape.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/pad-night-club-scope-of-work-and-millwork-notes/648658/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/pad-night-club-scope-of-work-and-millwork-notes/648658.png","ImageObject",300,407,{"name":92,"@type":93},"Taylor Morgan","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-03","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What does the scope of work include for PAD Night Club?","Question",{"text":112,"@type":113},"The scope includes new millwork, new equipment, and new ceiling detail.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should millwork finishes be handled before fabrication?",{"text":117,"@type":113},"Millwork finishes must be submitted to the designer for approval prior to fabrication.",{"name":119,"@type":110,"acceptedAnswer":120},"What standard governs architectural woodwork quality?",{"text":121,"@type":113},"Architectural woodwork must meet or exceed the current AWMAC criteria for custom grade, referencing the AWMAC 1998 edition with authorized additions and amendments.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648658,1792794450,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},1099523885336,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","PAD . NIGHT CLUB 1330 MAIN ST . VANCOUVER B .C .  \nSCOPE OF WORK   \n1. NEW MILLWORK  \n2. NEW EQUPIMENT  \n3. NEW CEILING DETAIL  \nLIST OF DRAWINGS ID-00 COVER PAGE  \nID-00 NOTES AND SCHEDULES  \nID-01 FLOOR PLAN  \nID-02 PLAN DETAIL  \nID-03 ELEVATIONS  \nID-04 ELEVATIONS  \nID-05 SECTIONS  \nMILLWORK NOTES  \n1. All millwork finishes are to be submitted to designer for approval prior to fabrication  \n2. Millwork contractor to submit shop drawings to designer for review prior to fabrication or installation  \n3. Architectural woodwork shall be manufactured and / or installed to meet or exceed the criteria in the current AWMAC for custom grade  \n4. Details shown are for appearance purposes only and are not intended to supersede fabrication methods  \n5. All cabinet components to be dadoed, glued and stapled together . .  \n\\#123 - 200 W 7TH AVE VANCOUVER, BC 604-555-2929  \nWWW .SEARLEDESIGN .CA  \nTHIS DRAWING + PROPOSAL IS THE PROPERTY OF SEARLE DESIGN + MANAGMEN AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN PERMISSION .  \nTHE CONTRACTOR MUST VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON SITE . DESIGNERS MUST BE INFORMED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWING .  \nCLIENTS APPROVAL FOR CONSRTUCTION  \nCLIENT  \nDATE:  \n  /  /2020  \nNOTE: Contractors will build as per these working drawings .  \nTHE PROCESS:  \nNO . DATE  \n01 FEB 20 02  \n03  \n04  \n05  \nDESCRIPTION  \nMILLWORK DRAWINGS  \nPROFESSIONAL STAMP:  \nCOVER PAGE  \n\n| Drawn\u003Cbr>SE\u003Cbr>Date 02/20/2020\u003Cbr>Project No . ASSIGNMENT \\#2 | Drawing No .\u003Cbr>ID-00 |\n| --- | --- |\n\nCONSTRUCTION NOTES  \n1. CONTRACTOR TO PROTECT EXISTING BUILDING AND CONTENTS DURING ENTIRE CONSTRUCTION PERIOD, POLLY TO BE USED WHERE REQUIRED, AND CARPET MATS USED AT ALL ENTRANCES TO CONSTRUCTION AREA.  \n2. JOB SITE TO BE MAINTAINED IN A NEAT AND TIDY CONDITION AT ALL TIMES \"LUMBER WRAP\" TO BE USED TO PROTECT WHERE APPLICABLE. TAPE TO FLOOR TO REDUCE TRIPPING HAZARDS.  \n4. GENERAL CONTRACTOR TO PROVIDE SEISMIC AND BRACING SUPPORT AS REQUIRED TO ACCOMMODATE BUILDING CODE REQUIREMENT. (THROUGHOUT)  \nFINISHING NOTES  \n1. TILE PATTERN AND INSTALLATION IS TO BE CONSULTED AND VERIFIED WITH DESIGNER PRIOR TO COMMENCEMENT.  \n2. ALL FLOORING IS TO BE INSTALLED PRIOR TO MILLWORK.  \n3. FINISHING TRADES ARE ALLOWED TO SUGGEST SIMILAR ALTERNATIVES TO SELECTIONS PROVIDED BUT A SAMPLE MUST BE PROVIDED AND IT MUST BE APPROVED BY THE DESIGNER PRIOR TO COMMENCEMENT.  \n ARCHITECTURAL WOODWORK & CASEWORK NOTES   \n1. THE \"QUALITY STANDARDS\" OF THE ARCHITECTURAL WOODWORK MANUFACTURERS ASSOCIATION  \n2. ALL SUBSTRATE TO BE 3/4 PLYWOOD UNLESS NOTED AS KERFKORE LUAN PLYWOOD ON DWG.  \n3. OF CANADA (AWMAC), 1998 EDITION, TOGETHER WITH AUTHORIZED ADDITIONS AND AMENDMENTS SHALL BE USED AS A REFERENCE STANDARD AND SHALL FORM PART OF THIS SPECIFICATION.  \n4. CASEWORK FOR HIGH PRESSURE LAMINATE FINISH SHALL BE AWMAC PREMIUM GRADE FLUSH OVERLAY CONSTRUCTION.  \n5. EXPOSED PARTS FINISH ON H. P. L. CASEWORK SHALL BE HIGH PRESSURE LAMINATE AS INDICATED ON THE DRAWINGS. SEMI-EXPOSED PARTS FINISH SHALL BE WHITE MELAMINE WITH SEMI-EXPOSED EDGES OF CASE AND SHELVES FINISHED IN H. P. L.  \n6. WALL LAMINATE TO BE GLUED TO ~~3~~4\" PLYWOOD AND NAILED TO WALL-EXPOSED EDGES TO BE FINISHES WITH MATCHING LAMINATE  \n7. CASEWORK HINGES SHALL BE BLUM NO. 75M-555 125 DEG. OPENING, ALL METAL, 4 WAY ADJUSTABLE, SPRING LOADED FOR CLOSURE.  \n8. RECESSED SHELF STANDARDS: ALL PREMIUM GRADE AND CUSTOM GRADE CASEWORK SHALL HAVE DOWELLED HOLES WITH 5 MM DIA. NICKEL PLATED METAL PINS, FULL HEIGHT AT 2\" O.C.  \n9. CABINET PULLS TO BE INTEGRATED AT 12\" DEEP AND 3\" LONG AND 2\" WIDE AND FINISHED IN MATCHING LAMINATE.  \n10. GROMMETS SHALL BE 2-1/2\" DIA. POLISHED CHROME AT MANUFACTURER'S OPTION.  \n11. TYPICAL COUNTER TOPS SHALL HAVE SELF EDGE DETAIL AS PER AWMAC DETAIL 312.6.1 W/ BACK SPLASH HEIGHTS AS SHOWN ON DWGS.  \n12. JOB CONDITIONS FOR INSTALLATION OF ARCHITECTURAL WOODWORK SHALL BE AS SPECIFIED UNDER PART 7, SECTION 703 OF THE AWMAC","cbCaiawBqQ9oKl8x","https://ap.wps.com/l/cbCaiawBqQ9oKl8x","pdf",2024548,"English","# Scope of Work\n# List of Drawings\n## Construction Notes\n## Finishing Notes\n## Architectural Woodwork & Casework Notes\n## Wall Partition Notes","[{\"question\":\"What does the scope of work include for PAD Night Club?\",\"answer\":\"The scope includes new millwork, new equipment, and new ceiling detail.\"},{\"question\":\"How should millwork finishes be handled before fabrication?\",\"answer\":\"Millwork finishes must be submitted to the designer for approval prior to fabrication.\"},{\"question\":\"What standard governs architectural woodwork quality?\",\"answer\":\"Architectural woodwork must meet or exceed the current AWMAC criteria for custom grade, referencing the AWMAC 1998 edition with authorized additions and amendments.\"}]","PAD - Night Club - Scope of Work and Millwork Notes | PDF",18]