[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-110997-en":3,"doc-seo-110997-105":29,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},110997,1099514068365,"Aurelia","https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068",8,"Research & Report","Overview of Status of Implementation of Ongoing Management Action Plans - Prepared in Response to Inspection Panel Investigation Reports","June 13, 2022 overview summarizes the status of implementing Management’s ongoing action plans prepared in response to Inspection Panel investigation reports. The content lists multiple projects across countries, presenting the latest progress report and the next progress report due. It also includes detailed activity status for the India Vishnugad Pipalkoti Hydro Electric Project, mapping management actions such as water loss management and resettlement/livelihood restoration to completion and ongoing statuses, including monitoring methods and community engagement.","Public Disclosure Authorized Public Disclosure Authorized  \nJune 13, 2022  \nOverview of Status of Implementation of Ongoing Management Action Plans  \nPrepared in Response to Inspection Panel Investigation Reports  \n\n| \\# | PROJECT | LATEST PROGRESS REPORT 1 | NEXT PROGRESS REPORT DUE |\n| --- | --- | --- | --- |\n| 1 | Albania – Integrated Coastal Zone Management and CleanUp Project\u003Cbr>(IPN Case \\#47) | 4th progress report, January 2012 | Final Note upon completion of\u003Cbr>all court proceedings in Albania (no predictable timeline) |\n| 2 | India – Vishnugad Pipalkoti Hydro Electric Project (IPN Case \\#81) | 7th progress report, February 2022 | 8th progress report, February 2023 |\n| 3 | Uganda – Water Management and Development Project & Private Power Generation (Bujagali) Project\u003Cbr>(IPN Case \\# | 2nd progress report, July 2021 | 3rd progress report, July 2022 |\n| 4 | Brazil – Teresina Enhancing Municipal Governance and Quality of Life Project Additional Financing (IPN Case \\# | 1st progress report December 2021 | 2nd progress report December 2022 |\n\n1 Reporting intervals may vary according to the Board’s specific request at the time of Action Plan approval.  \n1. Albania – Integrated Coastal Zone Management and Clean-Up Project  \nFourth Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#46596-AL) on the Albania Integrated Coastal Zone Management and Clean-up Project (IDA Credit No. 4083-ALB), January 13, 2012.  \nAll actions of the Management Action Plan are completed with the exception of the continuing implementation of the independently monitored judicial review. The fourth progress report provided details on actions related to the review. It also recorded the completion of the Social Vulnerability Assessment and actions related to communication with civil society and the business community, and the implementation progress of the restructured Project to date.  \nThis was the last Progress Report that Management submitted concerning implementation of the actions of the Management Action Plan. However, along with its monitoring of the progress on Project activities, the Bank will continue to monitor the progress of the case-by-case judicial review by utilizing a team of independent observers. Upon completion of the District Court and Court of Appeals processes, Management will issue a final report to the Board of Executive Directors concerning the outcomes of the cases.  \n2. India-Vishnugad Pipalkoti Hydro Electric Project  \nSeventh Progress Report on the implementation of Management’s Action Plan in response to the Inspection Panel Investigation Report (\\#89109-IN) on the India Vishnugad Pipalkoti Hydro Electric Project (Loan No. 8078-IN), February 17, 2022.  \nDETAILED STATUS OF ACTIVITIES IN THE MAP  \n\n| MANAGEMENT ACTION | STATUS OF MANAGEMENT ACTION |\n| --- | --- |\n| Water Loss and Alternative Water Sources:\u003Cbr>THDC conducts regular monitoring surveys ofthe 66 water sources, using both videography and flow measurement. If a water source dries up, THDC will design a replacement, in coordination with the affected villages, based on options including the following: (i) new gravity-fed water supply systems; (ii) reservoirs or cisterns for village bulk supply, filled either by diverting flow from a nearby stream, by pumping water from another source or by water trucks; or (iii) rechanneling the water source.\u003Cbr>Management will monitor the evolution of the water sources, and, if a water source dries up, assess the proposed replacement option, and supervise the implementation of works. The team will include water and sanitation specialists. | Completed.\u003Cbr>THDC continues videography and flow measurement, to monitor water sources on a six-monthly basis, and maintains a state of readiness to develop alternative water supply schemes should water loss be reported by any village. The last measurement was carried out by THDC in December 2021. As of December 2021, ther","cbCaiq2pD9MWvUFj","https://ap.wps.com/l/cbCaiq2pD9MWvUFj","pdf",395735,1,20,"English","en",105,"# Projects and Progress Timeline\n## Albania - Integrated Coastal Zone Management and Clean-Up Project\n## India - Vishnugad Pipalkoti Hydro Electric Project\n## Detailed Status of Activities in the MAP\n## Water Loss and Alternative Water Sources\n## Resettlement and Livelihood Restoration","[{\"question\":\"What is the document’s purpose and scope?\",\"answer\":\"The document provides an overview of the status of implementing Management’s ongoing management action plans prepared in response to Inspection Panel investigation reports, covering multiple projects and their progress timelines.\"},{\"question\":\"Which project is discussed with detailed status tables in this excerpt?\",\"answer\":\"The excerpt provides detailed status of activities in the MAP for the India - Vishnugad Pipalkoti Hydro Electric Project, including management actions and their current statuses.\"},{\"question\":\"How does the project address water loss and alternative water sources?\",\"answer\":\"THDC conducts regular monitoring of water sources using videography and flow measurement, designs replacement options if a source dries up, and supervises implementation with involvement of water and sanitation specialists.\"}]",1784488074,50,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":27},"overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports","",{"@graph":35,"@context":85},[36,53,68],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/overview-of-status-of-implementation-of-ongoing-management-action-plans-prepared-in-response-to-inspection-panel-investigation-reports/110997/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-22","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What is the document’s purpose and scope?","Question",{"text":75,"@type":76},"The document provides an overview of the status of implementing Management’s ongoing management action plans prepared in response to Inspection Panel investigation reports, covering multiple projects and their progress timelines.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"Which project is discussed with detailed status tables in this excerpt?",{"text":80,"@type":76},"The excerpt provides detailed status of activities in the MAP for the India - Vishnugad Pipalkoti Hydro Electric Project, including management actions and their current statuses.",{"name":82,"@type":73,"acceptedAnswer":83},"How does the project address water loss and alternative water sources?",{"text":84,"@type":76},"THDC conducts regular monitoring of water sources using videography and flow measurement, designs replacement options if a source dries up, and supervises implementation with involvement of water and sanitation specialists.","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,97,101,105,110,114,119,122,126,129,133],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":45,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":45,"category_name":112,"show_sort_weight":28,"slug":113},6,"Technology","technology",{"id":115,"doc_module":4,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":120,"slug":121},30,"research-report",{"id":123,"doc_module":4,"doc_module_name":45,"category_name":124,"show_sort_weight":21,"slug":125},9,"Religion & Spirituality","religion-spirituality",{"id":21,"doc_module":4,"doc_module_name":45,"category_name":127,"show_sort_weight":21,"slug":128},"World Cup","world-cup",{"id":130,"doc_module":4,"doc_module_name":45,"category_name":131,"show_sort_weight":130,"slug":132},10,"Lifestyle","lifestyle",{"id":134,"doc_module":4,"doc_module_name":45,"category_name":135,"show_sort_weight":106,"slug":136},19,"General","general"]